|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 8/8/2024 Measured TD: 7934 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 8/8/2024 | | Wellbore Permit | | | Permit #: | 20021318 | Expiration Date: | 7/8/2003 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318-A, 232, Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 7/26/2001 | | Spud Date: | 7/2/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 7934 ft. | Measured PB depth: | 7910 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | DUAL INDUCTION, COMPENSATED DENSITYM COMPENSATED NEUTRON, GAMMA RAY | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 746 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 555, Top: 0 ft., Bottom: 746 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7925 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6540 ft., Bottom: 7925 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4216 ft. | | N | N | | SHANNON | 4791 ft. | | N | N | | NIOBRARA | 7065 ft. | | N | N | | FORT HAYS | 7300 ft. | | N | N | | CODELL | 7323 ft. | | N | N | | CARLILE | 7345 ft. | | N | N | | GREENHORN | 7375 ft. | | N | N | | GRANEROS | 7597 ft. | | N | N | | BENTONITE | 7597 ft. | | N | N | | MOWRY | 7748 ft. | | N | N | | J-2 SAND | 7761 ft. | | N | N | | SKULL CREEK | 7893 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/8/2024 Interval Top: 7764 ft. Interval Bottom: 7834 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/26/2001 | | Treatment Summary: | FRAC W/ 550,350 LBS 20/40 FRAC SAND IN 223,977 GALS. FRACGEL 25# HT & 22# |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 29 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 29 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 133902 | | CALC_MCF_GAS | 549 | | CASING_PRESS | 460 | | MCF_GAS | 549 | | TUBING_PRESS | 320 |
| | Perforation Data: | | Interval Top: | 7764 ft. | # Of Holes: | 116 | | Interval Bottom: | 7834 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/9/2024 Interval Top: 7331 ft. Interval Bottom: 7341 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/26/2001 | | Treatment Summary: | SET RBP @ 7470'. PERF THE CODELL FROM 7331' - 7341' W/4 SPF. FRAC W/300,000# 20/40 SAND IN 129,000 GALS DYNAFLOW-2. FLOW BACK WELL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BBLS_OIL | 30 | | CALC_BBLS_H2O | 23 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 2700 | | CALC_MCF_GAS | 81 | | CASING_PRESS | 200 | | MCF_GAS | 81 |
| | Perforation Data: | | Interval Top: | 7331 ft. | # Of Holes: | 40 | | Interval Bottom: | 7341 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/15/2009 Interval Top: 7104 ft. Interval Bottom: 7846 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/26/2001 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7200'. 01/29/2009. DRILLED OUT CBP @ 7440' TO COMMINGLE THE JSND-NBRR-CDL. 03/09/2009 |
| | Tubing Size: | 2.034483 in. | Tubing Setting Depth: | 7747 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/15/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 30 | | BTU_GAS | 1282 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 8000 | | CALC_MCF_GAS | 240 | | CASING_PRESS | 499 | | GRAVITY_OIL | 52 | | MCF_GAS | 240 | | TUBING_PRESS | 309 |
| | Perforation Data: | | Interval Top: | 7104 ft. | # Of Holes: | 196 | | Interval Bottom: | 7846 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/8/2024 Interval Top: 7104 ft. Interval Bottom: 7341 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/27/2009 | | Treatment Summary: | NBRR-CDL REFRAC AND RECOMPLETION. SET CBP &7440'. 01-22-09. RE-FRAC'D THE CODELL WITH 110,754 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,720# 20/40 SAND. 01-27-09. CONT. NEXT PAGE. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7104 ft. | # Of Holes: | 80 | | Interval Bottom: | 7341 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/10/2024 Interval Top: 7104 ft. Interval Bottom: 7124 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7104 ft. | # Of Holes: | 40 | | Interval Bottom: | 7124 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/08/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|