Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20400
Well Classification: GW Status: PA - 8/24/2018
Well Name/No:DAVIS #42-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/24/2018
FacilityID:259918LocationID:331264
County:WELD #123Location:SENE 9 2N66W 6
Field:WATTENBERG - #90750Elevation:4935 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2164FNL  500 FELLat/Long: 40.153787 / -104.774480Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.154001 / -104.774570Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/24/2018             Measured TD: 8004 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/24/2018
Wellbore Permit
Permit #:20022157 Expiration Date:11/24/2003
Proposed Depth/Form:8009 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318-A, 232, Unit Acreage: 320, Drill Unit: N2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4800 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 4300 ft., Bottom: 4800 ft.

Wellbore Completed
Completion Date:8/8/2001
Spud Date:7/16/2001Spud Date Is:ACTUAL
Measured TD:8004 ft.Measured PB depth:7974 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND, COMP NEUT, COMP DENS, CBL.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 757 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 757 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7990 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6900 ft., Bottom: 7990 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4948 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 3740 ft., Bottom: 4948 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4376 ft.NN
SHANNON5060 ft.NN
NIOBRARA7229 ft.NN
FORT HAYS7422 ft.NN
CODELL7446 ft.NN
CARLILE7470 ft.NN
GREENHORN7532 ft.NN
GRANEROS7711 ft.NN
BENTONITE7711 ft.NN
MOWRY7840 ft.NN
J-2 SAND7850 ft.NN
SKULL CREEK7963 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 8/24/2018                 Interval Top: 7876 ft.    Interval Bottom: 7914 ft.

 Completed Information for Formation J SAND
1st Production Date:8/9/2001Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/8/2001
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 29
BBLS_OIL 3
CALC_GOR 151676
CASING_PRESS 450
MCF_GAS 516
TUBING_PRESS 250
Perforation Data:
Interval Top:7876 ft.# Of Holes:76
Interval Bottom:7914 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  AB - 8/24/2018                 Interval Top: 7447 ft.    Interval Bottom: 7463 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/30/2009
Treatment Summary:CODL RECOMPLETION. SET CBP @ 7550'. RE-FRAC'D CODL W/ 111,426 GAL 24# - 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,300# 20/40 SAND. 7/30/09
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 19
BBLS_OIL 16
CALC_BBLS_H2O 19
CALC_BBLS_OIL 16
CALC_GOR 3188
CALC_MCF_GAS 51
CASING_PRESS 110
MCF_GAS 51
Perforation Data:
Interval Top:7447 ft.# Of Holes:64
Interval Bottom:7463 ft.Hole Size:0.41 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 8/5/2009                  Interval Top: 7447 ft.    Interval Bottom: 7914 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/8/2001
Treatment Summary:JSND-CODL COMMINGLE. DRILLED OUT CBP @ 7550' TO COMMINGLE THE JSND & CODL. 8/4/09.
Tubing Size:2.375 in.Tubing Setting Depth:7423 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/5/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 54
BBLS_OIL 33
BTU_GAS 1333
CALC_BBLS_H2O 54
CALC_BBLS_OIL 33
CALC_GOR 6636
CALC_MCF_GAS 219
CASING_PRESS 151
GRAVITY_OIL 49
MCF_GAS 219
TUBING_PRESS 300
Perforation Data:
Interval Top:7447 ft.# Of Holes:140
Interval Bottom:7914 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/24/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No