Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20838
Well Classification: GW Status: PR - 4/1/2025
Well Name/No:TOWNSEND #34-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:263126LocationID:331525
County:WELD #123Location:SWSE 5 2N67W 6
Field:WATTENBERG - #90750Elevation:4893 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:860FSL  2130 FELLat/Long: 40.162456 / -104.912324Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.162668 / -104.912057Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/20/2013
End Date: 6/23/2013
Reported: 8/5/2013
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2025             Measured TD: 7969 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2025
Wellbore Permit
Permit #:20020573 Expiration Date:3/27/2003
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: W/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,218A , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:6/10/2002
Spud Date:5/17/2002Spud Date Is:ACTUAL
Measured TD:7969 ft.Measured PB depth:7923 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:CD / CN, DUAL IND, C B L
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 555 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 555 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7969 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 6680 ft., Bottom: 7969 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4261 ft.NN
SHANNON4775 ft.NN
NIOBRARA7133 ft.NN
FORT HAYS7376 ft.NN
CODELL7397 ft.NN
CARLILE7420 ft.NN
GREENHORN7438 ft.NN
GRANEROS7652 ft.NN
BENTONITE7652 ft.NN
MOWRY7792 ft.NN
J-2 SAND7809 ft.NN
SKULL CREEK7909 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 4/1/2025                  Interval Top: 7811 ft.    Interval Bottom: 7877 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size:1.000 in.
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/10/2002
Treatment Summary:PERF J SAND 7811'-7826' & 7833'-7877' W/2 SPF. FRAC W/550,780# 20/40 SAND AND 189,924 GALS DYNAFLOW-2. RUN PROD TBG. SWAB TEST.
Tubing Size:2.375 in.Tubing Setting Depth:7801 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/26/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 7
CALC_BBLS_H2O 7
CALC_GOR 155172
CALC_MCF_GAS 45
CASING_PRESS 690
MCF_GAS 45
TUBING_PRESS 270
Perforation Data:
Interval Top:7811 ft.# Of Holes:118
Interval Bottom:7877 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/1/2013                  Interval Top: 7398 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/20/2013Treatment End Date:6/20/2013
Treatment Summary:Set CIBP @ 7530'. Frac the Codell w/500,680 # sand and 174,523 gals (4155 bbls) frac fluid.
Total fluid used in treatment (bbls):4155Max pressure during treatment (psi):4492
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):624
Fresh water used in treatment (bbls):4155Disposition method For flowback:DISPOSAL
Total proppant used (lbs):500680Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/10/2002
Treatment Summary:SET CIBP @ 7540'. PERF CODELL SAND FROM 7402'-7412' W/4 SPF. FRAC W/300,000# 20/40 SAND IN 133,518 GALS DYNAFLOW 2. FLOW BACK WELL. DRILL OUT CMT& CIBP. RUN PROD TBG. SWAB.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 47
CALC_BBLS_H2O 25
CALC_BBLS_OIL 47
CALC_GOR 3511
CALC_MCF_GAS 165
CASING_PRESS 850
MCF_GAS 165
TUBING_PRESS 200
Perforation Data:
Interval Top:7398 ft.# Of Holes:120
Interval Bottom:7418 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 8/1/2013                  Interval Top: 7180 ft.    Interval Bottom: 7877 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:7/10/2013Treatment End Date:N/A
Treatment Summary:Drill out plugs on 6/25/13. Set tubing at 7770' to commingle the J-Niobrara-Codell.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/10/2002
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED UP CFP @ 7280' & CBP @7500' TO COMMINGLE THE JSND-NBRR-CODL.
Tubing Size:2.375 in.Tubing Setting Depth:7770 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/10/2013Test Method:FLOW
Hours Tested:6Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 10
BTU_GAS 1294
CALC_BBLS_H2O 60
CALC_BBLS_OIL 40
CALC_GOR 12800
CALC_MCF_GAS 512
CASING_PRESS 611
GRAVITY_OIL 59
MCF_GAS 128
TUBING_PRESS 265
Perforation Data:
Interval Top:7180 ft.# Of Holes:318
Interval Bottom:7877 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 4/1/2025                  Interval Top: 7180 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/2/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2008
Treatment Summary:NB-CD REFRAC & RECOMPLETE: SET CBP@ 7500'. REFRAC'D CODL W/106,134 GAL FRAC GEL FLUID & 253,960# SAND. SET CFP@7280', FRAC'D NBRR W/142,044 GAL FRAC FLUID & 253,560# SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7180 ft.# Of Holes:120
Interval Bottom:7418 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/17/2013                Interval Top: 7180 ft.    Interval Bottom: 7200 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/23/2013Treatment End Date:6/23/2013
Treatment Summary:Set CFP @ 7260'. Frac'd the Niobrara with 275,907 # sand and 122,447 gals (2916 bbls) frac fluid.
Total fluid used in treatment (bbls):2916Max pressure during treatment (psi):5671
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):623
Fresh water used in treatment (bbls):2916Disposition method For flowback:DISPOSAL
Total proppant used (lbs):275907Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7180 ft.# Of Holes:40
Interval Bottom:7200 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)231
Total Gas Produced (MCF)8647
GOR37432
GOR DeterminationMCFE
Average BOE per Day4.691
Average MCFE per Day27.221

 Federal Financial Assurance  i 

 Tribal Well  i No