Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20623
Well Classification: GW Status: PA - 8/14/2018
Well Name/No:DAVIS #41-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/14/2018
FacilityID:261633LocationID:331402
County:WELD #123Location:NWNW 10 2N66W 6
Field:WATTENBERG - #90750Elevation:4938 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:621FNL  156 FWLLat/Long: 40.158019 / -104.772092Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.158207 / -104.772197Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/14/2018             Measured TD: 8165 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/14/2018
Wellbore PermitDIRECTIONAL
Permit #:20022156 Expiration Date:11/24/2003
Proposed Top PZ Location:Sec:9 Twp: Footage: 660 FNL  660 FEL
Bottom Hole Location:Sec:9 Twp: Footage: 660 FNL  660 FEL
Proposed Depth/Form:8165 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318.A , Unit Acreage: 320, Drill Unit: N2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4900 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 3900 ft., Bottom: 4900 ft.

Wellbore Completed
Completion Date:2/26/2002
Spud Date:1/23/2002Spud Date Is:ACTUAL
Measured TD:8165 ft.Measured PB depth:8118 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:9 Twp: Footage: 660 FNL  660 FEL
Bottom Hole Location:Sec:9 Twp: Footage: 660 FNL  660 FEL
Log Types:DUAL IND, CD/ CN, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 783 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 783 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8165 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 268, Top: 6444 ft., Bottom: 8165 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4911 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 278, Top: 3494 ft., Bottom: 4912 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4401 ft.NN
SHANNON4940 ft.NN
NIOBRARA7261 ft.NN
FORT HAYS7519 ft.NN
CODELL7547 ft.NN
CARLILE7566 ft.NN
GREENHORN7608 ft.NN
GRANEROS7828 ft.NN
BENTONITE7828 ft.NN
MOWRY7980 ft.NN
J SAND8004 ft.NN
SKULL CREEK8106 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 8/14/2018                 Interval Top: 8018 ft.    Interval Bottom: 8048 ft.

 Completed Information for Formation J SAND
1st Production Date:3/5/2002Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/26/2002
Treatment Summary:DRILL OUT STAGE TOOL CMT. PERF'D J SAND FROM 8018-8048 W/ 4 SPF. FRAC'D W/ 530,640# 20/40 SAND IN 179,357 GTAS DYNA-FLOW2. FLOW BACK. RUN TBG. SWAB BACK.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 5
CALC_GOR 62755
CASING_PRESS 580
MCF_GAS 308
TUBING_PRESS 350
Perforation Data:
Interval Top:8018 ft.# Of Holes:120
Interval Bottom:8048 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/20/2003                 Interval Top: 7548 ft.    Interval Bottom: 7565 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/26/2002
Treatment Summary:TAGGED SAND AT 7700'. PERF'D THE CODELL FROM 7548'-7565' W/2 SPF. FRAC'D THE CODELL WITH 300,000# 20/40 FRAC SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/20/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 34
CALC_BBLS_H2O 28
CALC_BBLS_OIL 34
CALC_GOR 4324
CALC_MCF_GAS 147
CASING_PRESS 185
MCF_GAS 147
Perforation Data:
Interval Top:7548 ft.# Of Holes:64
Interval Bottom:7565 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 3/18/2003                 Interval Top: 7548 ft.    Interval Bottom: 8048 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:J-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/26/2002
Treatment Summary:RIH W/TBG. TAG SAND BRIDGE @ 7705'. LAND TBG @ 8012' KB. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:8012 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/18/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 22
CALC_BBLS_H2O 2
CALC_BBLS_OIL 22
CALC_GOR 20455
CALC_MCF_GAS 450
MCF_GAS 450
Perforation Data:
Interval Top:7548 ft.# Of Holes:184
Interval Bottom:8048 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/30/2008                 Interval Top: 7300 ft.    Interval Bottom: 8048 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/26/2002
Treatment Summary:DRILLED OUT CFP @ 7400'. DRILLED OUT CBP @ 7650' TO COMMINGLE THE JSND-NBRR-CODL.
Tubing Size:2.375 in.Tubing Setting Depth:7985 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 33
BBLS_OIL 20
BTU_GAS 1275
CALC_BBLS_H2O 33
CALC_BBLS_OIL 20
CALC_GOR 8950
CALC_MCF_GAS 179
CASING_PRESS 788
GRAVITY_OIL 50
MCF_GAS 179
TUBING_PRESS 220
Perforation Data:
Interval Top:7300 ft.# Of Holes:232
Interval Bottom:8048 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/14/2018                 Interval Top: 7300 ft.    Interval Bottom: 7566 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/30/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/19/2008
Treatment Summary:NB-CD REFRAC&RECOMPLTN. SET CBP@ 7650'. RE-FRACD CODL W/110,544 GAL FRAC GEL FLUID& 253,840# SAND. SET CFP @7400'. FRACD NBRR W/163,410 GAL FRAC FLUID & 253,960# SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7300 ft.# Of Holes:112
Interval Bottom:7566 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/14/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No