|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 12/12/2024 Measured TD: 7275 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 12/12/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20030865 | Expiration Date: | 5/29/2004 | Proposed Top PZ Location: | Sec: Twp: | Footage: 1980 FNL 1880 FEL | Bottom Hole Location: | Sec: Twp: | Footage: 1980 FNL 1880 FEL | Proposed Depth/Form: | 7250 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE |
| | |
Wellbore Completed | Completion Date: | 8/29/2003 | Spud Date: | 6/10/2003 | Spud Date Is: | ACTUAL | Measured TD: | 7275 ft. | Measured PB depth: | 7254 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: 1980 FNL 1880 FEL | Bottom Hole Location: | Sec: Twp: | Footage: 1980 FNL 1880 FEL | Log Types: | PECNLD, PEAILC, PEM, PECV, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 667 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 470, Top: 0 ft., Bottom: 667 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7268 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 475, Top: 3382 ft., Bottom: 7268 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4700 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 210, Top: 3450 ft., Bottom: 4700 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6832 ft. | | N | N | FORT HAYS | 7095 ft. | | N | N | CODELL | 7117 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/10/2022 Interval Top: 7119 ft. Interval Bottom: 7133 ft. Completed Information for Formation CODELL | 1st Production Date: | 9/11/2003 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/4/2011 | Treatment Summary: | CD REPERF 7119-7133 HOLES 42 SIZE .38. Re-Frac Codell down 4-1/2" Csg w/ 263,802 gal Slickwater w/ 208,320# 40/70, 4,000# SB Excel, 0# . CIBP set @ 7100' was removed on 4/25/11. | Formation Treatment | Treatment Date: | 8/29/2003 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7119 ft. | # Of Holes: | 58 | Interval Bottom: | 7133 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 12/12/2024 Interval Top: 6842 ft. Interval Bottom: 7133 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/11/2003 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/4/2011 | Treatment Summary: | CDREFRAC | Formation Treatment | Treatment Date: | 4/12/2007 | Treatment Summary: | NIOBRARA PERFS; 6849'-6902' CODELL PERFS; 7120'-7128' FRAC'D NB-CD W/366000# 20/40 MESH; 108371 GAL SAND LADEN FLUID |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 3 | BTU_GAS | 1230 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 3 | CALC_GOR | 39000 | CALC_MCF_GAS | 117 | CASING_PRESS | 986 | GRAVITY_OIL | 57 | MCF_GAS | 117 | TUBING_PRESS | 878 |
| Perforation Data: | Interval Top: | 6842 ft. | # Of Holes: | 149 | Interval Bottom: | 7133 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/10/2022 Interval Top: 6842 ft. Interval Bottom: 7006 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/11/2003 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/4/2011 | Treatment Summary: | CD REFRAC. | Formation Treatment | Treatment Date: | 4/12/2007 | Treatment Summary: | REPERF & REFRAC NBRR W/ 242,320 GALS FLUID & 200,360# 30/50 SAND 6842-6860 (1SPF) 6882-6908 (1SPF) 6976-7066 (1SPF) NBRR PERFS 8/21/2003 6849-6856 & 6878-6902 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1261 | CALC_BBLS_OIL | 2 | CALC_GOR | 16000 | CALC_MCF_GAS | 32 | CASING_PRESS | 680 | GRAVITY_OIL | 54 | TUBING_PRESS | 400 |
| Perforation Data: | Interval Top: | 6842 ft. | # Of Holes: | 91 | Interval Bottom: | 7006 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 12/12/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|