Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19598
Well Classification: GW Status: PR - 6/1/2020
Well Name/No:DEVORE #32-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2020
FacilityID:251794LocationID:330772
County:WELD #123Location:SWNE 34 3N66W 6
Field:WATTENBERG - #90750Elevation:4980 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1920FNL  1805 FELLat/Long: 40.183577 / -104.760229Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.183647 / -104.760189Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2020             Measured TD: 8020 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2020
Wellbore Permit
Permit #:19980356 Expiration Date:12/15/2000
Proposed Depth/Form:8200 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-407 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:5/3/2004
Spud Date:4/24/1998Spud Date Is:ACTUAL
Measured TD:8020 ft.Measured PB depth:7981 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED NEUTRON LITHO DENSITY; ARRAY INDUCTION W/ LINEAR CORRELATION; GR CEMENT BOND VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 727 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 727 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8014 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6720 ft., Bottom: 8014 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4434 ft.
SHANNON5059 ft.
NIOBRARA7232 ft.
CODELL7417 ft.
GREENHORN7479 ft.
GRANEROS7692 ft.
MOWRY7848 ft.
J SAND7861 ft.
SKULL CREEK7988 ft.

Formation JSND                     Formation Classification:  GW                     Status:  PR - 6/1/2020                  Interval Top: 7864 ft.    Interval Bottom: 7938 ft.

 Completed Information for Formation J SAND
1st Production Date:7/19/1998Choke Size:0.343 in.
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:5/3/2004
Treatment Summary:ORIGINAL COMPLETION: 171,318 GALS SATURN I 30#, 25# GEL & 550,050# 20-40 SAND, 1 PPG THRU 5 PPG. 2/00: SI FOR CODL COMPLETION W/ BP @ 7530' W/ 2 SXS SD ON TOP. 5/00: CM'D W/ CODL. 4/04: BP @ 7390' FOR NBRR COMPLETION & NB-CD CM. 5/04: CM'D W/ NB-CD
Tubing Size:2.375 in.Tubing Setting Depth:7855 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/19/1998Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 19
BBLS_OIL 7
CALC_BBLS_H2O 19
CALC_BBLS_OIL 7
CALC_GOR 95714
CALC_MCF_GAS 670
CASING_PRESS 430
MCF_GAS 70
TUBING_PRESS 220
Perforation Data:
Interval Top:7864 ft.# Of Holes:116
Interval Bottom:7938 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/13/2000                 Interval Top: 7416 ft.    Interval Bottom: 7434 ft.

 Completed Information for Formation CODELL
1st Production Date:2/19/2000Choke Size:0.343 in.
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:5/3/2004
Treatment Summary:ORIGINAL COMPLETION: FRAC WELL W/133,000 GALS VISTAR W/ 10,000# 100 MESH, 300,000# 20/40 FRAC SD 1/2 PPG THRU 4 PPG. 5/00: CM'D W/ JSND. 4/04: CBP # 7390' FOR NBRR COMPLETION. 5/04: CBP REMOVED & JSND-NB-CD CM'D.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/19/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 43
CALC_BBLS_H2O 11
CALC_BBLS_OIL 43
CALC_GOR 4047
CALC_MCF_GAS 174
CASING_PRESS 300
MCF_GAS 174
Perforation Data:
Interval Top:7416 ft.# Of Holes:36
Interval Bottom:7434 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 5/13/2000                 Interval Top: 7416 ft.    Interval Bottom: 7938 ft.

 Completed Information for Formation J-CODELL
1st Production Date:5/13/2000Choke Size: 
Formation Name:J-CODELLCommingled:
Production Method:PLUNGER
Open Hole Completion:
Formation Treatment
Treatment Date:5/3/2004
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7853 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/13/2000Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 26
CALC_BBLS_H2O 13
CALC_BBLS_OIL 26
CALC_GOR 16731
CALC_MCF_GAS 435
CASING_PRESS 430
MCF_GAS 435
TUBING_PRESS 250
Perforation Data:
Interval Top:7416 ft.# Of Holes:152
Interval Bottom:7938 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/23/2009                Interval Top: 7220 ft.    Interval Bottom: 7938 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/3/2004
Treatment Summary:JSND-NBRR-CDL COMMINGLE, DRILLED OUT CBP@ 7490' AND 7370' TO COMMINGLE THE JSND-MBRR-CDL. 10/16/09.
Tubing Size:2.375 in.Tubing Setting Depth:7813 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/23/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 58
BTU_GAS 1205
CALC_BBLS_H2O 28
CALC_BBLS_OIL 58
CALC_GOR 5293
CALC_MCF_GAS 307
CASING_PRESS 956
GRAVITY_OIL 53
MCF_GAS 307
TUBING_PRESS 453
Perforation Data:
Interval Top:7220 ft.# Of Holes:272
Interval Bottom:7938 ft.Hole Size:0.48 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 6/1/2020                  Interval Top: 7220 ft.    Interval Bottom: 7434 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/3/2004
Treatment Summary:NBRR-CDL REFRAC AND RECOMPLETION, SET CBP@ 7490'. 9/10/09. RE-FRAC'D THE CODELL WITH 249,087# 20/40 SAND IN 80,220 GALS VISTAR 24XLF. STAGED SAND FROM 1# TO 5#. 9/15/09. TOTAL CODELL GELLED FLUID 113,610 GALS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 62
CALC_BBLS_H2O 28
CALC_BBLS_OIL 62
CALC_GOR 2581
CALC_MCF_GAS 160
CASING_PRESS 360
MCF_GAS 160
Perforation Data:
Interval Top:7220 ft.# Of Holes:156
Interval Bottom:7434 ft.Hole Size:0.48 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)9812
GOR
GOR DeterminationMCFE
Average BOE per Day4.634
Average MCFE per Day26.924

 Federal Financial Assurance  i 

 Tribal Well  i No