Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20398
Well Classification: GW Status: PA - 8/8/2024
Well Name/No:KIYOTA #44-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/8/2024
FacilityID:259919LocationID:331262
County:WELD #123Location:SESE 35 3N67W 6
Field:WATTENBERG - #90750Elevation:4823 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:855FSL  620 FELLat/Long: 40.176637 / -104.850712Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.175984 / -104.851394Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 8/8/2024             Measured TD: 7934 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 8/8/2024
Wellbore Permit
Permit #:20021318 Expiration Date:7/8/2003
Proposed Depth/Form:
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318-A, 232, Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:7/26/2001
Spud Date:7/2/2001Spud Date Is:ACTUAL
Measured TD:7934 ft.Measured PB depth:7910 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:DUAL INDUCTION, COMPENSATED DENSITYM COMPENSATED NEUTRON, GAMMA RAY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 746 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 0 ft., Bottom: 746 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7925 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6540 ft., Bottom: 7925 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4216 ft.NN
SHANNON4791 ft.NN
NIOBRARA7065 ft.NN
FORT HAYS7300 ft.NN
CODELL7323 ft.NN
CARLILE7345 ft.NN
GREENHORN7375 ft.NN
GRANEROS7597 ft.NN
BENTONITE7597 ft.NN
MOWRY7748 ft.NN
J-2 SAND7761 ft.NN
SKULL CREEK7893 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 8/8/2024                  Interval Top: 7764 ft.    Interval Bottom: 7834 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/26/2001
Treatment Summary:FRAC W/ 550,350 LBS 20/40 FRAC SAND IN 223,977 GALS. FRACGEL 25# HT & 22#
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 29
BBLS_OIL 4
CALC_BBLS_H2O 29
CALC_BBLS_OIL 4
CALC_GOR 133902
CALC_MCF_GAS 549
CASING_PRESS 460
MCF_GAS 549
TUBING_PRESS 320
Perforation Data:
Interval Top:7764 ft.# Of Holes:116
Interval Bottom:7834 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/9/2024                  Interval Top: 7331 ft.    Interval Bottom: 7341 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/26/2001
Treatment Summary:SET RBP @ 7470'. PERF THE CODELL FROM 7331' - 7341' W/4 SPF. FRAC W/300,000# 20/40 SAND IN 129,000 GALS DYNAFLOW-2. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 30
CALC_BBLS_H2O 23
CALC_BBLS_OIL 30
CALC_GOR 2700
CALC_MCF_GAS 81
CASING_PRESS 200
MCF_GAS 81
Perforation Data:
Interval Top:7331 ft.# Of Holes:40
Interval Bottom:7341 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/15/2009                 Interval Top: 7104 ft.    Interval Bottom: 7846 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/26/2001
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7200'. 01/29/2009. DRILLED OUT CBP @ 7440' TO COMMINGLE THE JSND-NBRR-CDL. 03/09/2009
Tubing Size:2.034483 in.Tubing Setting Depth:7747 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/15/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 30
BTU_GAS 1282
CALC_BBLS_H2O 8
CALC_BBLS_OIL 30
CALC_GOR 8000
CALC_MCF_GAS 240
CASING_PRESS 499
GRAVITY_OIL 52
MCF_GAS 240
TUBING_PRESS 309
Perforation Data:
Interval Top:7104 ft.# Of Holes:196
Interval Bottom:7846 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/8/2024                  Interval Top: 7104 ft.    Interval Bottom: 7341 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/27/2009
Treatment Summary:NBRR-CDL REFRAC AND RECOMPLETION. SET CBP &7440'. 01-22-09. RE-FRAC'D THE CODELL WITH 110,754 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,720# 20/40 SAND. 01-27-09. CONT. NEXT PAGE.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7104 ft.# Of Holes:80
Interval Bottom:7341 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/10/2024                 Interval Top: 7104 ft.    Interval Bottom: 7124 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7104 ft.# Of Holes:40
Interval Bottom:7124 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/08/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No