Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20040
Well Classification: OW Status: PA - 7/27/2022
Well Name/No:CAPEHART #42-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/27/2022
FacilityID:257910LocationID:331021
County:WELD #123Location:SENE 29 6N64W 6
Field:WATTENBERG - #90750Elevation:4682 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2017FNL  860 FELLat/Long: 40.458565 / -104.567856Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.458470 / -104.567750Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/27/2022             Measured TD: 7126 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/27/2022
Wellbore Permit
Permit #:000888 Expiration Date:8/24/2001
Proposed Depth/Form:7300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2NE4

Wellbore Completed
Completion Date:N/A
Spud Date:9/29/2000Spud Date Is:ACTUAL
Measured TD:7126 ft.Measured PB depth:7097 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR, IND,DENSITY,NEUTRON
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 390 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 390 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7097 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 5872 ft., Bottom: 7097 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7097 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 3225 ft., Bottom: 5872 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 3125 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 3146 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2795 ft.NN
PARKMAN3575 ft.NN
SUSSEX4362 ft.NN
NIOBRARA6590 ft.NN
FORT HAYS6850 ft.NN
CODELL6894 ft.NN
CARLILE6914 ft.NN
GREENHORN6944 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/2/2012                  Interval Top: 6899 ft.    Interval Bottom: 6907 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/13/2011
Treatment Summary:Re-pref Codell 6899'-6907' (24 holes) Re-Frac'd Codell w/ 119 bbl FE-1A pad, 598 bbls of 26# pHaser pad, 2012 bbls of 26# pHaser, 217120# 20/40 Preferd Rock , 8000 lbs# 20/40 SB Excel.
Formation Treatment
Treatment Date:10/12/2000
Treatment Summary:10/12/00 BJ FRACED WITH 3355 BBL OF 22# VISTAR GEL AND 4,000# OF 12/20RC & 237,600# OF 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 37
CALC_BBLS_H2O 3
CALC_BBLS_OIL 37
CALC_MCF_GAS 220
CASING_PRESS 200
MCF_GAS 220
Perforation Data:
Interval Top:6899 ft.# Of Holes:24
Interval Bottom:6907 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/8/2022                  Interval Top: 6600 ft.    Interval Bottom: 6907 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/9/2000Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 26
BTU_GAS 1418
CALC_BBLS_H2O 1
CALC_BBLS_OIL 26
CALC_GOR 1008
CALC_MCF_GAS 262
CASING_PRESS 400
GRAVITY_OIL 57
MCF_GAS 262
TUBING_PRESS 400
Perforation Data:
Interval Top:6600 ft.# Of Holes:52
Interval Bottom:6907 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/1/2012                  Interval Top: 6600 ft.    Interval Bottom: 6735 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/13/2011
Treatment Summary:Perf'd Niobrara "A" 6600-6602 ' (4 holes),Niobrara "B" 6727'-6735' (24 holes) ReFrac'd Niobrara with 119 bbl active pad, 1549 bbls of Slickwater pad, 142 bbls of pHaser 20# pad, 2279 bbls of pHaser 20# fluid system and 239020# of 20/42 Preferred Rock, 12000 # 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6600 ft.# Of Holes:28
Interval Bottom:6735 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/27/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No