|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 3/1/2023 Measured TD: 7339 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 3/1/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 20030448 | Expiration Date: | 4/7/2004 | | Proposed Depth/Form: | 7600 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: N/2NE4 |
| | |
| Wellbore Completed | | Completion Date: | 11/14/2003 | | Spud Date: | 10/31/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7339 ft. | Measured PB depth: | 7265 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR, IND, DENSITY,NEUTRON, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 451 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 451 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7265 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 130, Top: 6494 ft., Bottom: 7265 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7265 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 2961 ft., Bottom: 6494 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2840 ft. | | N | N | | PARKMAN | 3660 ft. | | N | N | | SUSSEX | 4250 ft. | | N | N | | SHANNON | 4710 ft. | | N | N | | NIOBRARA | 6880 ft. | | N | N | | FORT HAYS | 7098 ft. | | N | N | | CODELL | 7135 ft. | | N | N | | CARLILE | 7160 ft. | | N | N | | GREENHORN | 7182 ft. | | N | N |
Formation CODL Formation Classification: GW Status: SI - 3/1/2023 Interval Top: 7137 ft. Interval Bottom: 7145 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.188 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | PRODUCING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/14/2003 | | Treatment Summary: | 11/14/03 BJ SERVICES FRACED W/2685 BBL OF 20 # VISTAR FLUID SYSTEM, 217,800# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/18/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 107 | | BTU_GAS | 1413 | | CALC_GOR | 2046 | | CASING_PRESS | 900 | | GRAVITY_OIL | 49 | | MCF_GAS | 219 |
| | Perforation Data: | | Interval Top: | 7137 ft. | # Of Holes: | 24 | | Interval Bottom: | 7145 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 02/28/2023 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|