Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21027
Well Classification: GW Status: PA - 6/12/2019
Well Name/No:GRENEMEYER #24-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/12/2019
FacilityID:264194LocationID:335620
County:WELD #123Location:SESW 26 1N67W 6
Field:WATTENBERG - #90750Elevation:5029 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:480FSL  2160 FWLLat/Long: 40.016089 / -104.859601Lat/Long Source: Calculated From Footages
As Drilled Location:504 FSL  2158 FWLLat/Long: 40.016250 / -104.859520Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/8/2018             Measured TD: 8337 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/8/2018
Wellbore Permit
Permit #:20021235 Expiration Date:7/9/2003
Proposed Depth/Form:8400 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: S2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5300 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4500 ft., Bottom: 5300 ft.

Wellbore Completed
Completion Date:8/6/2002
Spud Date:7/15/2002Spud Date Is:ACTUAL
Measured TD:8337 ft.Measured PB depth:8284 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CD / CN, CBL, DUAL IND.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1076 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 395, Top: 0 ft., Bottom: 1076 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8337 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 6750 ft., Bottom: 8337 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5785 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 4450 ft., Bottom: 6100 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4721 ft.NN
SHANNON5275 ft.NN
NIOBRARA7320 ft.NN
FORT HAYS7726 ft.NN
CODELL7748 ft.NN
GREENHORN7799 ft.NN
GRANEROS8024 ft.NN
BENTONITE8024 ft.NN
MOWRY8175 ft.NN
J-2 SAND8199 ft.NN
SKULL CREEK8292 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/12/2019                 Interval Top: 8199 ft.    Interval Bottom: 8241 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/6/2002
Treatment Summary:PERF THE J SAND FROM 8199'-8206' AND 8214'-8241' W/2 SPF. FRAC W/550,500# 20/40 SAND AND 178,000 GALS DYNAFLOW-2. FLOW BACK WELL. RIH W/TBG. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:8160 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 51
BBLS_OIL 21
CALC_BBLS_H2O 51
CALC_BBLS_OIL 21
CALC_GOR 27524
CALC_MCF_GAS 578
CASING_PRESS 500
MCF_GAS 578
TUBING_PRESS 300
Perforation Data:
Interval Top:8199 ft.# Of Holes:68
Interval Bottom:8241 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/12/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No