Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19883
Well Classification: GW Status: PA - 3/19/2019
Well Name/No:KIYOTA #43-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/19/2019
FacilityID:256479LocationID:336177
County:WELD #123Location:NESE 35 3N67W 6
Field:WATTENBERG - #90750Elevation:4827 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2230FSL  1773 FELLat/Long: 40.180447 / -104.854942Lat/Long Source: Calculated From Footages
As Drilled Location:2229 FSL  1791 FELLat/Long: 40.180460 / -104.854940Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/30/2013
End Date: 5/30/2013
Reported: 7/28/2013
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 12/17/2017             Measured TD: 8275 ft.    Vertical TD: 7922 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 12/17/2017
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:6/27/2001
Proposed Top PZ Location:Sec: Twp: Footage: 2089 FSL  553 FEL
Bottom Hole Location:Sec:35 Twp: 3N 67W Footage: 2081 FSL  494 FEL
Proposed Depth/Form:8275 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:3/3/2000
Spud Date:1/19/2000Spud Date Is:ACTUAL
Measured TD:8275 ft.Measured PB depth:8242 ft.
True Vertical TD:7922 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2089 FSL  553 FEL
Bottom Hole Location:Sec:35 Twp: 3N 67WFootage: 2081 FSL  494 FEL
Log Types:COMP DENS COMP NEUT GR, DUAL IND GU LOG GR,CBL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 390 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 390 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8274 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 6565 ft., Bottom: 8274 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4218 ft.NN
SHANNON4782 ft.NN
NIOBRARA7295 ft.NN
FORT HAYS7574 ft.NN
CODELL7601 ft.NN
CARLILE7630 ft.NN
GREENHORN7662 ft.NN
BENTONITE7917 ft.NN
GRANEROS7918 ft.NN
MOWRY8092 ft.NN
J-2 SAND8106 ft.NN
SKULL CREEK8237 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 3/19/2019                 Interval Top: 8138 ft.    Interval Bottom: 8144 ft.

 Completed Information for Formation J SAND
1st Production Date:3/4/2000Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/3/2000
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/2/2000Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 37
BBLS_OIL 4
CALC_BBLS_H2O 37
CALC_BBLS_OIL 4
CALC_GOR 73250
CALC_MCF_GAS 293
CASING_PRESS 450
MCF_GAS 293
TUBING_PRESS 240
Perforation Data:
Interval Top:8138 ft.# Of Holes:
Interval Bottom:8144 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/14/2013                 Interval Top: 7604 ft.    Interval Bottom: 7628 ft.

 Completed Information for Formation CODELL
1st Production Date:7/25/2000Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/30/2013Treatment End Date:5/30/2013
Treatment Summary:Set CIBP @ 7690'. Refrac'd the Codell w/250,560 # sand and 82,060 gal (1954 gal) frac fluid. Drilled out CIBP.
Total fluid used in treatment (bbls):1954Max pressure during treatment (psi):4392
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):612
Fresh water used in treatment (bbls):1954Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250560Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/3/2000
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 62
CALC_BBLS_H2O 8
CALC_BBLS_OIL 62
CALC_GOR 2968
CALC_MCF_GAS 184
CASING_PRESS 300
MCF_GAS 184
Perforation Data:
Interval Top:7604 ft.# Of Holes:48
Interval Bottom:7628 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 2/3/2009                  Interval Top: 7604 ft.    Interval Bottom: 8144 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/3/2000
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:8138 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 31
CALC_BBLS_H2O 7
CALC_BBLS_OIL 31
CALC_GOR 15677
CALC_MCF_GAS 486
CASING_PRESS 630
MCF_GAS 486
TUBING_PRESS 430
Perforation Data:
Interval Top:7604 ft.# Of Holes:84
Interval Bottom:8144 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 8/14/2013                 Interval Top: 7344 ft.    Interval Bottom: 8144 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/3/2000
Treatment Summary:JSND-NBRR-CDL COMMINGLE. RELEASED CFP @ 7380' AND 7488' TO COMMINGLE JSND-NBRR-CODL. 3/19/09
Tubing Size:2.375 in.Tubing Setting Depth:8124 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2013Test Method:FLOW
Hours Tested:2Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 11
BTU_GAS 1272
CALC_BBLS_H2O 96
CALC_BBLS_OIL 132
CALC_GOR 6363
CALC_MCF_GAS 840
CASING_PRESS 644
GRAVITY_OIL 58
MCF_GAS 70
TUBING_PRESS 549
Perforation Data:
Interval Top:7344 ft.# Of Holes:184
Interval Bottom:8144 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/19/2019                 Interval Top: 7344 ft.    Interval Bottom: 7628 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/26/2009
Treatment Summary:NB/CD REFRAC AND RECOMPLETION; SET CFP@7730 1/19/09 REFRACD THE CD W/114,030 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTANING 250,900@ SAND1/26/09. SET CFP@ 7440 1/26/09 FRAC'D THE NB W/140,532 GAL 18#VISTAR CROSS LINKED GEL HYBRID CONTAINING 250,140# SND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/3/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 40
BTU_GAS 1282
CALC_BBLS_H2O 30
CALC_BBLS_OIL 40
CALC_GOR 6800
CALC_MCF_GAS 272
CASING_PRESS 351
GRAVITY_OIL 52
MCF_GAS 272
Perforation Data:
Interval Top:7344 ft.# Of Holes:148
Interval Bottom:7628 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/4/2014                  Interval Top: 7344 ft.    Interval Bottom: 7370 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/3/1999Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/30/2013Treatment End Date:5/29/2013
Treatment Summary:CFP set @ 7425. Frac'd Niobrara w/250,300 # sand and 90,712 gal (2160 bbls) frac fluid. Drill out plugs.
Total fluid used in treatment (bbls):2160Max pressure during treatment (psi):4841
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):611
Fresh water used in treatment (bbls):2160Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7344 ft.# Of Holes:52
Interval Bottom:7370 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/19/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No