Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19752
Well Classification: GW Status: SI - 10/1/2025
Well Name/No:DAVIS GAS UNIT #32-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2025
FacilityID:89447LocationID:330846
County:WELD #123Location:SWNE 9 2N66W 6
Field:SPINDLE - #77900Elevation:4903 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2180FNL  2180 FELLat/Long: 40.153979 / -104.780594Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.153979 / -104.780594Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2011
End Date: 4/19/2011
Reported: 1/6/2012
Prior to rule 205A.b.(2)(A)
Days to report: 262
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2025             Measured TD: 7980 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2025
Wellbore Permit
Permit #: Expiration Date:4/6/2013
Proposed Depth/Form:7980 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 718 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 718 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7962 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 275, Top: 6550 ft., Bottom: 7962 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4850 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 4350 ft., Bottom: 4850 ft.

Wellbore Completed
Completion Date:4/29/2000
Spud Date:3/18/2000Spud Date Is:ACTUAL
Measured TD:7980 ft.Measured PB depth:7921 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND GL,SPEC DENS DUAL SPAC NEUT LOG,CBL-VDL-GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 718 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 718 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7962 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 6550 ft., Bottom: 7962 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4805 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 4020 ft., Bottom: 4805 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4395 ft.NN
SHANNON5015 ft.NN
NIOBRARA7121 ft.NN
FORT HAYS7350 ft.NN
CODELL7374 ft.NN
CARLILE7394 ft.NN
GREENHORN7432 ft.NN
BENTONITE7649 ft.NN
GRANEROS7650 ft.NN
MOWRY7796 ft.NN
J-2 SAND7812 ft.NN
SKULL CREEK7925 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 10/1/2025                 Interval Top: 7836 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J SAND
1st Production Date:4/30/2000Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/29/2000
Treatment Summary:FRAC J-SAND WITH 500,300# 20/40 SAND AND 221,148 GALS 25,27, & 30# FRACGEL, BDP 2808 PSI @ 4.5 BPM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 3
CALC_GOR 205640
CASING_PRESS 530
MCF_GAS 514
TUBING_PRESS 380
Perforation Data:
Interval Top:7836 ft.# Of Holes:47
Interval Bottom:7860 ft.Hole Size:0.375 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/15/2002                 Interval Top: 7375 ft.    Interval Bottom: 7392 ft.

 Completed Information for Formation CODELL
1st Production Date:11/19/2001Choke Size:0.344 in.
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/29/2000
Treatment Summary:FRAC W/300,680# 20/40 FRAC SAND IN 127,271 GALS PHOENIX
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/15/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 38
CALC_GOR 3316
CASING_PRESS 190
MCF_GAS 126
Perforation Data:
Interval Top:7375 ft.# Of Holes:34
Interval Bottom:7392 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 4/15/2002                 Interval Top: 7375 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J-CODELL
1st Production Date:3/12/2002Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/29/2000
Treatment Summary:DRILL OUT CIBP. RUN TBG. SWAB BACK
Tubing Size:2.375 in.Tubing Setting Depth:7825 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/11/2002Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 23
CALC_GOR 15809
CASING_PRESS 500
MCF_GAS 356
TUBING_PRESS 400
Perforation Data:
Interval Top:7375 ft.# Of Holes:81
Interval Bottom:7860 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/27/2011                 Interval Top: 7171 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/27/2011
Treatment Summary:CIBP SET @ 7440 ON 4/19/11 AND DRILLED OUT 5/19/11; CIBP SET @ 7240 ON 4/19/11 AND DRILLED OUT 5/19/11. TBG LANDED 5/20/11. COMMINGLED ON 5/21/11.
Tubing Size:2.375 in.Tubing Setting Depth:7807 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/27/2011Test Method:
Hours Tested:23Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 32
BTU_GAS 1
CALC_BBLS_OIL 33
CALC_GOR 12562
CALC_MCF_GAS 419
CASING_PRESS 387
GRAVITY_OIL 52
MCF_GAS 402
TUBING_PRESS 206
Perforation Data:
Interval Top:7171 ft.# Of Holes:141
Interval Bottom:7860 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 10/1/2025                 Interval Top: 7171 ft.    Interval Bottom: 7392 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/20/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/19/2011
Treatment Summary:PERFED THE NBRR FROM 7171-7186, 4 SPF, 60 HOLES; FRAC'D WITH 145614 GAL FRAC FLUID AND 250260# SAND FRAC'D THE CD WITH 116802 GAL FRAC FLUID AND 250300# SAND. CIBP SET @ 7440 ON 4/19/11 AND DRILLED OUT 5/19/11; CIBP SET @ 7240 ON 4/19/11 AND DRILLED OUT 5/19/11. TBG LANDED 5/20/11.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 32
BTU_GAS 1
CALC_BBLS_OIL 33
CALC_GOR 28
CALC_MCF_GAS 419
CASING_PRESS 387
GRAVITY_OIL 52
MCF_GAS 402
TUBING_PRESS 206
Perforation Data:
Interval Top:7171 ft.# Of Holes:91
Interval Bottom:7392 ft.Hole Size:0.7 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)11
GOR
GOR DeterminationMCFE
Average BOE per Day0.006
Average MCFE per Day0.031

 Federal Financial Assurance  i 

 Tribal Well  i No