Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20498
Well Classification: GW Status: PA - 9/20/2018
Well Name/No:DAVIS #31-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/20/2018
FacilityID:260504LocationID:331324
County:WELD #123Location:NWNE 9 2N66W 6
Field:WATTENBERG - #90750Elevation:4925 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:654FNL  2085 FELLat/Long: 40.157937 / -104.780160Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.158038 / -104.780146Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 9/20/2018             Measured TD: 7963 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 9/20/2018
Wellbore Permit
Permit #:20022155 Expiration Date:11/24/2003
Proposed Depth/Form:7963 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232, 318A , Unit Acreage: 320, Drill Unit: N2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4800 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 170, Top: 4300 ft., Bottom: 4800 ft.

Wellbore Completed
Completion Date:1/31/2002
Spud Date:12/5/2001Spud Date Is:ACTUAL
Measured TD:7963 ft.Measured PB depth:7914 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR - CD - CN - CBL
Log Types:GR - CD - CN - CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 771 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 771 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7980 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 404, Top: 6614 ft., Bottom: 7980 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6614 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 415, Top: 4548 ft., Bottom: 6614 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4400 ft.NN
SHANNON5030 ft.NN
NIOBRARA7124 ft.NN
FORT HAYS7376 ft.NN
CODELL7399 ft.NN
CARLILE7416 ft.NN
GREENHORN7456 ft.NN
GRANEROS7650 ft.NN
BENTONITE7650 ft.NN
MOWRY7824 ft.NN
J-2 SAND7838 ft.NN
SKULL CREEK7947 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 9/20/2018                 Interval Top: 7860 ft.    Interval Bottom: 7898 ft.

 Completed Information for Formation J SAND
1st Production Date:1/31/2002Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/31/2002
Treatment Summary:PERF J SAND FROM 7860-7898 W/ 4 SPF. FRAC W/ 547,100# 20/40 FRAC SAND IN 226,606 GALS FRAC GEL 22#. FLOW BACK WELL. RUN PROD TBG. SWAB WELL IN.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 27
BBLS_OIL 4
CALC_GOR 81977
CASING_PRESS 1250
MCF_GAS 361
TUBING_PRESS 1100
Perforation Data:
Interval Top:7860 ft.# Of Holes:152
Interval Bottom:7898 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/18/2003                 Interval Top: 7400 ft.    Interval Bottom: 7416 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/31/2002
Treatment Summary:PERF THE CODELL FROM 7400'-7416' W/ 4 SPF. FRAC'D THE CODELL W/ 300,000# 20/40 FRAC SAND. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/18/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 9
CALC_BBLS_H2O 23
CALC_BBLS_OIL 9
CALC_GOR 5556
CALC_MCF_GAS 50
CASING_PRESS 110
MCF_GAS 50
Perforation Data:
Interval Top:7400 ft.# Of Holes:64
Interval Bottom:7416 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 3/11/2003                 Interval Top: 7400 ft.    Interval Bottom: 7898 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/31/2002
Treatment Summary:RIH W/ TBG. TAG SAND @ 7441'. CIRC SAND OUT TO 7830'. POOH. RIH W/ PROD TBG. TAGGED HIGH @ 7805'. CIR CLEAN TO PBTD LAND AND SWAB IN.
Tubing Size:2.375 in.Tubing Setting Depth:7853 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/11/2003Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 27
CALC_BBLS_H2O 17
CALC_BBLS_OIL 27
CALC_GOR 8926
CALC_MCF_GAS 241
CASING_PRESS 720
MCF_GAS 241
TUBING_PRESS 420
Perforation Data:
Interval Top:7400 ft.# Of Holes:216
Interval Bottom:7898 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/23/2008                 Interval Top: 7177 ft.    Interval Bottom: 7898 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/31/2002
Treatment Summary:JNBCD COMMINGLE; DRILLED OUT CFP @7310' 3/18/08 DRILL OUT CBP @7550' TO COMMINGLE JNBCD 3/19/2008
Tubing Size:2.375 in.Tubing Setting Depth:7835 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/23/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 11
BTU_GAS 1295
CALC_BBLS_H2O 17
CALC_BBLS_OIL 11
CALC_GOR 10091
CALC_MCF_GAS 111
GRAVITY_OIL 46
MCF_GAS 111
Perforation Data:
Interval Top:7177 ft.# Of Holes:264
Interval Bottom:7898 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/20/2018                 Interval Top: 7177 ft.    Interval Bottom: 7420 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/19/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/17/2008
Treatment Summary:NBRR-CDL RECOMPLETION; SET CBP @7550'. 3/14/08. RE-FRAC CODL W/106,470 GAL FRAC FLUID & 253,040# SAND. 3/17/08. SET CFP @7310'.FRAC NBRR W/162,876 GAL FRAC FLD & 253,640# SAND 3/17/08.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7177 ft.# Of Holes:80
Interval Bottom:7420 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/20/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No