|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/13/2018 Measured TD: 7993 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/13/2018 | Wellbore Permit | | Permit #: | 20030917 | Expiration Date: | 5/29/2004 | Proposed Depth/Form: | 8100 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 311, Drill Unit: N/2 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 311, Drill Unit: N/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 311, Drill Unit: N/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407,407-66, Unit Acreage: 311, Drill Unit: N/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1040 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 395, Top: 0 ft., Bottom: 1040 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7993 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 275, Top: 6700 ft., Bottom: 7993 ft. |
| | |
Wellbore Completed | Completion Date: | 5/25/2002 | Spud Date: | 5/12/2002 | Spud Date Is: | ACTUAL | Measured TD: | 7993 ft. | Measured PB depth: | 7972 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: | Log Types: | CBL, CD/CN, DUAL IND, GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1040 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 395, Top: 0 ft., Bottom: 1040 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7993 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 275, Top: 6700 ft., Bottom: 7993 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4392 ft. | | N | N | SHANNON | 4870 ft. | | N | N | NIOBRARA | 6877 ft. | | N | N | FORT HAYS | 7208 ft. | | N | N | CODELL | 7232 ft. | | N | N | CARLILE | 7250 ft. | | N | N | GREENHORN | 7282 ft. | | N | N | GRANEROS | 7516 ft. | | N | N | BENTONITE | 7516 ft. | | N | N | MOWRY | 7667 ft. | | N | N | J-2 SAND | 7686 ft. | | N | N | SKULL CREEK | 7796 ft. | | N | N | DAKOTA | 7879 ft. | | N | N | LYTLE | 7948 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 5/15/2018 Interval Top: 7882 ft. Interval Bottom: 7924 ft. Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/25/2002 | Treatment Summary: | PERF THE DAKOTA SAND FROM 7882-7896' & 7919-7924' W/ 4 SPF. FLOW TEST WELL. RIH W/ PKR. FRAC W/ 52,600# 20/40 AND 7,400# 100 MESH AND 32,800 GALS DYNAFLOW 2. FLOW BACK WELL. REL PKR. RUN PROD TBG. SWAB |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 24 | BBLS_OIL | 3 | CALC_BBLS_H2O | 24 | CALC_BBLS_OIL | 3 | CALC_GOR | 173667 | CALC_MCF_GAS | 521 | CASING_PRESS | 700 | MCF_GAS | 521 | TUBING_PRESS | 550 |
| Perforation Data: | Interval Top: | 7882 ft. | # Of Holes: | 76 | Interval Bottom: | 7924 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 5/15/2018 Interval Top: 7686 ft. Interval Bottom: 7726 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/25/2002 | Treatment Summary: | SET RBP @ 7780'. PERF'D THE J SAND FROM 7686-7692', 7701-7708', 7712-7722', 7724-7726' W/ 2 SPF. FRAC'D W/ 161,000# 20/40 SAND IN 200,000 GALS SLICK WATER. RIH W/ PROD TBG. LAND TBG. SWAB |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7678 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/10/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 42 | BBLS_OIL | 1 | CALC_BBLS_H2O | 42 | CALC_BBLS_OIL | 1 | CALC_GOR | 289000 | CALC_MCF_GAS | 289 | CASING_PRESS | 420 | MCF_GAS | 289 | TUBING_PRESS | 165 |
| Perforation Data: | Interval Top: | 7686 ft. | # Of Holes: | 50 | Interval Bottom: | 7726 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 05/15/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|