|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2020 Measured TD: 7980 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2020 | Wellbore Permit | | Permit #: | | Expiration Date: | 1/30/2002 | Proposed Depth/Form: | 7980 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: E4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 |
| | |
Wellbore Completed | Completion Date: | 11/22/1999 | Spud Date: | 10/23/1999 | Spud Date Is: | ACTUAL | Measured TD: | 7980 ft. | Measured PB depth: | 7938 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DUAL IND GUARD LOG GR; GR CBL; COM DEN COM NEU GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 727 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 0 ft., Bottom: 727 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7974 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 280, Top: 6673 ft., Bottom: 7974 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4420 ft. | | N | N | SHANNON | 5070 ft. | | N | N | NIOBRARA | 7110 ft. | | N | N | FORT HAYS | 7366 ft. | | N | N | CODELL | 7388 ft. | | N | N | CARLILE | 7406 ft. | | N | N | GREENHORN | 7448 ft. | | N | N | BENTONITE | 7663 ft. | | N | N | GRANEROS | 7664 ft. | | N | N | MOWRY | 7816 ft. | | N | N | J-2 SAND | 7829 ft. | | N | N | SKULL CREEK | 7953 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7832 ft. Interval Bottom: 7898 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/22/1999 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 23 | BBLS_OIL | 9 | CALC_BBLS_H2O | 23 | CALC_BBLS_OIL | 9 | CALC_GOR | 68667 | CALC_MCF_GAS | 618 | CASING_PRESS | 520 | MCF_GAS | 618 | TUBING_PRESS | 320 |
| Perforation Data: | Interval Top: | 7832 ft. | # Of Holes: | 96 | Interval Bottom: | 7898 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 8/23/2009 Interval Top: 7388 ft. Interval Bottom: 7404 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | 0.313 in. | Formation Name: | CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/10/2009 | Treatment Summary: | FRAC CODELL WITH 1000 # 100 MESH, 1/2 PPG & 1 PPG, 300,000# 20/40 FRAC SAND. 1 PPG THRU 4 PPG IN 127,302 GALS VISTAR 22 LHT, 22 & 20. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/12/2001 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 9 | BBLS_OIL | 32 | CALC_BBLS_H2O | 9 | CALC_BBLS_OIL | 32 | CALC_GOR | 4938 | CALC_MCF_GAS | 158 | CASING_PRESS | 180 | MCF_GAS | 158 |
| Perforation Data: | Interval Top: | 7388 ft. | # Of Holes: | 32 | Interval Bottom: | 7404 ft. | Hole Size: | 0.3 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 8/23/2009 Interval Top: 7388 ft. Interval Bottom: 7898 ft. Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | 0.313 in. | Formation Name: | J-CODELL | Commingled: | Yes | Production Method: | PUMPING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/22/1999 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7821 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/15/2001 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 7 | BBLS_OIL | 40 | CALC_BBLS_H2O | 7 | CALC_BBLS_OIL | 40 | CALC_GOR | 6037 | CALC_MCF_GAS | 242 | CASING_PRESS | 540 | MCF_GAS | 242 | TUBING_PRESS | 240 |
| Perforation Data: | Interval Top: | 7388 ft. | # Of Holes: | 128 | Interval Bottom: | 7898 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/25/2009 Interval Top: 7120 ft. Interval Bottom: 7897 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/22/1999 | Treatment Summary: | RELEASED RP @ 7220'. COMMINGLE THE JSND-NBRR-CODL. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7817 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/25/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 35 | BTU_GAS | 1205 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 35 | CALC_GOR | 6429 | CALC_MCF_GAS | 225 | CASING_PRESS | 803 | GRAVITY_OIL | 53 | MCF_GAS | 225 | TUBING_PRESS | 395 |
| Perforation Data: | Interval Top: | 7120 ft. | # Of Holes: | 248 | Interval Bottom: | 7897 ft. | Hole Size: | 0.48 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 8/23/2009 Interval Top: 7120 ft. Interval Bottom: 7404 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/19/2009 | Treatment Summary: | RECPMLTN. SET RBP @7470' . REFRACD CODL W/108,738 GAL 24/20# VISTAR X-LINKED GEL HYBRID W/ 250,960# 20/40 SAND.RELEASED RBP @7470'. SET RBP @ 7220'.REFRC'D NBRR W/ 153,846 GAL 12/20# VISTAR X-LINKED GEL HYBRID W/ 250,960# 20/40 SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/23/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 27 | BBLS_OIL | 65 | BTU_GAS | 1205 | CALC_BBLS_H2O | 27 | CALC_BBLS_OIL | 65 | CALC_GOR | 4215 | CALC_MCF_GAS | 274 | CASING_PRESS | 571 | GRAVITY_OIL | 53 | MCF_GAS | 274 |
| Perforation Data: | Interval Top: | 7120 ft. | # Of Holes: | 152 | Interval Bottom: | 7404 ft. | Hole Size: | 0.48 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 466 |
Total Gas Produced (MCF) | 8843 |
GOR | 18976 |
GOR Determination | MCFE |
Average BOE per Day | 5.482 |
Average MCFE per Day | 31.768 |
Federal Financial Assurance | i | |
|
|