Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19748
Well Classification: GW Status: TA - 11/24/2020
Well Name/No:HERMAN #34-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date11/24/2020
FacilityID:89443LocationID:330843
County:WELD #123Location:SWSE 8 2N66W 6
Field:WATTENBERG - #90750Elevation:4869 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:844FSL  1796 FELLat/Long: 40.147547 / -104.798020Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.147676 / -104.798143Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/16/2012
End Date: 1/16/2012
Reported: 7/31/2012
Prior to rule 205A.b.(2)(A)
Days to report: 197
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 11/24/2020             Measured TD: 7982 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 11/24/2020
Wellbore Permit
Permit #:20020360 Expiration Date:3/6/2003
Proposed Depth/Form:8030 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:5/15/2001
Spud Date:3/27/2001Spud Date Is:ACTUAL
Measured TD:7982 ft.Measured PB depth:7958 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY,COMPENSATED NEUTRON GR DUAL IND. GUARD LOG GR; CBL VDL GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 721 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 505, Top: 0 ft., Bottom: 721 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7974 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 6550 ft., Bottom: 7974 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4853 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 4130 ft., Bottom: 4853 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4354 ft.NN
SHANNON4977 ft.NN
NIOBRARA7128 ft.NN
FORT HAYS7346 ft.NN
CODELL7369 ft.NN
CARLILE7380 ft.NN
GREENHORN7427 ft.NN
GRANEROS7639 ft.NN
BENTONITE7639 ft.NN
MOWRY7791 ft.NN
J-2 SAND7815 ft.NN
SKULL CREEK7916 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  TA - 11/24/2020                Interval Top: 7828 ft.    Interval Bottom: 7866 ft.

 Completed Information for Formation J SAND
1st Production Date:5/15/2001Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/15/2001
Treatment Summary:FRAC WELL WITH 227,366 GALS FRAC GEL 22# HT & 20#. IN 550,000# 20/40 FRAC SAND. 1 PPG THRU 5 PPG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 34
BBLS_OIL 2
CALC_GOR 122417
CASING_PRESS 450
MCF_GAS 294
TUBING_PRESS 270
Perforation Data:
Interval Top:7828 ft.# Of Holes:76
Interval Bottom:7866 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/30/2012                 Interval Top: 7373 ft.    Interval Bottom: 7385 ft.

 Completed Information for Formation CODELL
1st Production Date:4/5/2002Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/25/2012
Treatment Summary:CIBP set @ 7425 on 1/19/12; drilled out 3/1/12 Refrac 7373-7385 w/ 122,934 gal frac fluid and 252,620 # sand (1/25/12)
Formation Treatment
Treatment Date:5/15/2001
Treatment Summary:SET RBP @ 7388'. PERF THE CODELL FROM 7373'-7385' W/4 SPF. FRAC W/241,400# 20/40 SAND IN 116,634 GALS DYNAFLOW-2. RUN ;
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 22
CALC_GOR 4393
CASING_PRESS 200
MCF_GAS 98
Perforation Data:
Interval Top:7373 ft.# Of Holes:48
Interval Bottom:7385 ft.Hole Size:0.43 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 11/21/2002                Interval Top: 7373 ft.    Interval Bottom: 7866 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/15/2001
Treatment Summary:RETRIEVE RBP. RESET TBG. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7817 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 9
CALC_BBLS_H2O 17
CALC_BBLS_OIL 9
CALC_GOR 51111
CALC_MCF_GAS 460
CASING_PRESS 430
MCF_GAS 460
TUBING_PRESS 200
Perforation Data:
Interval Top:7373 ft.# Of Holes:124
Interval Bottom:7866 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/30/2012                 Interval Top: 7189 ft.    Interval Bottom: 7866 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/15/2001
Treatment Summary:JSND-NBRR-CDL COMMINGLE RELEASED RFP @ 7290'. 03-16-09. RELEASED RBP @ 7470' TO COMMINGLE THE JSND-NBRR-CDL. 03-17-09.
Tubing Size:2.375 in.Tubing Setting Depth:7806 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/10/2012Test Method:Flow
Hours Tested:10Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 18
BTU_GAS 1
CALC_BBLS_H2O 24
CALC_BBLS_OIL 43
CALC_GOR 14000
CALC_MCF_GAS 605
CASING_PRESS 540
GRAVITY_OIL 57
MCF_GAS 252
TUBING_PRESS 520
Perforation Data:
Interval Top:7189 ft.# Of Holes:164
Interval Bottom:7866 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  TA - 11/24/2020                Interval Top: 7189 ft.    Interval Bottom: 7385 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/17/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/2/2009
Treatment Summary:NBRR-CDL REFRAC AND RECOMPLETION SET RBP @ 7470'. 02-23-09. RE-FRAC'D THE CODELL WITH 108,864 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,260# 20/40 SAND. 03-02-09 SET RFP @ 7290'. 03-02-09. FRAC'D THE NIOBRARA WITH 140,658 GAL (CONT.)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7189 ft.# Of Holes:88
Interval Bottom:7385 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/24/2012                Interval Top: 7189 ft.    Interval Bottom: 7209 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/17/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/25/2012
Treatment Summary:CBP set @ 7290 on 1/20/12; drilled out 3/1/12 Refrac 7189 – 7209 w/ 133,142 gal frac fluid and 252,360 # sand (1/25/12)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7189 ft.# Of Holes:40
Interval Bottom:7209 ft.Hole Size:
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
05/31/2020
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No