|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/3/2019 Measured TD: 8199 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/3/2019 | Wellbore Permit | | Permit #: | 20031133 | Expiration Date: | 6/29/2004 | Proposed Depth/Form: | 8199 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 775 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 545, Top: 0 ft., Bottom: 775 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8184 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 6990 ft., Bottom: 8184 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5266 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 260, Top: 4220 ft., Bottom: 5266 ft. |
| | |
Wellbore Completed | Completion Date: | 9/11/2001 | Spud Date: | 6/26/2001 | Spud Date Is: | ACTUAL | Measured TD: | 8199 ft. | Measured PB depth: | 8184 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | PECNTDD, PEAIGR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 775 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 545, Top: 0 ft., Bottom: 775 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8184 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 6990 ft., Bottom: 8184 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5269 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 4220 ft., Bottom: 5266 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4442 ft. | | N | N | SHANNON | 5020 ft. | | N | N | NIOBRARA | 7344 ft. | | N | N | FORT HAYS | 7619 ft. | | N | N | CODELL | 7640 ft. | | N | N | J SAND | 8066 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 10/3/2019 Interval Top: 8080 ft. Interval Bottom: 8094 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/11/2001 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/16/2012 | Treatment End Date: | N/A | Treatment Summary: | JS PERF 8080-8094 HOLES 42 SIZE .36
4/12/2012 - Cleared out sand plug over JS to commingle well | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 8/26/2010 | Treatment Summary: | Set sand plug @ 7880'. | Formation Treatment | Treatment Date: | 9/11/2001 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 2 | CALC_BBLS_OIL | 2 | CALC_GOR | 53000 | CALC_MCF_GAS | 106 | CASING_PRESS | 600 | GRAVITY_OIL | 60 | MCF_GAS | 106 | TUBING_PRESS | 260 |
| Perforation Data: | Interval Top: | 8080 ft. | # Of Holes: | 42 | Interval Bottom: | 8094 ft. | Hole Size: | 0.36 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/24/2012 Interval Top: 7344 ft. Interval Bottom: 8094 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 4/23/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/24/2012 | Treatment Summary: | 4/12/2012 - Cleared out sand plug over JS to commingle well | Formation Treatment | Treatment Date: | 9/11/2001 | Treatment Summary: | FRAC INFO REPRESENTS; |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8061 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/24/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 4 | BTU_GAS | 1220 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 4 | CALC_GOR | 13250 | CALC_MCF_GAS | 53 | CASING_PRESS | 616 | GRAVITY_OIL | 50 | MCF_GAS | 53 | TUBING_PRESS | 585 |
| Perforation Data: | Interval Top: | 7344 ft. | # Of Holes: | 198 | Interval Bottom: | 8094 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OG Status: AB - 10/3/2019 Interval Top: 7344 ft. Interval Bottom: 7656 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/4/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/16/2012 | Treatment End Date: | N/A | Treatment Summary: | NB-CD PERF 7344-7656 HOLES 156 SIZE .42
4/12/2012 - Cleared out sand plug over JS to commingle well | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 9/14/2010 | Treatment Summary: | NBRR Perf 7344-7548 Holes 78 Size 0.42 CODL Perf 7642-7660 Holes 78 Size 0.38
Reperf NBRR 7344-7548 Holes 56 Size 0.42.
Refrac NBRR w/ 250 gal 15% HCl & 232,388 gal SW & 200,020# 40/70 sand & 4,000# SB Excel.
Reperf CODL 7642-7660 Holes 54 Size 0.38.
Refrac CODL w/ 206,262 gal SW & 151,560# 40/70 sand & 4,000# SB Excel. | Formation Treatment | Treatment Date: | 9/11/2001 | Treatment Summary: | FRAC'D NB-CD W/115620# 20/40 MESH; 111040 GAL. SAND LADEN FLUID NBRR PERFS; 7394' - 7433' CODL PERFS; 7644' - 7656' |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 18 | BTU_GAS | 1331 | CALC_BBLS_OIL | 18 | CALC_GOR | 4611 | CALC_MCF_GAS | 83 | CASING_PRESS | 1363 | GRAVITY_OIL | 49 | MCF_GAS | 83 | TUBING_PRESS | 1091 |
| Perforation Data: | Interval Top: | 7344 ft. | # Of Holes: | 156 | Interval Bottom: | 7656 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 10/03/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|