|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 9/1/2024 Measured TD: 8230 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 9/1/2024 | Wellbore Permit | | Permit #: | 00 | Expiration Date: | 9/23/2004 | Proposed Depth/Form: | 8151 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-466 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: DKJCD , Formation: DAKOTA-J-CODELL , Order: 318A , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 0 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1020 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 555, Top: 0 ft., Bottom: 1020 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8151 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 275, Top: 6430 ft., Bottom: 8151 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5122 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 4200 ft., Bottom: 5122 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 6/27/1998 | Spud Date Is: | ACTUAL | Measured TD: | 8230 ft. | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Log Types: | | Log Types: | COMPENSATED NEUTRON LITHO DENSITY; PHASOR INDUCTION SFL GR; CEMENT BOND GR CCL LOG | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1020 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 555, Top: 0 ft., Bottom: 1020 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8148 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 275, Top: 6450 ft., Bottom: 8148 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 5122 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 4200 ft., Bottom: 5122 ft., Determination Method: CBL | Additional Cement: | String Type: SURF , Top: 322 ft., Depth: 1132 ft., Bottom: 1132 ft., Sacks: 170, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4710 ft. | | | | SHANNON | 5626 ft. | | | | NIOBRARA | 7218 ft. | | | | CODELL | 7530 ft. | | | | GREENHORN | 7593 ft. | | | | GRANEROS | 7805 ft. | | | | MOWRY | 7960 ft. | | | | J SAND | 7978 ft. | | | | SKULL CREEK | 8078 ft. | | | | DAKOTA | 8163 ft. | | | |
Formation DKTA Formation Classification: GW Status: TA - 6/1/2022 Interval Top: 8163 ft. Interval Bottom: 8230 ft. Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/20/1998 | Treatment Summary: | SEE SCANNED DOCUMENT #00572659 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8144 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/20/1998 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
CALC_MCF_GAS | 35 | CASING_PRESS | 330 | MCF_GAS | 35 | TUBING_PRESS | 300 |
| Perforation Data: | Interval Top: | 8163 ft. | # Of Holes: | | Interval Bottom: | 8230 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: PR - 4/1/2024 Interval Top: 7981 ft. Interval Bottom: 8016 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/26/1999 | Choke Size: | 0.250 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/26/1999 | Treatment Summary: | FRAC'D WELL WITH 402720# 20/40 FRAC SAND IN 127000 GALS SATURN I-30 25, 1PPG THRU 5 PPG. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7990 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/24/1999 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 18 | BBLS_OIL | 2 | CALC_BBLS_H2O | 18 | CALC_BBLS_OIL | 2 | CALC_GOR | 102500 | CALC_MCF_GAS | 205 | CASING_PRESS | 400 | MCF_GAS | 205 | TUBING_PRESS | 150 |
| Perforation Data: | Interval Top: | 7981 ft. | # Of Holes: | 34 | Interval Bottom: | 8016 ft. | Hole Size: | 0.38 in. |
|
Formation GRNHN Formation Classification: GW Status: PR - 4/1/2024 Interval Top: 7664 ft. Interval Bottom: 7728 ft. Completed Information for Formation GREENHORN | 1st Production Date: | N/A | Choke Size: | | Formation Name: | GREENHORN | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/27/2003 | Treatment Summary: | SEE OGCC COMMENTS |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7658 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/27/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 4 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 4 | CALC_GOR | 3750 | CALC_MCF_GAS | 15 | CASING_PRESS | 720 | MCF_GAS | 15 | TUBING_PRESS | 300 |
