|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/2/2018 Measured TD: 8052 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/2/2018 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 9/20/2014 | | Proposed Depth/Form: | 8052 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4 | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 525 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 525 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 326, Top: 6960 ft., Bottom: 8037 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4676 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 120, Top: 4110 ft., Bottom: 4676 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/28/2000 | | Spud Date: | 3/28/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 8052 ft. | Measured PB depth: | 8037 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR,CB,DENSITY,INDUCTION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 525 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 525 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 206, Top: 6960 ft., Bottom: 8037 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4674 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 120, Top: 4110 ft., Bottom: 4680 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7038 ft. | | N | N | | CODELL | 7296 ft. | | N | N | | J SAND | 7736 ft. | | N | N | | DAKOTA | 7948 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 4/2/2018 Interval Top: 7948 ft. Interval Bottom: 7955 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/28/2000 | | Treatment Summary: | 82740 GAL & 125180# 20/40. NOT TESTED, FLOWBACK ONLY. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | Perforation Data: | | Interval Top: | 7948 ft. | # Of Holes: | 42 | | Interval Bottom: | 7955 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 4/2/2018 Interval Top: 7736 ft. Interval Bottom: 7798 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/28/2000 | | Treatment Summary: | 132048 GAL & 426520# SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/23/2000 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 15 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 61000 | | CALC_MCF_GAS | 915 | | CASING_PRESS | 1030 | | MCF_GAS | 915 | | TUBING_PRESS | 930 |
| | Perforation Data: | | Interval Top: | 7736 ft. | # Of Holes: | 124 | | Interval Bottom: | 7798 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/02/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|