Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21357
Well Classification: GW Status: PA - 1/25/2024
Well Name/No:MCCOY #23-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/25/2024
FacilityID:266326LocationID:331826
Municipality/County:FIRESTONE / WELD #123Location:NESW 5 2N67W 6
Field:WATTENBERG - #90750Elevation:4872 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2130FSL  2130 FWLLat/Long: 40.165976 / -104.916234Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.166146 / -104.915933Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 1/25/2024             Measured TD: 7942 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 1/25/2024
Wellbore PermitDRIFTED
Permit #:20030148 Expiration Date:2/23/2004
Proposed Depth/Form:7950 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: E/2SW/
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:12/7/2003
Spud Date:11/18/2003Spud Date Is:ACTUAL
Measured TD:7942 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 460 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 193, Top: 0 ft., Bottom: 460 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7939 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 6388 ft., Bottom: 7939 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4177 ft.NN
NIOBRARA7116 ft.NN
FORT HAYS7349 ft.NN
CODELL7371 ft.NN
CARLILE7394 ft.NN
GREENHORN7411 ft.NN
MOWRY7780 ft.NN
J-2 SAND7796 ft.NN
SKULL CREEK7906 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/25/2024                 Interval Top: 7799 ft.    Interval Bottom: 7863 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/7/2003
Treatment Summary:PERF'D THE J SAND FROM 7799-7816', 7823-7848', 7853-7863' W/ 4 SPF. FRAC'D W/ 199,122 GAL SLICK WATER CONTAINING 162,360# 20/40 SAND. RIH W/ NC/SN, JTS, PRODUCTION TBG. LAND TBG @ 7784'. BROACH TBG TO SN. SWAB
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 56
BBLS_OIL 5
CALC_BBLS_H2O 56
CALC_BBLS_OIL 5
CALC_GOR 109000
CALC_MCF_GAS 545
CASING_PRESS 605
MCF_GAS 545
TUBING_PRESS 375
Perforation Data:
Interval Top:7799 ft.# Of Holes:208
Interval Bottom:7863 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/13/2023                Interval Top: 7372 ft.    Interval Bottom: 7392 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/7/2003
Treatment Summary:SET CIBP @7770'. PLACE 1 SK OF CMT ON CIBP. PERF CODELL FROM 7372-7392' W/4 SPF. FRAC W/102,270 GAL SLICK WATER CONTAINING 24,250# 20/40 SAND. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 50
BBLS_OIL 58
CALC_BBLS_H2O 50
CALC_BBLS_OIL 58
CALC_GOR 1948
CALC_MCF_GAS 113
CASING_PRESS 605
MCF_GAS 113
TUBING_PRESS 375
Perforation Data:
Interval Top:7372 ft.# Of Holes:80
Interval Bottom:7392 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 2/14/2004                 Interval Top: 7372 ft.    Interval Bottom: 7863 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:FLOWIN
Open Hole Completion:No
Formation Treatment
Treatment Date:12/7/2003
Treatment Summary:DRILL CIBP @ 7770'. RIH W/PRODUCTION TBG. LAND TBG @ 7787'.
Tubing Size:2.375 in.Tubing Setting Depth:7787 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/14/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 55
CALC_BBLS_H2O 3
CALC_BBLS_OIL 55
CALC_GOR 8800
CALC_MCF_GAS 484
CASING_PRESS 855
MCF_GAS 484
TUBING_PRESS 610
Perforation Data:
Interval Top:7372 ft.# Of Holes:288
Interval Bottom:7863 ft.Hole Size:

Formation JFHC                     Formation Classification:  GW                     Status:  CM - 3/11/2008                 Interval Top: 7164 ft.    Interval Bottom: 7863 ft.

 Completed Information for Formation J-FORT HAYS-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-FORT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/7/2003
Treatment Summary:JSND-NBRR-CDL COMMINGLED. DRILLED OUT CFP AND CBP TO COMMINGLE THE JSND-NBRR-CDL 03/07/08.
Tubing Size:2.375 in.Tubing Setting Depth:7782 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/11/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 29
BBLS_OIL 49
BTU_GAS 1199
CALC_BBLS_H2O 29
CALC_BBLS_OIL 49
CALC_GOR 5939
CALC_MCF_GAS 291
CASING_PRESS 729
GRAVITY_OIL 50
MCF_GAS 291
TUBING_PRESS 485
Perforation Data:
Interval Top:7164 ft.# Of Holes:368
Interval Bottom:7863 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/25/2024                 Interval Top: 7164 ft.    Interval Bottom: 7392 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/21/2008
Treatment Summary:NB-CD RECOMP: SET CIBP @7492' 2/15/08.RE-FRAC CODL W/133,416 GAL FRAC GEL FLD & 250,360# SND.2/21/08. SET CFP @7260' 2/21/08. FRAC NBRR W/4449 BBL HYBRID DYNAFLOW 2 WF & 250,860# SND 2/27/08.; COMMINGLE JNBCD DRILL OUT CFP & CBP ON 3/7/08 .
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 29
BBLS_OIL 49
CALC_BBLS_H2O 29
CALC_BBLS_OIL 49
CALC_GOR 5939
CALC_MCF_GAS 291
CASING_PRESS 729
MCF_GAS 291
TUBING_PRESS 485
Perforation Data:
Interval Top:7164 ft.# Of Holes:112
Interval Bottom:7392 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/21/2023                Interval Top: 7164 ft.    Interval Bottom: 7180 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7164 ft.# Of Holes:32
Interval Bottom:7180 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/25/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No