Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19803
Well Classification: GW Status: PR - 5/1/2020
Well Name/No:DEVORE #41-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2020
FacilityID:256073LocationID:336458
County:WELD #123Location:NENE 34 3N66W 6
Field:WATTENBERG - #90750Elevation:4959 ft.
Planned Location:460FNL  608 FELLat/Long: 40.187627 / -104.755969Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.187681 / -104.755845Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2020             Measured TD: 7980 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2020
Wellbore Permit
Permit #:Expiration Date:1/30/2002
Proposed Depth/Form:7980 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: E4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:11/22/1999
Spud Date:10/23/1999Spud Date Is:ACTUAL
Measured TD:7980 ft.Measured PB depth:7938 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND GUARD LOG GR; GR CBL; COM DEN COM NEU GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 727 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 727 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7974 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 6673 ft., Bottom: 7974 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4420 ft.NN
SHANNON5070 ft.NN
NIOBRARA7110 ft.NN
FORT HAYS7366 ft.NN
CODELL7388 ft.NN
CARLILE7406 ft.NN
GREENHORN7448 ft.NN
BENTONITE7663 ft.NN
GRANEROS7664 ft.NN
MOWRY7816 ft.NN
J-2 SAND7829 ft.NN
SKULL CREEK7953 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 5/1/2020                  Interval Top: 7832 ft.    Interval Bottom: 7898 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/22/1999
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 9
CALC_BBLS_H2O 23
CALC_BBLS_OIL 9
CALC_GOR 68667
CALC_MCF_GAS 618
CASING_PRESS 520
MCF_GAS 618
TUBING_PRESS 320
Perforation Data:
Interval Top:7832 ft.# Of Holes:96
Interval Bottom:7898 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/23/2009                 Interval Top: 7388 ft.    Interval Bottom: 7404 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/10/2009
Treatment Summary:FRAC CODELL WITH 1000 # 100 MESH, 1/2 PPG & 1 PPG, 300,000# 20/40 FRAC SAND. 1 PPG THRU 4 PPG IN 127,302 GALS VISTAR 22 LHT, 22 & 20.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/12/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 32
CALC_BBLS_H2O 9
CALC_BBLS_OIL 32
CALC_GOR 4938
CALC_MCF_GAS 158
CASING_PRESS 180
MCF_GAS 158
Perforation Data:
Interval Top:7388 ft.# Of Holes:32
Interval Bottom:7404 ft.Hole Size:0.3 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 8/23/2009                 Interval Top: 7388 ft.    Interval Bottom: 7898 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/22/1999
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7821 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/15/2001Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 40
CALC_BBLS_H2O 7
CALC_BBLS_OIL 40
CALC_GOR 6037
CALC_MCF_GAS 242
CASING_PRESS 540
MCF_GAS 242
TUBING_PRESS 240
Perforation Data:
Interval Top:7388 ft.# Of Holes:128
Interval Bottom:7898 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/25/2009                Interval Top: 7120 ft.    Interval Bottom: 7897 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/22/1999
Treatment Summary:RELEASED RP @ 7220'. COMMINGLE THE JSND-NBRR-CODL.
Tubing Size:2.375 in.Tubing Setting Depth:7817 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/25/2009Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 35
BTU_GAS 1205
CALC_BBLS_H2O 6
CALC_BBLS_OIL 35
CALC_GOR 6429
CALC_MCF_GAS 225
CASING_PRESS 803
GRAVITY_OIL 53
MCF_GAS 225
TUBING_PRESS 395
Perforation Data:
Interval Top:7120 ft.# Of Holes:248
Interval Bottom:7897 ft.Hole Size:0.48 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 8/23/2009                 Interval Top: 7120 ft.    Interval Bottom: 7404 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/19/2009
Treatment Summary:RECPMLTN. SET RBP @7470' . REFRACD CODL W/108,738 GAL 24/20# VISTAR X-LINKED GEL HYBRID W/ 250,960# 20/40 SAND.RELEASED RBP @7470'. SET RBP @ 7220'.REFRC'D NBRR W/ 153,846 GAL 12/20# VISTAR X-LINKED GEL HYBRID W/ 250,960# 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/23/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 27
BBLS_OIL 65
BTU_GAS 1205
CALC_BBLS_H2O 27
CALC_BBLS_OIL 65
CALC_GOR 4215
CALC_MCF_GAS 274
CASING_PRESS 571
GRAVITY_OIL 53
MCF_GAS 274
Perforation Data:
Interval Top:7120 ft.# Of Holes:152
Interval Bottom:7404 ft.Hole Size:0.48 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)466
Total Gas Produced (MCF)8843
GOR18976
GOR DeterminationMCFE
Average BOE per Day5.482
Average MCFE per Day31.768

 Federal Financial Assurance  i 

 Tribal Well  i No