| Perforation Data: | Interval Top: | 7664 ft. | # Of Holes: | 256 | Interval Bottom: | 7728 ft. | Hole Size: | |
|
Formation J-GRH Formation Classification: GW Status: CM - 1/18/2004 Interval Top: 7664 ft. Interval Bottom: 8016 ft. Completed Information for Formation J & GREENHORN | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J & GREENHORN | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/18/2004 | Treatment Summary: | DRILL OUT CIBP @ 7820'. CHASE TO BOTTOM @ 8024'. TOH W/TBG, TIH W/PRODUCTION TBG. LAND PRODUCTION TBG @ 7977'. SWAB. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7977 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/18/2004 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 3 | BBLS_OIL | 8 | CALC_BBLS_H2O | 3 | CALC_BBLS_OIL | 8 | CALC_GOR | 6250 | CALC_MCF_GAS | 50 | CASING_PRESS | 620 | MCF_GAS | 50 | TUBING_PRESS | 250 |
| Perforation Data: | Interval Top: | 7664 ft. | # Of Holes: | 668 | Interval Bottom: | 8016 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 5/20/2000 Interval Top: 7531 ft. Interval Bottom: 7548 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/20/2000 | Choke Size: | 0.250 in. | Formation Name: | CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/20/2000 | Treatment Summary: | FRAC W/10080# 100 MESH 1/2 PPG & 1 PPG 300300# 20/40 FRAC SAND 1 PPG - 4 PPG. 133000 GAL VISTAR 22 LFT AND 20 LHT FRAC FLUID. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/18/2000 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 15 | BBLS_OIL | 27 | CALC_BBLS_H2O | 15 | CALC_BBLS_OIL | 27 | CALC_GOR | 2519 | CALC_MCF_GAS | 68 | CASING_PRESS | 140 | MCF_GAS | 68 |
| Perforation Data: | Interval Top: | 7531 ft. | # Of Holes: | 34 | Interval Bottom: | 7548 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/20/2010 Interval Top: 7531 ft. Interval Bottom: 8016 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 6/23/2000 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/23/2000 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 17 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 17 | CALC_GOR | 11471 | CALC_MCF_GAS | 195 | CASING_PRESS | 700 | MCF_GAS | 195 | TUBING_PRESS | 190 |
| Perforation Data: | Interval Top: | 7531 ft. | # Of Holes: | 68 | Interval Bottom: | 8016 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 4/1/2024 Interval Top: 7220 ft. Interval Bottom: 7548 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/2/2010 | Treatment Summary: | NIOBRARA REFRAC: FRAC WITH 141456 GAL FRAC FLUID AND 250660 # SAND. CODELL REFRAC: FRAC WITH 114912 GAL FRAC FLUID AND 250640 # SAND. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7966 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/20/2010 | Test Method: | FLOWING | Hours Tested: | 4 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 3 | BBLS_OIL | 5 | BTU_GAS | 1301 | CALC_BBLS_H2O | 18 | CALC_BBLS_OIL | 30 | CALC_GOR | 3200 | CALC_MCF_GAS | 96 | CASING_PRESS | 630 | GRAVITY_OIL | 50 | MCF_GAS | 16 | TUBING_PRESS | 340 |
| Perforation Data: | Interval Top: | 7220 ft. | # Of Holes: | | Interval Bottom: | 7548 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 2/20/2010 Interval Top: 7220 ft. Interval Bottom: 7362 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/18/2000 | Treatment Summary: | SET CIBP @ 7480'. PLACE 1 SXS OF CMT ON PLUG. PERF'D THE NIOBRARA FROM 7220-7250;, 7260-7290, AND 7336-7362' W/ 4 SPF. FRAC'D W/ 451,570 GAL SLICKWATER AND 200,420# 20/40 SAND. FLOW BACK FRAC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 3 | BBLS_OIL | 15 | CALC_BBLS_H2O | 3 | CALC_BBLS_OIL | 15 | CALC_GOR | 2000 | CALC_MCF_GAS | 30 | CASING_PRESS | 1050 | MCF_GAS | 30 | TUBING_PRESS | 815 |
| Perforation Data: | Interval Top: | 7220 ft. | # Of Holes: | 344 | Interval Bottom: | 7362 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 287 |
Total Gas Produced (MCF) | 7731 |
GOR | 26937 |
GOR Determination | MCFE |
Average BOE per Day | 4.429 |
Average MCFE per Day | 25.684 |
Federal Financial Assurance | i | |
|
|