|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/14/2018 Measured TD: 8165 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/14/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20022156 | Expiration Date: | 11/24/2003 | | Proposed Top PZ Location: | Sec:9 Twp: | Footage: 660 FNL 660 FEL | | Bottom Hole Location: | Sec:9 Twp: | Footage: 660 FNL 660 FEL | | Proposed Depth/Form: | 8165 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,318.A , Unit Acreage: 320, Drill Unit: N2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4900 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 3900 ft., Bottom: 4900 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/26/2002 | | Spud Date: | 1/23/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8165 ft. | Measured PB depth: | 8118 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec:9 Twp: | Footage: 660 FNL 660 FEL | | Bottom Hole Location: | Sec:9 Twp: | Footage: 660 FNL 660 FEL | | Log Types: | DUAL IND, CD/ CN, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 783 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 0 ft., Bottom: 783 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8165 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 268, Top: 6444 ft., Bottom: 8165 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4911 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 278, Top: 3494 ft., Bottom: 4912 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4401 ft. | | N | N | | SHANNON | 4940 ft. | | N | N | | NIOBRARA | 7261 ft. | | N | N | | FORT HAYS | 7519 ft. | | N | N | | CODELL | 7547 ft. | | N | N | | CARLILE | 7566 ft. | | N | N | | GREENHORN | 7608 ft. | | N | N | | GRANEROS | 7828 ft. | | N | N | | BENTONITE | 7828 ft. | | N | N | | MOWRY | 7980 ft. | | N | N | | J SAND | 8004 ft. | | N | N | | SKULL CREEK | 8106 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/14/2018 Interval Top: 8018 ft. Interval Bottom: 8048 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/5/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/26/2002 | | Treatment Summary: | DRILL OUT STAGE TOOL CMT. PERF'D J SAND FROM 8018-8048 W/ 4 SPF. FRAC'D W/ 530,640# 20/40 SAND IN 179,357 GTAS DYNA-FLOW2. FLOW BACK. RUN TBG. SWAB BACK. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 5 | | CALC_GOR | 62755 | | CASING_PRESS | 580 | | MCF_GAS | 308 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 8018 ft. | # Of Holes: | 120 | | Interval Bottom: | 8048 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 2/20/2003 Interval Top: 7548 ft. Interval Bottom: 7565 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/26/2002 | | Treatment Summary: | TAGGED SAND AT 7700'. PERF'D THE CODELL FROM 7548'-7565' W/2 SPF. FRAC'D THE CODELL WITH 300,000# 20/40 FRAC SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/20/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 34 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 4324 | | CALC_MCF_GAS | 147 | | CASING_PRESS | 185 | | MCF_GAS | 147 |
| | Perforation Data: | | Interval Top: | 7548 ft. | # Of Holes: | 64 | | Interval Bottom: | 7565 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 3/18/2003 Interval Top: 7548 ft. Interval Bottom: 8048 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/26/2002 | | Treatment Summary: | RIH W/TBG. TAG SAND BRIDGE @ 7705'. LAND TBG @ 8012' KB. SWAB. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8012 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/18/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 22 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 20455 | | CALC_MCF_GAS | 450 | | MCF_GAS | 450 |
| | Perforation Data: | | Interval Top: | 7548 ft. | # Of Holes: | 184 | | Interval Bottom: | 8048 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/30/2008 Interval Top: 7300 ft. Interval Bottom: 8048 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/26/2002 | | Treatment Summary: | DRILLED OUT CFP @ 7400'. DRILLED OUT CBP @ 7650' TO COMMINGLE THE JSND-NBRR-CODL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7985 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/30/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 20 | | BTU_GAS | 1275 | | CALC_BBLS_H2O | 33 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 8950 | | CALC_MCF_GAS | 179 | | CASING_PRESS | 788 | | GRAVITY_OIL | 50 | | MCF_GAS | 179 | | TUBING_PRESS | 220 |
| | Perforation Data: | | Interval Top: | 7300 ft. | # Of Holes: | 232 | | Interval Bottom: | 8048 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/14/2018 Interval Top: 7300 ft. Interval Bottom: 7566 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/30/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/19/2008 | | Treatment Summary: | NB-CD REFRAC&RECOMPLTN. SET CBP@ 7650'. RE-FRACD CODL W/110,544 GAL FRAC GEL FLUID& 253,840# SAND. SET CFP @7400'. FRACD NBRR W/163,410 GAL FRAC FLUID & 253,960# SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7300 ft. | # Of Holes: | 112 | | Interval Bottom: | 7566 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/14/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|