Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21078
Well Classification: GW Status: PR - 4/1/2024
Well Name/No:GAULKE #11-25A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2024
FacilityID:264552LocationID:311460
Municipality/County:FREDERICK / WELD #123Location:NESW 25 2N68W 6
Field:WATTENBERG - #90750Elevation:5000 ft.
Planned Location:2180FSL  1890 FWLLat/Long: 40.108147 / -104.954325Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.108247 / -104.954147Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2024             Measured TD: 8230 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2024
Wellbore Permit
Permit #:20054813 Expiration Date:1/8/2007
Proposed Depth/Form:8230 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 470 , Unit Acreage: 80, Drill Unit: E2SW4

Wellbore Completed
Completion Date:9/18/2002
Spud Date:8/27/2002Spud Date Is:ACTUAL
Measured TD:8230 ft.Measured PB depth:8179 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:     
Log Types:PECNLD,PEAILC,PEMLGR,CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 809 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 0 ft., Bottom: 809 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8211 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 4280 ft., Bottom: 8211 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4556 ft.NN
SHANNON5000 ft.NN
NIOBRARA7352 ft.NN
FORT HAYS7620 ft.NN
CODELL7641 ft.NN
J SAND8066 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 4/1/2024                  Interval Top: 8078 ft.    Interval Bottom: 8098 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/27/2004
Treatment Summary:Set sand plug @ 7890'.
Formation Treatment
Treatment Date:9/18/2002
Treatment Summary:SAND PLUG DEPTH: 7890' // SACKS SAND ON TOP: 2100# 20/40 FRAC SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 2
CALC_BBLS_OIL 2
CALC_GOR 103000
CALC_MCF_GAS 206
CASING_PRESS 460
GRAVITY_OIL 60
MCF_GAS 206
TUBING_PRESS 300
Perforation Data:
Interval Top:8078 ft.# Of Holes:60
Interval Bottom:8098 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/21/2010                 Interval Top: 7642 ft.    Interval Bottom: 7658 ft.

 Completed Information for Formation CODELL
1st Production Date:9/8/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/25/2010
Treatment Summary:Reperf CODL 7642-7658 Holes 32 Size 0.38. Refrac CODL w/ 201,936 gal SW & 151,200# 40/70 sand & 4,000# SB Excel.
Formation Treatment
Treatment Date:2/7/2006
Treatment Summary:145,475 GALS FLUID & 115,860 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 38
CALC_BBLS_H2O 0
CALC_BBLS_OIL 38
CALC_GOR 3080
CALC_MCF_GAS 117
CASING_PRESS 673
GRAVITY_OIL 48
MCF_GAS 117
TUBING_PRESS 355
Perforation Data:
Interval Top:7642 ft.# Of Holes:80
Interval Bottom:7658 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 4/1/2024                  Interval Top: 7352 ft.    Interval Bottom: 7658 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/8/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/25/2010
Treatment Summary:NBRR Perf 7352-7514 Holes 66 Size 0.38 CODL Perf 7642-7658 Holes 80 Size 0.38 Frac NBRR w/ 250 gal 15% HCl & 233,564 gal SW & 200,660# 40/70 sand & 4,000# SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 25
BTU_GAS 1378
CALC_BBLS_OIL 25
CALC_GOR 1720
CALC_MCF_GAS 43
CASING_PRESS 1707
GRAVITY_OIL 49
MCF_GAS 43
TUBING_PRESS 1155
Perforation Data:
Interval Top:7352 ft.# Of Holes:146
Interval Bottom:7658 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)216
GOR
GOR DeterminationMCFE
Average BOE per Day0.098
Average MCFE per Day0.591

 Federal Financial Assurance  i 

 Tribal Well  i No