|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/31/2018 Measured TD: 8355 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/31/2018 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 4/18/2013 | | Proposed Depth/Form: | 8355 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1077 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1077 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8349 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 6900 ft., Bottom: 8349 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5706 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 4170 ft., Bottom: 5711 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/2/2002 | | Spud Date: | 7/20/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8355 ft. | Measured PB depth: | 8301 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEU. | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1077 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1077 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8349 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 6900 ft., Bottom: 8349 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5706 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 4170 ft., Bottom: 5711 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 2220 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 74 ft., Bottom: 2220 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 74 ft., Depth: 2220 ft., Bottom: 2220 ft., Sacks: 500, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4780 ft. | | N | N | | NIOBRARA | 7329 ft. | | N | N | | FORT HAYS | 7732 ft. | | N | N | | CODELL | 7754 ft. | | N | N | | CARLILE | 7776 ft. | | N | N | | GREENHORN | 7803 ft. | | N | N | | BENTONITE | 8030 ft. | | N | N | | MOWRY | 8180 ft. | | N | N | | J-2 SAND | 8202 ft. | | N | N | | SKULL CREEK | 8294 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/31/2018 Interval Top: 8203 ft. Interval Bottom: 8245 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/26/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/2/2002 | | Treatment Summary: | Frac'd w/ 305,000# 20/40 sand, 687 bbls, CO2 & 2716 gal Dynafow-2 frac fluid. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 33917 | | CALC_MCF_GAS | 407 | | CASING_PRESS | 340 | | MCF_GAS | 407 |
| | Perforation Data: | | Interval Top: | 8203 ft. | # Of Holes: | 66 | | Interval Bottom: | 8245 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/4/2011 Interval Top: 7342 ft. Interval Bottom: 8203 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/4/2011 | | Treatment Summary: | CIBP SET @ 7820' AND CFP SET @ 7580 ON 4/30/11. BOTH DRILLED OUT 5/24/11. TUBING SET @ 6325 ON 5/24/11.
COMMINGLED ON 5/28/11. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6325 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/4/2011 | Test Method: | FLOWING | | Hours Tested: | 7 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 16 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 31 | | CALC_BBLS_OIL | 55 | | CALC_GOR | 6313 | | CALC_MCF_GAS | 346 | | CASING_PRESS | 371 | | GRAVITY_OIL | 47 | | MCF_GAS | 101 | | TUBING_PRESS | 138 |
| | Perforation Data: | | Interval Top: | 7342 ft. | # Of Holes: | 226 | | Interval Bottom: | 8203 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/31/2018 Interval Top: 7342 ft. Interval Bottom: 7774 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/24/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/30/2011 | | Treatment Summary: | NBRR-PERFED 7342-7354, 7514-7532, 4 SPF, 120 HOLES. FRAC'D W/145,362 GAL FRAC FLUID AND 250,380# SAND.
CD- PERFED 7754-7774, 2SPF, 40 HOLES. FRAC'D W/115,962 GAL FRAC FLUID AND 250,740# SAND.
CIBP SET @ 7820' AND CFP SET @ 7580 ON 4/0/11. BOTH DRILLED OUT 5/24/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7342 ft. | # Of Holes: | 160 | | Interval Bottom: | 7774 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/31/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|