Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19698
Well Classification: GW Status: PA - 9/11/2019
Well Name/No:KUGEL #31-18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/11/2019
FacilityID:251893LocationID:336454
Municipality/County:FIRESTONE / WELD #123Location:NWNE 18 2N67W 6
Field:WATTENBERG - #90750Elevation:4939 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:460FNL  2075 FELLat/Long: 40.144327 / -104.931764Lat/Long Source: Calculated From Footages
As Drilled Location:462 FNL  2072 FELLat/Long: 40.144420 / -104.931530Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 9/11/2019             Measured TD: 8078 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 9/11/2019
Wellbore Permit
Permit #:20021820 Expiration Date:10/9/2003
Proposed Depth/Form:8078 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit:
Formation And Spacing:Code: SNSD , Formation: SHANNON , Order: 250 , Unit Acreage: 80, Drill Unit:

Wellbore Completed
Completion Date:11/5/2004
Spud Date:1/13/1999Spud Date Is:ACTUAL
Measured TD:8078 ft.Measured PB depth:8036 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION GUARD LOG GR; COMPENSATED DENSITY, COMPENSATED NEUTRON GR; GR CBL VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 607 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 607 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8053 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6607 ft., Bottom: 8053 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5107 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 3864 ft., Bottom: 5107 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4240 ft.
SHANNON4841 ft.
NIOBRARA7199 ft.
FORT HAYS7438 ft.
CODELL7461 ft.
CARLILE7484 ft.
GREENHORN7498 ft.
BENTONITE7722 ft.
GRANEROS7723 ft.
MOWRY7870 ft.
J SAND7884 ft.
SKULL CREEK7986 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 9/11/2019                 Interval Top: 7888 ft.    Interval Bottom: 7930 ft.

 Completed Information for Formation J SAND
1st Production Date:3/10/1999Choke Size:0.343 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/5/2004
Treatment Summary:552,200# FRAC SAND IN 166,446 GALS SATURN I 30-25 FRAC FLUID
Tubing Size:2.375 in.Tubing Setting Depth:7883 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/10/1999Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 3
CALC_BBLS_H2O 30
CALC_BBLS_OIL 3
CALC_GOR 180333
CALC_MCF_GAS 541
CASING_PRESS 400
MCF_GAS 541
TUBING_PRESS 210
Perforation Data:
Interval Top:7888 ft.# Of Holes:60
Interval Bottom:7930 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/22/2002                Interval Top: 7464 ft.    Interval Bottom: 8489 ft.

 Completed Information for Formation CODELL
1st Production Date:11/15/2002Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/5/2004
Treatment Summary:300,100# 20/40 FRAC SAND AND 106,637 GALS SILVERSTIM FRAC FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/22/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 19
BBLS_OIL 20
CALC_BBLS_H2O 19
CALC_BBLS_OIL 20
CALC_GOR 4450
CALC_MCF_GAS 89
CASING_PRESS 1460
MCF_GAS 89
TUBING_PRESS 300
Perforation Data:
Interval Top:7464 ft.# Of Holes:56
Interval Bottom:8489 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  OW                   Status:  CM - 11/5/2004                 Interval Top: 7464 ft.    Interval Bottom: 7930 ft.

 Completed Information for Formation J-CODELL
1st Production Date:12/5/2002Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:11/5/2004
Treatment Summary:POOH W/ TBG. RELEASE RBP. RESET TBG. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7882 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/12/2002Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 23
CALC_BBLS_H2O 11
CALC_BBLS_OIL 23
CALC_GOR 12435
CALC_MCF_GAS 286
CASING_PRESS 440
MCF_GAS 286
TUBING_PRESS 210
Perforation Data:
Interval Top:7464 ft.# Of Holes:116
Interval Bottom:7930 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 11/5/2004                 Interval Top: 7225 ft.    Interval Bottom: 7930 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:11/5/2004Choke Size:0.250 in.
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/5/2004
Treatment Summary:JSND-NB-CD COMMINGLE DRILL OUT CFP'S @ 7320' AND 7310' TO COMMINGLE THE JSND-NB-CD, 11-02-04
Tubing Size:2.375 in.Tubing Setting Depth:7889 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/5/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 67
BBLS_OIL 14
CALC_BBLS_H2O 67
CALC_BBLS_OIL 14
CALC_GOR 17785
CALC_MCF_GAS 249
CASING_PRESS 540
MCF_GAS 249
TUBING_PRESS 230
Perforation Data:
Interval Top:7225 ft.# Of Holes:176
Interval Bottom:7930 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 9/11/2019                 Interval Top: 7170 ft.    Interval Bottom: 7446 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:1.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/3/2010
Treatment Summary:NIOBRARA - FRAC'D WITH 131,922 GAL FRAC FLUID AND 250,960 # SAND (2/15/10. CODELL - FRAC'D WITH 116,928 GAL FRAC FLUID AND 250,960 # SAND (2/3/10)
Tubing Size:2.375 in.Tubing Setting Depth:7860 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/11/2010Test Method:FLOWING
Hours Tested:5Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 7
BTU_GAS 1168
CALC_BBLS_H2O 29
CALC_BBLS_OIL 34
CALC_GOR 121176
CALC_MCF_GAS 720
CASING_PRESS 394
GRAVITY_OIL 51
MCF_GAS 150
TUBING_PRESS 253
Perforation Data:
Interval Top:7170 ft.# Of Holes:
Interval Bottom:7446 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/11/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No