|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2022 Measured TD: 8212 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2022 | Wellbore Permit | | Permit #: | 20022159 | Expiration Date: | 11/24/2003 | Proposed Depth/Form: | 8212 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A,232 , Unit Acreage: 320, Drill Unit: E2 | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4100 ft., Bottom: 5000 ft. |
| | |
Wellbore Completed | Completion Date: | 4/13/2002 | Spud Date: | 3/5/2002 | Spud Date Is: | ACTUAL | Measured TD: | 8212 ft. | Measured PB depth: | 8202 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DUAL IND, CD/CN, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 912 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 344, Top: 0 ft., Bottom: 912 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8219 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 280, Top: 6636 ft., Bottom: 8219 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5206 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 3956 ft., Bottom: 5210 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4513 ft. | | N | N | SHANNON | 5143 ft. | | N | N | NIOBRARA | 7178 ft. | | N | N | FORT HAYS | 7421 ft. | | N | N | CODELL | 7447 ft. | | N | N | CARLILE | 7465 ft. | | N | N | GREENHORN | 7510 ft. | | N | N | GRANEROS | 7727 ft. | | N | N | BENTONITE | 7727 ft. | | N | N | MOWRY | 7881 ft. | | N | N | J-2 SAND | 7905 ft. | | N | N | SKULL CREEK | 8008 ft. | | N | N | DAKOTA | 8094 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 3/28/2002 Interval Top: 8096 ft. Interval Bottom: 8102 ft. Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/13/2002 | Treatment Summary: | DRILL OUT CEMENT. PERF DAKOTA FROM 8096-8102'. SET PKR @ 7956'. BREAKDOWN FM. SWAB & EVALUATE. POOCH W/PKR. ABANDON ZONE. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| Perforation Data: | Interval Top: | 8096 ft. | # Of Holes: | 24 | Interval Bottom: | 8102 ft. | Hole Size: | 0.38 in. |
|
Formation JSND Formation Classification: GW Status: SI - 7/1/2022 Interval Top: 7905 ft. Interval Bottom: 7958 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/18/2002 | Choke Size: | 0.250 in. | Formation Name: | J SAND | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/30/2002 | Treatment Summary: | PERF J SAND FROM 7905-7910 & 7927-7958' W/4 SPF. FRAC W/ 559,400# 20/40 SAND IN 193,872 GALS DYNAFLOW -2. RUN PROD TBG. FLOW BACK FRAC. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7904 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/30/2002 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 35 | BBLS_OIL | 10 | CALC_BBLS_H2O | 35 | CALC_BBLS_OIL | 10 | CALC_GOR | 48770 | CALC_MCF_GAS | 488 | CASING_PRESS | 560 | MCF_GAS | 488 | TUBING_PRESS | 380 |
| Perforation Data: | Interval Top: | 7905 ft. | # Of Holes: | 144 | Interval Bottom: | 7958 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 2/21/2003 Interval Top: 7448 ft. Interval Bottom: 7464 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/21/2003 | Treatment Summary: | TAG SAND @ 7528'. PERF'D THE CODELL FROM 7448-7464' W/ 4 SPF. FRAC'D THE CODELL W/ 300,000# 20/40 FRAC SAND. FLOW BACK WELL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/21/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 29 | BBLS_OIL | 38 | CALC_BBLS_H2O | 29 | CALC_BBLS_OIL | 38 | CALC_GOR | 4158 | CALC_MCF_GAS | 158 | CASING_PRESS | 100 | MCF_GAS | 158 |
| Perforation Data: | Interval Top: | 7448 ft. | # Of Holes: | 64 | Interval Bottom: | 7464 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 3/20/2003 Interval Top: 7448 ft. Interval Bottom: 7958 ft. Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | 0.281 in. | Formation Name: | J-CODELL | Commingled: | No | Production Method: | PUMPING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/20/2003 | Treatment Summary: | RIH W/TBG. LAND @ 7892' KB. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7892 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/20/2003 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 13 | BBLS_OIL | 19 | CALC_BBLS_H2O | 13 | CALC_BBLS_OIL | 19 | CALC_GOR | 15105 | CALC_MCF_GAS | 267 | CASING_PRESS | 100 | MCF_GAS | 287 |
| Perforation Data: | Interval Top: | 7448 ft. | # Of Holes: | 208 | Interval Bottom: | 7958 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/17/2009 Interval Top: 7210 ft. Interval Bottom: 7910 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | 0.219 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/17/2009 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CIBP'S TO COMMINGLE THE JSND-NBRR-CDL. 10/14/09 | Formation Treatment | Treatment Date: | 2/19/2006 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE -DRILLED OUT CBP'S TO COMMINGLE THE JSND-NBRR-CDL 02/16/06 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 787 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/17/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 16 | BBLS_OIL | 18 | BTU_GAS | 1384 | CALC_BBLS_H2O | 16 | CALC_BBLS_OIL | 18 | CALC_GOR | 9944 | CALC_MCF_GAS | 179 | CASING_PRESS | 740 | GRAVITY_OIL | 52 | MCF_GAS | 179 | TUBING_PRESS | 375 |
| Perforation Data: | Interval Top: | 7210 ft. | # Of Holes: | 252 | Interval Bottom: | 7910 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 7/1/2022 Interval Top: 7210 ft. Interval Bottom: 7464 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/17/2009 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/8/2006 | Treatment Summary: | NBRR-CDL RECOMPLETION - SET CBP@7530'. RE-FRAC'D THE CODELL WITH 114,660 GAL 24# VISTAR CROSS LINKED GEL CONTAINING 251,160# 20/40 SAND. 9/13/09. SET CBP@7300 . 9/17/09. RE-FRAC'D THE NIOBRARA WITH 250,620# 20/40 SAND 3601 BBLS VISTAR 22 X6F. 9/21/09. | Formation Treatment | Treatment Date: | 2/7/2006 | Treatment Summary: | NBRR-CDL RECOMPLETION FRAC'D THE CODELL ( 7448-7464') WITH 300,000# FRAC SAND. 02-03 SET CBP @ 7350'. 02-05-06. FRAC'D THE NIOBRARA "B" (7210-7246') WITH 177,240 GAL FRAC FLUID AND 251,100# SAND. 02-08-06 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7210 ft. | # Of Holes: | 228 | Interval Bottom: | 7464 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 06/30/2022 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|