Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19800
Well Classification: GW Status: PA - 4/26/2019
Well Name/No:ECHEVERRIA #14-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/26/2019
FacilityID:256006LocationID:330869
County:WELD #123Location:SWSW 2 2N67W 6
Field:WATTENBERG - #90750Elevation:4888 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:462FSL  460 FWLLat/Long: 40.160987 / -104.865603Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.161141 / -104.865515Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/19/2012
End Date: 1/19/2012
Reported: 7/2/2012
Prior to rule 205A.b.(2)(A)
Days to report: 165
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 4/26/2019             Measured TD: 8020 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 4/26/2019
Wellbore Permit
Permit #:19990603 Expiration Date:1/30/2002
Proposed Depth/Form:8020 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 319, Drill Unit: W2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:10/21/1999
Spud Date:9/28/1999Spud Date Is:ACTUAL
Measured TD:8020 ft.Measured PB depth:7995 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY, COMPENSATED NEUTRON GR, DUAL INDUCTION GUARD LOG GR; GR CBL VARIBLE DENSITY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 763 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 495, Top: 0 ft., Bottom: 763 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8024 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6550 ft., Bottom: 8024 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5099 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 3820 ft., Bottom: 5142 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4314 ft.NN
SHANNON4849 ft.NN
NIOBRARA7136 ft.NN
FORT HAYS7356 ft.NN
CODELL7398 ft.NN
CARLILE7418 ft.NN
GREENHORN7448 ft.NN
BENTONITE7672 ft.NN
GRANEROS7673 ft.NN
MOWRY7829 ft.NN
J-2 SAND7842 ft.NN
SKULL CREEK7958 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 4/26/2019                 Interval Top: 7846 ft.    Interval Bottom: 7904 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/21/1999
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 41
BBLS_OIL 10
CALC_BBLS_H2O 41
CALC_BBLS_OIL 10
CALC_GOR 117600
CALC_MCF_GAS 1176
CASING_PRESS 715
MCF_GAS 1176
TUBING_PRESS 380
Perforation Data:
Interval Top:7846 ft.# Of Holes:100
Interval Bottom:7904 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OG                     Status:  CM - 4/30/2012                 Interval Top: 7398 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation CODELL
1st Production Date:5/26/2001Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/19/2012
Treatment Summary:Codell Tri-frac Frac’d 7398’ - 7418’ with 121,939 gal frac fluid and 251,780# sand. 01-19-12
Formation Treatment
Treatment Date:10/21/1999
Treatment Summary:FRAC WELL WITH 10400#100 MESH 1/2 PPG & 1 PPG. 300680 # 20/40 FRAC SAND 1 PPG THRU 4 PPG. IN 128856 GALS VISTAR 22 LHT, 22 & 20.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 32
CALC_BBLS_H2O 10
CALC_BBLS_OIL 32
CALC_GOR 4469
CALC_MCF_GAS 143
CASING_PRESS 170
MCF_GAS 143
Perforation Data:
Interval Top:7398 ft.# Of Holes:80
Interval Bottom:7418 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 7/26/2012                 Interval Top: 7398 ft.    Interval Bottom: 7904 ft.

 Completed Information for Formation J-CODELL
1st Production Date:5/26/2001Choke Size:0.313 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/21/1999
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/25/2001Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 23
CALC_BBLS_H2O 5
CALC_BBLS_OIL 23
CALC_GOR 26783
CALC_MCF_GAS 616
CASING_PRESS 520
MCF_GAS 616
TUBING_PRESS 300
Perforation Data:
Interval Top:7398 ft.# Of Holes:180
Interval Bottom:7904 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OG                   Status:  CM - 3/10/2012                 Interval Top: 7190 ft.    Interval Bottom: 7904 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/22/1999Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7824 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/10/2012Test Method:Flow
Hours Tested:2Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 20
BTU_GAS 1
CALC_BBLS_H2O 10
CALC_BBLS_OIL 192
CALC_GOR 6448
CALC_MCF_GAS 1238
CASING_PRESS 485
GRAVITY_OIL 53
MCF_GAS 129
TUBING_PRESS 386
Perforation Data:
Interval Top:7190 ft.# Of Holes:212
Interval Bottom:7904 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/26/2019                 Interval Top: 7190 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/10/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/21/1999
Treatment Summary:NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7290' TO COMMINGLE THE NBRR-CDL. 01-22-09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 1
BTU_GAS 1283
CALC_BBLS_H2O 1
CALC_BBLS_OIL 1
CALC_GOR 3000
CALC_MCF_GAS 3
CASING_PRESS 1440
GRAVITY_OIL 51
MCF_GAS 3
TUBING_PRESS 88
Perforation Data:
Interval Top:7190 ft.# Of Holes:172
Interval Bottom:7418 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 3/19/2019                 Interval Top: 7190 ft.    Interval Bottom: 7280 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/10/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/20/2019Treatment End Date:N/A
Treatment Summary:perf 7190-7206 with 32 shots 01/19/2009 perf 7266-7280 with 56 shots 01/18/2012
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/19/2012
Treatment Summary:Niobrara Refrac Refrac’d from 7190’ - 7206’ with 140,327 gal frac fluid and 251,300# sand. 01-19-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7190 ft.# Of Holes:92
Interval Bottom:7280 ft.Hole Size:0.425 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/26/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No