Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20847
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:TOWNSEND #33-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:263178LocationID:336448
County:WELD #123Location:NWSE 5 2N67W 6
Field:WATTENBERG - #90750Elevation:4880 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2180FSL  2130 FELLat/Long: 40.166086 / -104.912284Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.166232 / -104.912122Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/26/2012
End Date: 1/26/2012
Reported: 6/28/2012
Prior to rule 205A.b.(2)(A)
Days to report: 154
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 7962 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore Permit
Permit #:20020626 Expiration Date:4/2/2003
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: W/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:6/1/2002
Spud Date:5/12/2002Spud Date Is:ACTUAL
Measured TD:7962 ft.Measured PB depth:7908 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:CD / CN, GR, ARRAY INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 551 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 551 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7951 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 6758 ft., Bottom: 7962 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4254 ft.NN
SHANNON4776 ft.NN
NIOBRARA7090 ft.NN
FORT HAYS7362 ft.NN
CODELL7384 ft.NN
CARLILE7408 ft.NN
BENTONITE7426 ft.NN
GREENHORN7426 ft.NN
GRANEROS7646 ft.NN
MOWRY7793 ft.NN
J-2 SAND7809 ft.NN
SKULL CREEK7911 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  PR - 4/1/2025                  Interval Top: 7812 ft.    Interval Bottom: 7865 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/1/2002
Treatment Summary:PERF THE J SAND FROM 7812'-7832' & 7836'-7865' W/SPF. FRAC W/550,000# 20/40 SAND AND 190,000 GALS DYNAFLOW-2 FRAC FLUID. FLOWBACK WELL. RUN PROD TBG. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7791 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/24/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 55
BBLS_OIL 1
CALC_BBLS_H2O 55
CALC_BBLS_OIL 1
CALC_GOR 696000
CALC_MCF_GAS 696
CASING_PRESS 790
MCF_GAS 696
TUBING_PRESS 550
Perforation Data:
Interval Top:7812 ft.# Of Holes:98
Interval Bottom:7865 ft.Hole Size:

Formation J-CDL                   Formation Classification:  OW                   Status:  CM - 9/7/2002                  Interval Top: 7387 ft.    Interval Bottom: 7865 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.406 in.
Formation Name:J-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/1/2002
Treatment Summary:REMOVE RBP. RESET TBG. SWAB
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 54
CALC_BBLS_H2O 20
CALC_BBLS_OIL 54
CALC_GOR 13037
CALC_MCF_GAS 704
CASING_PRESS 700
MCF_GAS 704
TUBING_PRESS 330
Perforation Data:
Interval Top:7387 ft.# Of Holes:138
Interval Bottom:7865 ft.Hole Size:

Formation CODL                     Formation Classification:  OG                     Status:  CM - 5/30/2012                 Interval Top: 7384 ft.    Interval Bottom: 7404 ft.

 Completed Information for Formation CODELL
1st Production Date:8/7/2002Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/26/2012
Treatment Summary:Set CIBP @ 7450 Frac’d 7384 – 7404 w/121,080 gal gal frac fluid and 250,000 # sand (1/26/12)
Formation Treatment
Treatment Date:6/1/2002
Treatment Summary:SET RPB @ 7613'. PERF THE CODELL FROM 7387-7397' W/ 4 SPF. FRAC W/189,778# 20/40 SAND AND 111,930 GALS DYNAFLOW-2. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 40
CALC_BBLS_H2O 22
CALC_BBLS_OIL 40
CALC_GOR 2375
CALC_MCF_GAS 95
CASING_PRESS 400
MCF_GAS 95
Perforation Data:
Interval Top:7384 ft.# Of Holes:120
Interval Bottom:7404 ft.Hole Size:

Formation JDCNB                   Formation Classification:  OW                   Status:  CM - 7/3/2008                  Interval Top: 7172 ft.    Interval Bottom: 7865 ft.

 Completed Information for Formation J-D-CODELL-NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:J-D-CODELL-NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/1/2002
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7270. 6/26/08. DRILLED OUT CBP @ 7500 TO COMMINGLE THE JSND-NBRR-CDL. 6/27/08
Tubing Size:2.375 in.Tubing Setting Depth:7797 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/3/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 25
BTU_GAS 1200
CALC_BBLS_H2O 6
CALC_BBLS_OIL 25
CALC_GOR 7200
CALC_MCF_GAS 180
CASING_PRESS 679
GRAVITY_OIL 51
MCF_GAS 180
TUBING_PRESS 440
Perforation Data:
Interval Top:7172 ft.# Of Holes:214
Interval Bottom:7865 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OG                   Status:  CM - 3/13/2012                 Interval Top: 7172 ft.    Interval Bottom: 7865 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:7803 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/13/2012Test Method:Flow
Hours Tested:2Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 10
BTU_GAS 1
CALC_BBLS_H2O 180
CALC_BBLS_OIL 120
CALC_GOR 4400
CALC_MCF_GAS 528
CASING_PRESS 476
GRAVITY_OIL 57
MCF_GAS 44
TUBING_PRESS 352
Perforation Data:
Interval Top:7172 ft.# Of Holes:254
Interval Bottom:7865 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 4/1/2025                  Interval Top: 7172 ft.    Interval Bottom: 7404 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/27/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/9/2008
Treatment Summary:NBRR-CDL RE-FRAC AND RECOMPLETION. SET CBP @ 7500'. 6/3/08. RE-FRAC'D THE CDL W/104830 GAL FRAC GEL FLUID & 253380# SAND. 6/9/08. SET CFP @ 7270'. 6/9/08. FRAC'D THE NBRR W/142716 GAL FRAC FLUID & 253000# SAND. 6/9/08
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7172 ft.# Of Holes:116
Interval Bottom:7404 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 10/23/2012                Interval Top: 7172 ft.    Interval Bottom: 7190 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/7/2002Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/11/2012
Treatment Summary:CFP set @ 7230. Frac’d 7172-7190 w/ 141,059 gal frac fluid and 250,900 # sand. (2/11/12)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7172 ft.# Of Holes:36
Interval Bottom:7190 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)148
Total Gas Produced (MCF)5040
GOR34054
GOR DeterminationMCFE
Average BOE per Day2.771
Average MCFE per Day16.075

 Federal Financial Assurance  i 

 Tribal Well  i No