Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21374
Well Classification: OW Status: PA - 11/30/2023
Well Name/No:FRICO #1-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/30/2023
FacilityID:266536LocationID:332555
County:WELD #123Location:NENE 14 3N65W 6
Field:WATTENBERG - #90750Elevation:4822 ft.
Planned Location:660FNL  660 FELLat/Long: 40.230737 / -104.623196Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.230820 / -104.623150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 11/30/2023             Measured TD: 7263 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 11/30/2023
Wellbore Permit
Permit #:20030334 Expiration Date:3/5/2004
Proposed Depth/Form:7300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2

Wellbore Completed
Completion Date:9/2/2003
Spud Date:3/22/2003Spud Date Is:ACTUAL
Measured TD:7263 ft.Measured PB depth:7231 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIGLGR, CDCNGR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 663 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 465, Top: 0 ft., Bottom: 663 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7260 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 415, Top: 2590 ft., Bottom: 7260 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6822 ft.NN
CODELL7100 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/1/2022                  Interval Top: 7102 ft.    Interval Bottom: 7118 ft.

 Completed Information for Formation CODELL
1st Production Date:9/16/2003Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7102 ft.# Of Holes:44
Interval Bottom:7118 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 11/30/2023                Interval Top: 6825 ft.    Interval Bottom: 7118 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/16/2003Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/6/2006
Treatment Summary:119,499 GALS FLUID & 261,900 LBS 30/50 SAND. CODELL PERF'D AT 7102-7118' AND 7104-7116'. NIOBRARA @ 6825-6883'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 7
CALC_BBLS_H2O 0
CALC_BBLS_OIL 7
CALC_GOR 15857
CALC_MCF_GAS 111
CASING_PRESS 1384
GRAVITY_OIL 50
MCF_GAS 111
TUBING_PRESS 825
Perforation Data:
Interval Top:6825 ft.# Of Holes:157
Interval Bottom:7118 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/1/2022                  Interval Top: 6825 ft.    Interval Bottom: 6982 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/16/2003Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/7/2007
Treatment Summary:172,009 GALS FLUID & 250,000 LBS 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1289
CALC_BBLS_H2O 0
CALC_BBLS_OIL 26
CALC_GOR 11885
CALC_MCF_GAS 309
CASING_PRESS 950
GRAVITY_OIL 52
Perforation Data:
Interval Top:6825 ft.# Of Holes:113
Interval Bottom:6982 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/30/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No