|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 8/22/2025 Measured TD: 8263 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 8/22/2025 | | Wellbore Permit | | | Permit #: | 20031864 | Expiration Date: | 9/29/2004 | | Proposed Depth/Form: | 8263 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A,232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 825 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 347, Top: 0 ft., Bottom: 822 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8263 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 6478 ft., Bottom: 8263 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4100 ft., Bottom: 5100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/10/2003 | | Spud Date: | 4/20/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8263 ft. | Measured PB depth: | 8246 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | CBL, DUAL INDUCTION, CD / CN | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 825 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 347, Top: 0 ft., Bottom: 825 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8263 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 6478 ft., Bottom: 8263 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5340 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 3780 ft., Bottom: 5350 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5340 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 3780 ft., Bottom: 5350 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4527 ft. | | N | N | | SHANNON | 5192 ft. | | N | N | | SHARON SPRINGS | 7230 ft. | | | | | NIOBRARA | 7330 ft. | | N | N | | FORT HAYS | 7497 ft. | | N | N | | CODELL | 7520 ft. | | N | N | | CARLILE | 7539 ft. | | N | N | | GREENHORN | 7576 ft. | | N | N | | GRANEROS | 7802 ft. | | N | N | | BENTONITE | 7802 ft. | | N | N | | MOWRY | 7956 ft. | | N | N | | J-2 SAND | 7974 ft. | | N | N | | SKULL CREEK | 8078 ft. | | N | N | | DAKOTA | 8174 ft. | | N | N | | LYTLE | 8234 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 6/17/2025 Interval Top: 8176 ft. Interval Bottom: 8220 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/10/2003 | | Treatment Summary: | | | Formation Treatment | | Treatment Date: | 5/7/2002 | | Treatment Summary: | Dakota perfs: 8176 - 8180; 8206 - 8220. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | Perforation Data: | | Interval Top: | 8176 ft. | # Of Holes: | 36 | | Interval Bottom: | 8220 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 8/22/2025 Interval Top: 7984 ft. Interval Bottom: 8031 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/15/2025 | Treatment End Date: | N/A | | Treatment Summary: | J Sand perfs: 7984 - 7994, 8016 - 8031. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 1/10/2003 | | Treatment Summary: | SEE SCANNED DOC# 1198260 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 19 | | BBLS_OIL | 1 | | CALC_BBLS_H2O | 19 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 18000 | | CALC_MCF_GAS | 18 | | CASING_PRESS | 660 | | GRAVITY_OIL | 60 | | MCF_GAS | 18 | | TUBING_PRESS | 650 |
| | Perforation Data: | | Interval Top: | 7984 ft. | # Of Holes: | 50 | | Interval Bottom: | 8031 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 6/17/2025 Interval Top: 7521 ft. Interval Bottom: 7538 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/15/2010 | | Treatment Summary: | Codell perf'd 7521- 7538 with 68 holes in 2003 and again in 2010. | | Formation Treatment | | Treatment Date: | 1/10/2003 | | Treatment Summary: | PERF'D THE CODELL FROM 7521 - 7538' W/ 4 SPF. FRAC'D THE CODELL W/ 118,944 GAL DYNAFLOW-2 CROSSLINKED GEL CONTAINING 282,944# 20/40 SAND. FLOW BACK WELL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 9 | | CALC_BBLS_H2O | 9 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 2778 | | CALC_MCF_GAS | 25 | | CASING_PRESS | 9 | | MCF_GAS | 25 | | TUBING_PRESS | 650 |
| | Perforation Data: | | Interval Top: | 7521 ft. | # Of Holes: | 136 | | Interval Bottom: | 7538 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/22/2025 Interval Top: 7330 ft. Interval Bottom: 7538 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/15/2010 | | Treatment Summary: | NIOBRARA - FRAC'D WITH 135,072 GAL FRAC FLUID AND 251,780 # SAND. CODELL - FRAC'D WITH 118,372 GAL FRAC FLUID AND 250,920 # SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 37 | | BBLS_OIL | 32 | | BTU_GAS | 1401 | | CALC_BBLS_H2O | 37 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 5656 | | CALC_MCF_GAS | 181 | | CASING_PRESS | 620 | | GRAVITY_OIL | 49 | | MCF_GAS | 181 |
| | Perforation Data: | | Interval Top: | 7330 ft. | # Of Holes: | 792 | | Interval Bottom: | 7538 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/17/2025 Interval Top: 7330 ft. Interval Bottom: 7458 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/15/2010 | | Treatment Summary: | Niobrara perf'd 7330 - 7370 & 7416 - 7458 in 2003 and again in 2010 with 328 shots each time. | | Formation Treatment | | Treatment Date: | 1/10/2003 | | Treatment Summary: | SET CIBP @7500'. PERFD NBR FROM 7350-7458' W/4 SPF. FRACD W/135,000 GAL FLUID & 200,580# 20/40 SAND. RIH W/PROD TBG. LAND TBG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 15 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 3733 | | CALC_MCF_GAS | 56 | | CASING_PRESS | 1140 | | MCF_GAS | 56 | | TUBING_PRESS | 900 |
| | Perforation Data: | | Interval Top: | 7330 ft. | # Of Holes: | 656 | | Interval Bottom: | 7458 ft. | Hole Size: | 0.35 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/21/2010 Interval Top: 7230 ft. Interval Bottom: 8031 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/10/2003 | | Treatment Summary: | DRILL OUT CIBP TO 7500'. CHASE TO BOTTOM @8049'. POOH. RIH W/PROD TBG. LAND PRODUCTION TBG @7958'. SWAB. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7958 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/13/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 19 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 4105 | | CALC_MCF_GAS | 78 | | CASING_PRESS | 1000 | | MCF_GAS | 78 | | TUBING_PRESS | 890 |
| | Perforation Data: | | Interval Top: | 7230 ft. | # Of Holes: | 690 | | Interval Bottom: | 8031 ft. | Hole Size: | |
|
Formation SHSP Formation Classification: GW Status: AB - 8/22/2025 Interval Top: 7230 ft. Interval Bottom: 7265 ft.| Completed Information for Formation SHARON SPRINGS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SHARON SPRINGS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SHSP. |
| | Perforation Data: | | Interval Top: | 7230 ft. | # Of Holes: | 140 | | Interval Bottom: | 7265 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/22/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|