|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2022 Measured TD: 8232 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2022 | Wellbore Permit | | Permit #: | 20030223 | Expiration Date: | 2/9/2004 | Proposed Depth/Form: | 8300 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A,232 , Unit Acreage: 320, Drill Unit: W/2 | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4100 ft., Bottom: 5100 ft. |
| | |
Wellbore Completed | Completion Date: | 12/28/2003 | Spud Date: | 4/5/2002 | Spud Date Is: | ACTUAL | Measured TD: | 8232 ft. | Measured PB depth: | 8080 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | Log Types: | CBL, CD/CN, DUAL INDUCTION | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 821 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 220, Top: 0 ft., Bottom: 821 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8232 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 6784 ft., Bottom: 8232 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5393 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 313, Top: 4170 ft., Bottom: 5394 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4507 ft. | | N | N | SUSSEX-MUDDY | 4788 ft. | | N | N | SHANNON | 5162 ft. | | N | N | NIOBRARA | 7271 ft. | | N | N | FORT HAYS | 7450 ft. | | N | N | CODELL | 7473 ft. | | N | N | CARLILE | 7492 ft. | | N | N | GREENHORN | 7537 ft. | | N | N | GRANEROS | 7760 ft. | | N | N | BENTONITE | 7760 ft. | | N | N | MOWRY | 7913 ft. | | N | N | J-2 SAND | 7927 ft. | | N | N | J SAND | 7936 ft. | | N | N | SKULL CREEK | 8028 ft. | | N | N | DAKOTA | 8132 ft. | | N | N | LYTLE | 8187 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 5/2/2002 Interval Top: 8134 ft. Interval Bottom: 8146 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 5/2/2002 | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/28/2003 | Treatment Summary: | drill out cement, PERF DKTA FROM 8134-8146 W/2 SPF. RIH W/PKR AND FRAC TBG. PKR SET #7971. EOT @7999 SWAB. UNSET PKR POOH SET CIBP @8080 MOVE UP TO THE JSAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| Perforation Data: | Interval Top: | 8134 ft. | # Of Holes: | 24 | Interval Bottom: | 8146 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: SI - 7/1/2022 Interval Top: 7928 ft. Interval Bottom: 7998 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | PUMPING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/28/2003 | Treatment Summary: | PERF THE J SAND FROM 7928'-7934, 7935-7950, 7956-7988' W/ 2 SPF. RIH W/ TBG. SWAB. FRAC THE J SAND W/ 395,804# 20/40 FRAC SAND AND 137,500 GALS DYNAFLOW-5 FRAC FLUID. FLOW BACK WELL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/13/2003 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 66 | BBLS_OIL | 8 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 23 | CALC_GOR | 1535 | CALC_MCF_GAS | 36 | CASING_PRESS | 310 | MCF_GAS | 531 |
| Perforation Data: | Interval Top: | 7928 ft. | # Of Holes: | 124 | Interval Bottom: | 7998 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: SI - 7/1/2022 Interval Top: 7473 ft. Interval Bottom: 7492 ft. Completed Information for Formation CODELL | 1st Production Date: | 3/13/2003 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/6/2009 | Treatment Summary: | CDL RECOMPLETION SET RBP @ 7550. 8/02/09. RE-FRAC'D THE CODELL WITH 118,188 GAL 20# , 22# 24#,26#, VISTAR HYRID CROSS LINKED GEL CONTAINING 251,020# 20/40 SAND. 8/06/09 | Formation Treatment | Treatment Date: | 3/13/2003 | Treatment Summary: | TAG SAND PLUG @ 7678' KB. PERF THE CODELL F/7473'-7492' W/ 4 SPF. FRAC THE CODELL W/ 300,000# 20/40 FRAC SAND. FLOW BACK WELL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 23 | BBLS_OIL | 61 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 23 | CALC_GOR | 1565 | CALC_MCF_GAS | 36 | CASING_PRESS | 80 | MCF_GAS | 107 |
| Perforation Data: | Interval Top: | 7473 ft. | # Of Holes: | 68 | Interval Bottom: | 7492 ft. | Hole Size: | 0.41 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 9/22/2009 Interval Top: 7473 ft. Interval Bottom: 7998 ft. Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/28/2003 | Treatment Summary: | JSND-CDL COMMINGLE. RELEASED RBP @ 7550' TO COMMINGLE THE JSND-CDL 9/17/09. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7906 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/22/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 28 | BTU_GAS | 1335 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 28 | CALC_GOR | 7786 | CALC_MCF_GAS | 218 | CASING_PRESS | 527 | GRAVITY_OIL | 52 | MCF_GAS | 218 | TUBING_PRESS | 390 |
| Perforation Data: | Interval Top: | 7473 ft. | # Of Holes: | 192 | Interval Bottom: | 7998 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 06/30/2022 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|