|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 4/7/2025 Measured TD: 8028 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 4/7/2025 | | Wellbore Permit | | | Permit #: | 20092555 | Expiration Date: | 7/9/2011 | | Proposed Depth/Form: | 8028 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 80, Drill Unit: N2NW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 668 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 480, Top: 12 ft., Bottom: 668 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8016 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 6308 ft., Bottom: 8016 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4941 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: 3778 ft., Bottom: 4963 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/21/2002 | | Spud Date: | 5/6/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8028 ft. | Measured PB depth: | 7986 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | DIGLGR, CDCNGR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 668 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 668 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8016 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 6310 ft., Bottom: 8016 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8016 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 3780 ft., Bottom: 4950 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4434 ft. | | N | N | | NIOBRARA | 7144 ft. | | N | N | | FORT HAYS | 7398 ft. | | N | N | | CODELL | 7422 ft. | | N | N | | J SAND | 7835 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/7/2025 Interval Top: 7837 ft. Interval Bottom: 7900 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/28/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2011 | | Treatment Summary: | 3/21/11 -pushed CIBP to 7954'. Circ clean to commingle well.
3/23/11 -commingled J Sand with Greenhorn production | | Formation Treatment | | Treatment Date: | 5/21/2002 | | Treatment Summary: | CIBP PLACED AT 7780 WITH 2 SACKS OS CEMENT FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP AND CEMENT TO COMMINGLE WELL WITHIN THE NEXT 6 MONTHS. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7804 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/19/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | BTU_GAS | 1236 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 11000 | | CALC_MCF_GAS | 33 | | CASING_PRESS | 358 | | GRAVITY_OIL | 51 | | MCF_GAS | 33 | | TUBING_PRESS | 348 |
| | Perforation Data: | | Interval Top: | 7837 ft. | # Of Holes: | 104 | | Interval Bottom: | 7900 ft. | Hole Size: | 0.35 in. |
|
Formation GRNHN Formation Classification: GW Status: AB - 4/7/2025 Interval Top: 7608 ft. Interval Bottom: 7660 ft.| Completed Information for Formation GREENHORN | | 1st Production Date: | 12/1/2009 | Choke Size: | | | Formation Name: | GREENHORN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/17/2009 | | Treatment Summary: | 219229 GAL PHASER HYBRID W/ 267860# 20/40 & 45000# 100 OTTAWA. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7593 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/19/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1259 | | CALC_MCF_GAS | 40 | | CASING_PRESS | 849 | | GRAVITY_OIL | 51 | | TUBING_PRESS | 616 |
| | Perforation Data: | | Interval Top: | 7608 ft. | # Of Holes: | 48 | | Interval Bottom: | 7660 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/07/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|