|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/7/2024 Measured TD: 6954 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/7/2024 | | Wellbore Permit | | | Permit #: | 20041154 | Expiration Date: | 6/14/2005 | | Proposed Depth/Form: | 7865 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: 318 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: DKGP , Formation: DAKOTA GROUP , Order: 318A , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2 |
| | |
| Wellbore Completed | | Completion Date: | 8/5/2004 | | Spud Date: | 7/18/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 6954 ft. | Measured PB depth: | 6943 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | GR, IND, DENSITY, NEUTRON, CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 414 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 414 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6943 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 722, Top: 0 ft., Bottom: 6943 ft., Determination Method: VISU | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2735 ft. | | N | N | | PARKMAN | 3588 ft. | | N | N | | SUSSEX | 3945 ft. | | N | N | | SHANNON | 4275 ft. | | N | N | | NIOBRARA | 6484 ft. | | N | N | | FORT HAYS | 6710 ft. | | N | N | | CODELL | 6755 ft. | | N | N | | CARLILE | 6782 ft. | | N | N | | GREENHORN | 6802 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 1/9/2024 Interval Top: 6757 ft. Interval Bottom: 6765 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/23/2004 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/13/2011 | | Treatment Summary: | Re-Perf Codell 6757-6765 (24 new holes) Original perf 6757-6765' (24 holes)
Re-Frac'd Codell w/ 120 bbl Active Pad, 596 bbls of 26# pHaser pad, 2015 bbls of 26# pHaser, 217010# 20/40 , 8000 lbs 20/40 SB Excel | | Formation Treatment | | Treatment Date: | 8/5/2004 | | Treatment Summary: | 8/4/04 BJ SERVICES FRACED WITH 2584 BBL OF 20# VISTAR GEL, 217,440# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 35 | | BTU_GAS | 1309 | | CALC_GOR | 2171 | | CASING_PRESS | 850 | | GRAVITY_OIL | 46 | | MCF_GAS | 76 | | TUBING_PRESS | 775 |
| | Perforation Data: | | Interval Top: | 6757 ft. | # Of Holes: | 48 | | Interval Bottom: | 6765 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/7/2024 Interval Top: 6492 ft. Interval Bottom: 6765 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/2/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 24 | | BTU_GAS | 1352 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 2958 | | CALC_MCF_GAS | 71 | | GRAVITY_OIL | 46 | | MCF_GAS | 71 |
| | Perforation Data: | | Interval Top: | 6492 ft. | # Of Holes: | 76 | | Interval Bottom: | 6765 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/9/2024 Interval Top: 6492 ft. Interval Bottom: 6594 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/2/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/13/2011 | | Treatment Summary: | Perf Niobrara "A" 6492-6494' (4 holes), Niobrara "B" 6586'-6594' (24 holes)
Frac'd Niobrara W/ , 120 bbl FE-1A pad,1548 bbls of slickwater pad, 144 bbls of pHaser 20# pad, 2283 bbls 20# pHaser, 238600# 20/40, 12,000# 20/40 SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6492 ft. | # Of Holes: | 28 | | Interval Bottom: | 6594 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/07/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 04/25/2023 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|