Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20977
Well Classification: OW Status: PA - 10/7/2024
Well Name/No:WELLS RANCH #33-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/7/2024
FacilityID:263935LocationID:331609
County:WELD #123Location:NWSE 34 6N63W 6
Field:WATTENBERG - #90750Elevation:4770 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2005FSL  1974 FELLat/Long: 40.441226 / -104.420801Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.441250 / -104.420330Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/7/2024             Measured TD: 6954 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/7/2024
Wellbore Permit
Permit #:20041154 Expiration Date:6/14/2005
Proposed Depth/Form:7865 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: 318 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: DKGP , Formation: DAKOTA GROUP , Order: 318A , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2

Wellbore Completed
Completion Date:8/5/2004
Spud Date:7/18/2004Spud Date Is:ACTUAL
Measured TD:6954 ft.Measured PB depth:6943 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:GR, IND, DENSITY, NEUTRON, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 414 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 414 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6943 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 722, Top: 0 ft., Bottom: 6943 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2735 ft.NN
PARKMAN3588 ft.NN
SUSSEX3945 ft.NN
SHANNON4275 ft.NN
NIOBRARA6484 ft.NN
FORT HAYS6710 ft.NN
CODELL6755 ft.NN
CARLILE6782 ft.NN
GREENHORN6802 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/9/2024                  Interval Top: 6757 ft.    Interval Bottom: 6765 ft.

 Completed Information for Formation CODELL
1st Production Date:9/23/2004Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/13/2011
Treatment Summary:Re-Perf Codell 6757-6765 (24 new holes) Original perf 6757-6765' (24 holes) Re-Frac'd Codell w/ 120 bbl Active Pad, 596 bbls of 26# pHaser pad, 2015 bbls of 26# pHaser, 217010# 20/40 , 8000 lbs 20/40 SB Excel
Formation Treatment
Treatment Date:8/5/2004
Treatment Summary:8/4/04 BJ SERVICES FRACED WITH 2584 BBL OF 20# VISTAR GEL, 217,440# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 35
BTU_GAS 1309
CALC_GOR 2171
CASING_PRESS 850
GRAVITY_OIL 46
MCF_GAS 76
TUBING_PRESS 775
Perforation Data:
Interval Top:6757 ft.# Of Holes:48
Interval Bottom:6765 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/7/2024                 Interval Top: 6492 ft.    Interval Bottom: 6765 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/2/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 24
BTU_GAS 1352
CALC_BBLS_H2O 10
CALC_BBLS_OIL 24
CALC_GOR 2958
CALC_MCF_GAS 71
GRAVITY_OIL 46
MCF_GAS 71
Perforation Data:
Interval Top:6492 ft.# Of Holes:76
Interval Bottom:6765 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/9/2024                  Interval Top: 6492 ft.    Interval Bottom: 6594 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/2/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/13/2011
Treatment Summary:Perf Niobrara "A" 6492-6494' (4 holes), Niobrara "B" 6586'-6594' (24 holes) Frac'd Niobrara W/ , 120 bbl FE-1A pad,1548 bbls of slickwater pad, 144 bbls of pHaser 20# pad, 2283 bbls 20# pHaser, 238600# 20/40, 12,000# 20/40 SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6492 ft.# Of Holes:28
Interval Bottom:6594 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/07/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
04/25/2023
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No