|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2022 Measured TD: 7851 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2022 | Wellbore Permit | | Permit #: | 20031488 | Expiration Date: | 8/21/2004 | Proposed Depth/Form: | 7851 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: GRRS , Formation: GRANEROS , Order: 318A , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 |
| | |
Wellbore Completed | Completion Date: | 7/9/2003 | Spud Date: | 5/20/2003 | Spud Date Is: | ACTUAL | Measured TD: | 7851 ft. | Measured PB depth: | 7808 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, CD/CN, DUAL IND. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 581 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 135, Top: 0 ft., Bottom: 581 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7850 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 237, Top: 6698 ft., Bottom: 7850 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4110 ft. | | N | N | SHANNON | 4649 ft. | | N | N | NIOBRARA | 6986 ft. | | N | N | FORT HAYS | 7234 ft. | | N | N | CODELL | 7257 ft. | | N | N | GREENHORN | 7300 ft. | | N | N | GRANEROS | 7531 ft. | | N | N | MOWRY | 7686 ft. | | N | N | J-2 SAND | 7704 ft. | | N | N | SKULL CREEK | 7801 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 4/1/2022 Interval Top: 7692 ft. Interval Bottom: 7736 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/9/2003 | Treatment Summary: | PERF'D THE J SAND FROM 7692'-7697',7706'-7736' W/2 SPF. FRAC'D W/155,514# 20/40 SAND. FLOW BACK WELL. RIH W/PROD TBG. LAND TBG @ 7657'. SWAB. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 20 | BBLS_OIL | 12 | CALC_BBLS_H2O | 20 | CALC_BBLS_OIL | 12 | CALC_GOR | 50000 | CALC_MCF_GAS | 600 | CASING_PRESS | 400 | MCF_GAS | 600 |
| Perforation Data: | Interval Top: | 7692 ft. | # Of Holes: | 70 | Interval Bottom: | 7736 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 10/8/2003 Interval Top: 7318 ft. Interval Bottom: 7334 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/9/2003 | Treatment Summary: | SET CIBP@7620'. DUMP 2 SX CMT ON CIBP. PERF'D THE CODELL FROM 7318'-7334' W/4 SPF. RIH W/TBG. LAND EOT@7219'. FRAC'D THE CODELL TRIPLE ENTRY W/120,666 GAL DYNAFLOW-2 CROSSLINKED GEL CONTAINING 300,340# 20/40 SAND. FLOW BACK WELL. TURN WELL OVER TO PROD. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7219 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/8/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 59 | BBLS_OIL | 16 | CALC_BBLS_H2O | 59 | CALC_BBLS_OIL | 16 | CALC_GOR | 1375 | CALC_MCF_GAS | 22 | CASING_PRESS | 1060 | MCF_GAS | 22 | TUBING_PRESS | 200 |
| Perforation Data: | Interval Top: | 7318 ft. | # Of Holes: | 64 | Interval Bottom: | 7334 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 11/4/2003 Interval Top: 7318 ft. Interval Bottom: 7736 ft. Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | 0.375 in. | Formation Name: | J-CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/9/2003 | Treatment Summary: | DRILL CIBP. TIH W/PROD TBG. LAND TBG @ 7684', SWAB. TURN WELL OVER TO PRODUCTION. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7684 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/4/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 22 | BBLS_OIL | 16 | CALC_BBLS_H2O | 22 | CALC_BBLS_OIL | 16 | CALC_GOR | 14938 | CALC_MCF_GAS | 239 | CASING_PRESS | 970 | MCF_GAS | 239 | TUBING_PRESS | 920 |
| Perforation Data: | Interval Top: | 7318 ft. | # Of Holes: | 134 | Interval Bottom: | 7736 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/14/2009 Interval Top: 7092 ft. Interval Bottom: 7736 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/9/2003 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE RELEASED RBP @ 7200' ON 03-08-09. RELEASED RBP @ 7442' TO COMMINGLE THE JSND-NBRR-CDL. 03-09-09 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7668 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/14/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 20 | BTU_GAS | 1196 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 20 | CALC_GOR | 9550 | CALC_MCF_GAS | 191 | CASING_PRESS | 667 | GRAVITY_OIL | 59 | MCF_GAS | 191 | TUBING_PRESS | 144 |
| Perforation Data: | Interval Top: | 7092 ft. | # Of Holes: | 176 | Interval Bottom: | 7736 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 4/1/2022 Interval Top: 7092 ft. Interval Bottom: 7334 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/15/2009 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/9/2003 | Treatment Summary: | NBRR-CDL REFRAC & RECOMPLETION SET RBP @ 7442'. 02-03-09. RE-FRAC'D THE CODELL WITH 107,562 GALS 26# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,000# 20/40 SAND. 02-10-09 SET RFP @ 662'. 02-10-09. RELEASED ON 02-15-09. SET RBP @ 7200'. 02-15-09. (CONT |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7092 ft. | # Of Holes: | 100 | Interval Bottom: | 7334 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2027 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 12/31/2021 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|