|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/23/2025 Measured TD: 8055 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/23/2025 | | Wellbore Permit | DRIFTED | | Permit #: | 20021938 | Expiration Date: | 11/11/2003 | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A/232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: 250 , Unit Acreage: 320, Drill Unit: N/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: , Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: | | Casing: | String Type: 1ST, Hole Size: 8.625 in., Size: 4.5 in., Top: , Depth: , Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4200 ft., Bottom: 5200 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/3/2002 | | Spud Date: | 2/22/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8055 ft. | Measured PB depth: | 7998 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | DUAL IND, CN/CD, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 642 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 642 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8055 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 232, Top: 6690 ft., Bottom: 8055 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5195 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 285, Top: 3714 ft., Bottom: 5218 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4324 ft. | | N | N | | SHANNON | 4850 ft. | | N | N | | NIOBRARA | 7187 ft. | | N | N | | FORT HAYS | 7430 ft. | | N | N | | CODELL | 7452 ft. | | N | N | | CARLILE | 7474 ft. | | N | N | | GREENHORN | 7491 ft. | | N | N | | GRANEROS | 7716 ft. | | N | N | | BENTONITE | 7716 ft. | | N | N | | MOWRY | 7869 ft. | | N | N | | J-2 SAND | 7885 ft. | | N | N | | SKULL CREEK | 7992 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 7/23/2025 Interval Top: 7888 ft. Interval Bottom: 7928 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/3/2002 | | Treatment Summary: | J-Sand Perforations: 7888 - 7900; 7908 - 7928 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 8 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 114488 | | CALC_MCF_GAS | 962 | | CASING_PRESS | 340 | | MCF_GAS | 962 |
| | Perforation Data: | | Interval Top: | 7888 ft. | # Of Holes: | 128 | | Interval Bottom: | 7928 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 1/6/2003 Interval Top: 7456 ft. Interval Bottom: 7928 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/3/2002 | | Treatment Summary: | SEE SCANNED DOC# 1197374 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/6/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 57 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 57 | | CALC_GOR | 8070 | | CALC_MCF_GAS | 460 | | CASING_PRESS | 680 | | MCF_GAS | 460 | | TUBING_PRESS | 430 |
| | Perforation Data: | | Interval Top: | 7456 ft. | # Of Holes: | 176 | | Interval Bottom: | 7928 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 4/3/2025 Interval Top: 7452 ft. Interval Bottom: 7472 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/23/2008 | | Treatment Summary: | Perf Codell in 2002 from 7456 - 7468 with 48 holes, reperf Codell in 2008 from 7452 - 7472 with 80 holes
| | Formation Treatment | | Treatment Date: | 4/3/2002 | | Treatment Summary: | SEE SCANNED DOC# 1098813 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 37 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 37 | | CALC_GOR | 2108 | | CALC_MCF_GAS | 78 | | MCF_GAS | 78 | | TUBING_PRESS | 1050 |
| | Perforation Data: | | Interval Top: | 7452 ft. | # Of Holes: | 128 | | Interval Bottom: | 7472 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/14/2008 Interval Top: 7240 ft. Interval Bottom: 7928 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/3/2002 | | Treatment Summary: | DRILLED OUT CFP @ 7350' & CBP @ 7610' TO COMMINGLE THE JSND-NBRR-CODL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7871 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/14/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 24 | | BTU_GAS | 1240 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 240 | | CASING_PRESS | 1502 | | GRAVITY_OIL | 49 | | MCF_GAS | 240 | | TUBING_PRESS | 586 |
| | Perforation Data: | | Interval Top: | 7240 ft. | # Of Holes: | 236 | | Interval Bottom: | 7928 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/23/2025 Interval Top: 7240 ft. Interval Bottom: 7472 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/14/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/23/2008 | | Treatment Summary: | NB-CD REFRAC&RECOMPLTN. SET CBP @7610'. REFRACD CODL W/107,320 GAL FRAC GEL FLUID & 253,320# 20/40 SAND. SET CFP@ 7350'. FRACD NBRR W/168,588 GAL FRAC FLUID & 253,040# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7240 ft. | # Of Holes: | 156 | | Interval Bottom: | 7472 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/14/2025 Interval Top: 7240 ft. Interval Bottom: 7254 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7240 ft. | # Of Holes: | 28 | | Interval Bottom: | 7254 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/23/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2027 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|