|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/25/2019 Measured TD: 7940 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/25/2019 | | Wellbore Permit | DRIFTED | | Permit #: | 20030147 | Expiration Date: | 2/23/2004 | | Proposed Depth/Form: | 7950 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: W/2SW/ | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 321, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 321, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 4/26/2003 | | Spud Date: | 4/12/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7940 ft. | Measured PB depth: | 7887 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL,DUAL INDUCTION, COMPENSATED DENSITY | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 418 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 0 ft., Bottom: 418 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7905 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 6650 ft., Bottom: 7905 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4242 ft. | | N | N | | SHANNON | 4756 ft. | | N | N | | NIOBRARA | 7114 ft. | | N | N | | FORT HAYS | 7357 ft. | | N | N | | CODELL | 7378 ft. | | N | N | | GREENHORN | 7419 ft. | | N | N | | GRANEROS | 7633 ft. | | N | N | | MOWRY | 7773 ft. | | N | N | | J-2 SAND | 7790 ft. | | N | N | | SKULL CREEK | 7890 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/26/2019 Interval Top: 7767 ft. Interval Bottom: 7820 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/26/2003 | | Treatment Summary: | PERF'D THE J SAND FROM 7767'-7785',-7791'-7820' W/1SPF. FRAC'D W/198,883 GAL SLICK WATER CONTAINING 161,660# 20/40 SAND. FLOW BACK WELL. RIH W/PROD TBG. SWAB |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7762 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/14/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | CALC_BBLS_H2O | 3 | | CALC_MCF_GAS | 54 | | CASING_PRESS | 1100 | | MCF_GAS | 54 | | TUBING_PRESS | 1100 |
| | Perforation Data: | | Interval Top: | 7767 ft. | # Of Holes: | 47 | | Interval Bottom: | 7820 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 1/20/2004 Interval Top: 7340 ft. Interval Bottom: 7360 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/26/2003 | | Treatment Summary: | SET CIBP @ 7750' 1/12/04; FRAC CODELL 7340-7360' W/104,540 GAL GEL AND 230,160# 20/40/ SAND. 1/16/04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/2004 | Test Method: | FLOWING | | Hours Tested: | 21 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 39 | | BBLS_OIL | 19 | | CALC_BBLS_H2O | 39 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 7158 | | CALC_MCF_GAS | 136 | | CASING_PRESS | 325 | | MCF_GAS | 136 |
| | Perforation Data: | | Interval Top: | 7340 ft. | # Of Holes: | 40 | | Interval Bottom: | 7360 ft. | Hole Size: | 0.33 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/5/2004 Interval Top: 7340 ft. Interval Bottom: 7820 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/26/2003 | | Treatment Summary: | SET CIBP @ 5010'. 2/1/04 RELEASED CIBP @ 5010' ON 2/2/04 & CIBP @ 7750' ON 2/3/04 TO COMMINGLE THE J SAND AND THE CODELL 2/3/04. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7745 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/5/2004 | Test Method: | FLOWING | | Hours Tested: | 22 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 33 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 33 | | CALC_GOR | 9091 | | CALC_MCF_GAS | 300 | | CASING_PRESS | 560 | | MCF_GAS | 300 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7340 ft. | # Of Holes: | 87 | | Interval Bottom: | 7820 ft. | Hole Size: | 0.33 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/11/2008 Interval Top: 7126 ft. Interval Bottom: 7820 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/26/2003 | | Treatment Summary: | JNBCD COMMINGLE DRILL OUT CFP @7250'. 3/7/08. DRILL OUT CBP @7450' COMMINGLE JNBCD 3/9/2008 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7760 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/11/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 36 | | BTU_GAS | 1199 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 36 | | CALC_GOR | 6333 | | CALC_MCF_GAS | 228 | | CASING_PRESS | 801 | | GRAVITY_OIL | 50 | | MCF_GAS | 228 | | TUBING_PRESS | 789 |
| | Perforation Data: | | Interval Top: | 7126 ft. | # Of Holes: | 167 | | Interval Bottom: | 7820 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/26/2019 Interval Top: 7126 ft. Interval Bottom: 7360 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/11/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/26/2008 | | Treatment Summary: | NB-CD RECOMPLETION SET CBP @7450'.2/18/08 REFRAC CODL W/3421 BBL DYNAFLOW 2WR & 245,060# 20/40 SAND 2/26/08. SET CFP @7250'. FRAC NBRR W/4535 BBL HYBRID DYNAFLOW 2WR & 250,120# 20/40 SND 2/26/08. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7126 ft. | # Of Holes: | 120 | | Interval Bottom: | 7360 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/26/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|