Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20666
Well Classification: GW Status: PA - 6/27/2022
Well Name/No:RADEMACHER #14-25A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/27/2022
FacilityID:261944LocationID:336260
Municipality/County:FIRESTONE / WELD #123Location:SESW 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4885 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:470FSL  2170 FWLLat/Long: 40.191158 / -104.952869Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.191160 / -104.952870Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/27/2022             Measured TD: 7815 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/27/2022
Wellbore Permit
Permit #: Expiration Date:12/3/2013
Proposed Depth/Form:7815 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 80, Drill Unit: S/2SW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: S/2SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 630 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 465, Top: 0 ft., Bottom: 630 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7783 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 260, Top: 6700 ft., Bottom: 7783 ft.

Wellbore Completed
Completion Date:12/21/2001
Spud Date:12/21/2001Spud Date Is:ACTUAL
Measured TD:7815 ft.Measured PB depth:7750 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:PEAILC, PECNTLD, PEMLGR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 630 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 465, Top: 0 ft., Bottom: 630 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7783 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 6450 ft., Bottom: 7783 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4124 ft.NN
SHANNON4622 ft.NN
NIOBRARA6944 ft.NN
FORT HAYS7196 ft.NN
CODELL7219 ft.NN
J SAND7650 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/27/2022                 Interval Top: 7662 ft.    Interval Bottom: 7688 ft.

 Completed Information for Formation J SAND
1st Production Date:1/25/2002Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/8/2013Treatment End Date:N/A
Treatment Summary:MILLED OUT CIBP TO COMMINGLE JSND PRODUCTION WITH GRNHN PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:12/21/2001
Treatment Summary:SET CIBP @ 7610 & SET 2 SKS OF CEMENT FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP AND CEMENT TO COMMINGLE WELL WITHIN THE NEXT SIX MONTHS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 5
CALC_BBLS_OIL 5
CALC_GOR 105800
CALC_MCF_GAS 529
CASING_PRESS 550
GRAVITY_OIL 60
MCF_GAS 529
TUBING_PRESS 375
Perforation Data:
Interval Top:7662 ft.# Of Holes:78
Interval Bottom:7688 ft.Hole Size:3.13 in.

Formation GRNHN                   Formation Classification:  GW                   Status:  AB - 6/27/2022                 Interval Top: 7407 ft.    Interval Bottom: 7479 ft.

 Completed Information for Formation GREENHORN
1st Production Date:1/28/2010Choke Size:0.406 in.
Formation Name:GREENHORNCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/28/2009
Treatment Summary:319392 GAL SW WITH 150680# 40/70 & 50260# 100 OTTAWA & 8000# 20/40 SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:7367 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/9/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1314
CALC_BBLS_OIL 10
CALC_GOR 2400
CALC_MCF_GAS 24
CASING_PRESS 1004
GRAVITY_OIL 43
TUBING_PRESS 833
Perforation Data:
Interval Top:7407 ft.# Of Holes:42
Interval Bottom:7479 ft.Hole Size:0.38 in.

Formation J-GRH                   Formation Classification:  GW                   Status:  CM - 1/30/2013                 Interval Top: 7407 ft.    Interval Bottom: 7688 ft.

 Completed Information for Formation J & GREENHORN
1st Production Date:1/22/2013Choke Size: 
Formation Name:J & GREENHORNCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/30/2013Treatment End Date:N/A
Treatment Summary:MILLED OUT CIBP TO COMMINGLE JSND PRODUCTION WITH GRNHN PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7624 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/30/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 4
BTU_GAS 1181
CALC_BBLS_OIL 4
CALC_GOR 4750
CALC_MCF_GAS 19
CASING_PRESS 826
GRAVITY_OIL 49
MCF_GAS 19
TUBING_PRESS 755
Perforation Data:
Interval Top:7407 ft.# Of Holes:120
Interval Bottom:7688 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/27/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No