Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20640
Well Classification: GW Status: PA - 1/7/2025
Well Name/No:SPRAGUE #31-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/7/2025
FacilityID:261754LocationID:336403
County:WELD #123Location:NWNE 9 2N67W 6
Field:WATTENBERG - #90750Elevation:4937 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1038FNL  1605 FELLat/Long: 40.157045 / -104.891731Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.157120 / -104.891595Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 1/7/2025             Measured TD: 8234 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 1/7/2025
Wellbore PermitDIRECTIONAL
Permit #:20080353 Expiration Date:4/10/2009
Proposed Top PZ Location:Sec: Twp: Footage: 603 FNL  2014 FEL
Bottom Hole Location:Sec:9 Twp: 2N 67W Footage: 465 FNL  2142 FEL
Proposed Depth/Form:8234 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2,NE
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318.A/232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: W2,NE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 510 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 206, Top: 0 ft., Bottom: 510 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8234 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 225, Top: 6938 ft., Bottom: 8234 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4200 ft., Bottom: 5200 ft.

Wellbore Completed
Completion Date:4/3/2002
Spud Date:1/31/2002Spud Date Is:ACTUAL
Measured TD:8234 ft.Measured PB depth:8220 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 603 FNL  2014 FEL
Bottom Hole Location:Sec:9 Twp: 2N 67WFootage: 465 FNL  2142 FEL
Log Types:RST, CBL ( NO OPEN HOLE )
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 510 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 206, Top: 0 ft., Bottom: 513 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8234 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 6938 ft., Bottom: 8234 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5109 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 3652 ft., Bottom: 5109 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4365 ft.NN
SHANNON4925 ft.NN
NIOBRARA7345 ft.NN
FORT HAYS7593 ft.NN
CODELL7616 ft.NN
CARLILE7632 ft.NN
GREENHORN7656 ft.NN
GRANEROS7883 ft.NN
BENTONITE7883 ft.NN
MOWRY8037 ft.NN
J-2 SAND8054 ft.NN
SKULL CREEK8153 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/7/2025                  Interval Top: 8054 ft.    Interval Bottom: 8104 ft.

 Completed Information for Formation J SAND
1st Production Date:4/5/2002Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2002
Treatment Summary:DRILL OUT CMT. PERF J SAND FROM 8054-8070'&8076-8104' W/4 SPF. SET PKR@8001'. SWAB & RECORD. REMOVE PKR. FRAC W/332,500# 20/40 SAND IN 123,186 GALS DYNAFLOW-2. FLOW BACK. RUN PROD. TBG. SWAB
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 5
CALC_BBLS_H2O 18
CALC_BBLS_OIL 5
CALC_GOR 78491
CALC_MCF_GAS 416
CASING_PRESS 420
MCF_GAS 416
TUBING_PRESS 200
Perforation Data:
Interval Top:8054 ft.# Of Holes:176
Interval Bottom:8104 ft.Hole Size:0.375 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/23/2024                Interval Top: 7616 ft.    Interval Bottom: 7637 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7616 ft.# Of Holes:40
Interval Bottom:7637 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/14/2009                 Interval Top: 7392 ft.    Interval Bottom: 8104 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2002
Treatment Summary:JSND/NB/CD COMMINGLE; RELEASED RBP@7510 2/5/09 RELEASED RBP@ 7710 TO COMMINGLE THE JSND/NB/CD 2/9/09
Tubing Size:2.375 in.Tubing Setting Depth:8046 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/14/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 45
BTU_GAS 1166
CALC_BBLS_H2O 15
CALC_BBLS_OIL 45
CALC_GOR 2889
CALC_MCF_GAS 130
CASING_PRESS 946
GRAVITY_OIL 50
MCF_GAS 130
TUBING_PRESS 288
Perforation Data:
Interval Top:7392 ft.# Of Holes:296
Interval Bottom:8104 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/7/2025                  Interval Top: 7392 ft.    Interval Bottom: 7637 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/14/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/14/2009
Treatment Summary:NB/CD RECOMP; SET CBP@6785, DRILLED OUT CBP @ 6765 SET RBP@ 7710, 1/7/09; FRAC'D CD W/109998 GAL 24# VISTAR HYBRID X- LINKED GEL CONTANING 250640# SAND 1/14/09; SET RBP@7510; 1/14/09. FRAC'D NB W/154,056 GAL 18# VISTAR HYBRID X- LINK GEL W/250,560# SND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7392 ft.# Of Holes:120
Interval Bottom:7637 ft.Hole Size:0.4166667 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/23/2024                Interval Top: 7392 ft.    Interval Bottom: 7412 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7392 ft.# Of Holes:80
Interval Bottom:7412 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/07/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No