|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 10/1/2025 Measured TD: 7980 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 10/1/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 4/6/2013 | | Proposed Depth/Form: | 7980 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 718 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 718 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7962 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: 6550 ft., Bottom: 7962 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4850 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 4350 ft., Bottom: 4850 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/29/2000 | | Spud Date: | 3/18/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 7980 ft. | Measured PB depth: | 7921 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL IND GL,SPEC DENS DUAL SPAC NEUT LOG,CBL-VDL-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 718 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 718 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7962 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 6550 ft., Bottom: 7962 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4805 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 4020 ft., Bottom: 4805 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4395 ft. | | N | N | | SHANNON | 5015 ft. | | N | N | | NIOBRARA | 7121 ft. | | N | N | | FORT HAYS | 7350 ft. | | N | N | | CODELL | 7374 ft. | | N | N | | CARLILE | 7394 ft. | | N | N | | GREENHORN | 7432 ft. | | N | N | | BENTONITE | 7649 ft. | | N | N | | GRANEROS | 7650 ft. | | N | N | | MOWRY | 7796 ft. | | N | N | | J-2 SAND | 7812 ft. | | N | N | | SKULL CREEK | 7925 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 10/1/2025 Interval Top: 7836 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/30/2000 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/29/2000 | | Treatment Summary: | FRAC J-SAND WITH 500,300# 20/40 SAND AND 221,148 GALS 25,27, & 30# FRACGEL, BDP 2808 PSI @ 4.5 BPM |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BBLS_OIL | 3 | | CALC_GOR | 205640 | | CASING_PRESS | 530 | | MCF_GAS | 514 | | TUBING_PRESS | 380 |
| | Perforation Data: | | Interval Top: | 7836 ft. | # Of Holes: | 47 | | Interval Bottom: | 7860 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: GW Status: CM - 4/15/2002 Interval Top: 7375 ft. Interval Bottom: 7392 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/19/2001 | Choke Size: | 0.344 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/29/2000 | | Treatment Summary: | FRAC W/300,680# 20/40 FRAC SAND IN 127,271 GALS PHOENIX |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/15/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 38 | | CALC_GOR | 3316 | | CASING_PRESS | 190 | | MCF_GAS | 126 |
| | Perforation Data: | | Interval Top: | 7375 ft. | # Of Holes: | 34 | | Interval Bottom: | 7392 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 4/15/2002 Interval Top: 7375 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 3/12/2002 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/29/2000 | | Treatment Summary: | DRILL OUT CIBP. RUN TBG. SWAB BACK |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7825 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/11/2002 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 23 | | CALC_GOR | 15809 | | CASING_PRESS | 500 | | MCF_GAS | 356 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 7375 ft. | # Of Holes: | 81 | | Interval Bottom: | 7860 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/27/2011 Interval Top: 7171 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/27/2011 | | Treatment Summary: | CIBP SET @ 7440 ON 4/19/11 AND DRILLED OUT 5/19/11; CIBP SET @ 7240 ON 4/19/11 AND DRILLED OUT 5/19/11. TBG LANDED 5/20/11. COMMINGLED ON 5/21/11. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7807 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/27/2011 | Test Method: | | | Hours Tested: | 23 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 32 | | BTU_GAS | 1 | | CALC_BBLS_OIL | 33 | | CALC_GOR | 12562 | | CALC_MCF_GAS | 419 | | CASING_PRESS | 387 | | GRAVITY_OIL | 52 | | MCF_GAS | 402 | | TUBING_PRESS | 206 |
| | Perforation Data: | | Interval Top: | 7171 ft. | # Of Holes: | 141 | | Interval Bottom: | 7860 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 10/1/2025 Interval Top: 7171 ft. Interval Bottom: 7392 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/19/2011 | | Treatment Summary: | PERFED THE NBRR FROM 7171-7186, 4 SPF, 60 HOLES; FRAC'D WITH 145614 GAL FRAC FLUID AND 250260# SAND
FRAC'D THE CD WITH 116802 GAL FRAC FLUID AND 250300# SAND.
CIBP SET @ 7440 ON 4/19/11 AND DRILLED OUT 5/19/11; CIBP SET @ 7240 ON 4/19/11 AND DRILLED OUT 5/19/11. TBG LANDED 5/20/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 32 | | BTU_GAS | 1 | | CALC_BBLS_OIL | 33 | | CALC_GOR | 28 | | CALC_MCF_GAS | 419 | | CASING_PRESS | 387 | | GRAVITY_OIL | 52 | | MCF_GAS | 402 | | TUBING_PRESS | 206 |
| | Perforation Data: | | Interval Top: | 7171 ft. | # Of Holes: | 91 | | Interval Bottom: | 7392 ft. | Hole Size: | 0.7 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 11 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.006 |
| Average MCFE per Day | 0.031 |
| Federal Financial Assurance | i | |
|
|