|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/12/2017 Measured TD: 8192 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/12/2017 | | Wellbore Permit | | | Permit #: | 20042342 | Expiration Date: | 10/26/2005 | | Proposed Depth/Form: | 8200 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,707-66, Unit Acreage: 80, Drill Unit: E2 SE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,318 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4100 ft., Bottom: 5200 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/12/2005 | | Spud Date: | 11/23/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 8192 ft. | Measured PB depth: | 8178 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DUAL INDUCTION, COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 896 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 896 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8181 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 245, Top: 6480 ft., Bottom: 8181 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5254 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 363, Top: 4110 ft., Bottom: 5254 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4515 ft. | | N | N | | NIOBRARA | 7314 ft. | | N | N | | FORT HAYS | 7590 ft. | | N | N | | CODELL | 7612 ft. | | N | N | | MOWRY | 8019 ft. | | N | N | | J SAND | 8029 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/12/2017 Interval Top: 8045 ft. Interval Bottom: 8075 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2005 | | Treatment Summary: | JSND COMPLETION FRAC'D THE J SAND 8045' - 8075' W/208,068 GAL FRAC FLUID AND 300,980# SAND. 12-05-04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8045 ft. | # Of Holes: | 60 | | Interval Bottom: | 8075 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: AB - 8/12/2017 Interval Top: 7612 ft. Interval Bottom: 7635 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2005 | | Treatment Summary: | CDL COMPLETION SET THE FRAC PLUG @ 7760'. 12-05-04 FRAC'D THE CODELL 7612' - 7635' W/135,786 GAL FRAC FLUID AND 301,170# SAND. 12-05-04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7612 ft. | # Of Holes: | 92 | | Interval Bottom: | 7635 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 1/14/2005 Interval Top: 7612 ft. Interval Bottom: 8075 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2005 | | Treatment Summary: | JSND-CDL COMMINGLE DRILLED OUT CFP @ 7760' AND CLEANED OUT TO 8135' TO COMMINGLE THE JSND-CDL. 01-12-05 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8028 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/14/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 18 | | BBLS_OIL | 15 | | CALC_BBLS_H2O | 18 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 18667 | | CALC_MCF_GAS | 280 | | CASING_PRESS | 800 | | MCF_GAS | 280 | | TUBING_PRESS | 500 |
| | Perforation Data: | | Interval Top: | 7612 ft. | # Of Holes: | 152 | | Interval Bottom: | 8075 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/12/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|