|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 6/16/2025 Measured TD: 7265 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 6/16/2025 | | Wellbore Permit | DRIFTED | | Permit #: | 20021931 | Expiration Date: | 11/4/2003 | | Proposed Depth/Form: | 7750 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKJNC , Formation: DAKOTA-J-NIOBRARA-CODELL , Order: 318A , Unit Acreage: 320, Drill Unit: E/2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 9/2/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7265 ft. | Measured PB depth: | 7239 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR, IND, DENSITY, NEUTRON, CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 412 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 210, Top: 0 ft., Bottom: 412 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7239 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 510, Top: 2768 ft., Bottom: 7239 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 2768 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 355, Top: 220 ft., Bottom: 2768 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2008 ft. | | N | N | | PARKMAN | 3465 ft. | | N | N | | SUSSEX | 3932 ft. | | N | N | | SHANNON | 4339 ft. | | N | N | | NIOBRARA | 6320 ft. | | N | N | | FORT HAYS | 6536 ft. | | N | N | | CODELL | 6583 ft. | | N | N | | CARLILE | 6598 ft. | | N | N | | GREENHORN | 6634 ft. | | N | N | | J SAND | 7034 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 11/5/2003 Interval Top: 7078 ft. Interval Bottom: 7088 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | 0.188 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/27/2003 | | Treatment Summary: | 3/27/03 BJ SERVICES FRACED WITH 1704 BBL OF 20# VISTAR GEL, 142,360# OF 20/40 MESH SAND AND 8000# OF 20/40 RESIN COATED SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/28/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 44 | | BBLS_OIL | 1 | | BTU_GAS | 1055 | | CALC_GOR | 50000 | | CASING_PRESS | 850 | | GRAVITY_OIL | 50 | | MCF_GAS | 50 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 7078 ft. | # Of Holes: | 24 | | Interval Bottom: | 7088 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 10/1/2012 Interval Top: 6586 ft. Interval Bottom: 6594 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/10/2012 | | Treatment Summary: | Re-Perf Codell, Frac'd Codell w/ 119 bbl FE-1A pad, 500 bbls 26# pHaser pad, 1887 bbls 26# pHaser fluid system, 219580# 20/40 Preferd Rock, 8000# 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6586 ft. | # Of Holes: | 24 | | Interval Bottom: | 6594 ft. | Hole Size: | 0.40625 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 6/16/2025 Interval Top: 6413 ft. Interval Bottom: 6594 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/20/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/27/2003 | | Treatment Summary: | 11/7/03 BJ SERVICES FRACED WITH 3582 BBL OF 20# VISTAR FLUID SYSTEM, 334,120# OF 20/40 MESH SAND AND 16,000# OF 20/40 RESIN COATED SAND. NIOBRARA PERFS 6413'-6419'. CODELL PERFS 6588'-6594'. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6572 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1269 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 2735 | | CALC_MCF_GAS | 21 | | CASING_PRESS | 859 | | GRAVITY_OIL | 47 | | MCF_GAS | 21 | | TUBING_PRESS | 583 |
| | Perforation Data: | | Interval Top: | 6413 ft. | # Of Holes: | 60 | | Interval Bottom: | 6594 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/16/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|