Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20181
Well Classification: GW Status: PA - 1/21/2014
Well Name/No:HSR STREAR #3-10A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/21/2014
FacilityID:258609LocationID:331114
County:WELD #123Location:NENW 10 2N67W 6
Field:WATTENBERG - #90750Elevation:4930 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:461FNL  2168 FWLLat/Long: 40.158527 / -104.878253Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.158600 / -104.878090Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/21/2014             Measured TD: 8094 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/21/2014
Wellbore Permit
Permit #:20053966 Expiration Date:11/29/2006
Proposed Depth/Form:8094 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 752 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 570, Top: 0 ft., Bottom: 752 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8058 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 260, Top: 6510 ft., Bottom: 8058 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5392 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 375, Top: 4160 ft., Bottom: 5404 ft.

Wellbore Completed
Completion Date:6/25/2002
Spud Date:6/12/2002Spud Date Is:ACTUAL
Measured TD:8094 ft.Measured PB depth:8044 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDCNGR, DIGLGR, C B L
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 752 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 752 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8058 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 6512 ft., Bottom: 8058 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5392 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 4160 ft., Bottom: 5404 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4463 ft.4571 ft.NN
SHANNON4926 ft.NN
NIOBRARA7228 ft.NN
FORT HAYS7470 ft.NN
CODELL7491 ft.NN
J SAND7932 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/21/2014                 Interval Top: 7936 ft.    Interval Bottom: 7986 ft.

 Completed Information for Formation J SAND
1st Production Date:7/2/2002Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/26/2010
Treatment Summary:SET CIBP@ 7560' W/2 SACKS OF SAND FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT THE CIBP TO COMMINGLE WELL WITHIN THE NEXT SIX MONTHS.
Formation Treatment
Treatment Date:6/25/2002
Treatment Summary:J SAND COMMINGLED W/CODELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 5
CALC_BBLS_OIL 5
CALC_GOR 69200
CALC_MCF_GAS 346
CASING_PRESS 530
GRAVITY_OIL 60
MCF_GAS 346
TUBING_PRESS 325
Perforation Data:
Interval Top:7936 ft.# Of Holes:123
Interval Bottom:7986 ft.Hole Size:0.45 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/21/2014                 Interval Top: 7493 ft.    Interval Bottom: 7514 ft.

 Completed Information for Formation CODELL
1st Production Date:1/12/2006Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/26/2010
Treatment Summary:SET CIBP @ 7560' W2 SACKS OF SAND FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUYT THE CIBP TO COMMINGLE WELL WITHIN THE NEXT SIX MONTHS.
Formation Treatment
Treatment Date:1/11/2006
Treatment Summary:NO ADDITIONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 36
CALC_BBLS_H2O 0
CALC_BBLS_OIL 36
CALC_GOR 3194
CALC_MCF_GAS 115
CASING_PRESS 336
GRAVITY_OIL 46
MCF_GAS 115
TUBING_PRESS 174
Perforation Data:
Interval Top:7493 ft.# Of Holes:63
Interval Bottom:7514 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 1/21/2014                 Interval Top: 7493 ft.    Interval Bottom: 7986 ft.

 Completed Information for Formation J-CODELL
1st Production Date:3/25/2009Choke Size:0.156 in.
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/25/2002
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7899 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/30/2009Test Method:FLOWING
Hours Tested:Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1168
CALC_BBLS_OIL 3
CALC_GOR 21000
CALC_MCF_GAS 63
CASING_PRESS 370
GRAVITY_OIL 49
TUBING_PRESS 310
Perforation Data:
Interval Top:7493 ft.# Of Holes:186
Interval Bottom:7986 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/21/2014                 Interval Top: 7222 ft.    Interval Bottom: 7986 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/14/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/1/2012Treatment End Date:N/A
Treatment Summary:DRILLED OUT CIBP TO COMMINGLE JSND WITH NB/CD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7478 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 3
BTU_GAS 1334
CALC_BBLS_OIL 3
CALC_GOR 6667
CALC_MCF_GAS 18
CASING_PRESS 289
GRAVITY_OIL 49
MCF_GAS 18
TUBING_PRESS 276
Perforation Data:
Interval Top:7222 ft.# Of Holes:258
Interval Bottom:7986 ft.Hole Size:0.375 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/21/2014                 Interval Top: 7222 ft.    Interval Bottom: 7514 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/15/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/28/2013Treatment End Date:N/A
Treatment Summary:DRILLED OUT CIBP TO COMMINGLE JSND WITH NB/CD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7222 ft.# Of Holes:135
Interval Bottom:7514 ft.Hole Size:0.375 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/21/2014                 Interval Top: 7222 ft.    Interval Bottom: 7371 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/11/2010Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2010
Treatment Summary:FRAC NBRR W/500 GAL 15% HC1 & 238,812 GAL SW & 201,740# 30/50 SAND & 4,000# 20/40 SUPERLC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/24/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1185
CALC_GOR 1
CALC_MCF_GAS 10
CASING_PRESS 627
GRAVITY_OIL 48
Perforation Data:
Interval Top:7222 ft.# Of Holes:72
Interval Bottom:7371 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/21/2014
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No