|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 3/4/2025 Measured TD: 8042 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 3/4/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 4/27/2012 | | Proposed Depth/Form: | 8042 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2NW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 617 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 475, Top: , Bottom: 617 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8028 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 235, Top: 6840 ft., Bottom: 8028 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4817 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 285, Top: 3980 ft., Bottom: 4817 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/23/1998 | | Spud Date: | 4/7/1998 | Spud Date Is: | ACTUAL | | Measured TD: | 8042 ft. | Measured PB depth: | 8004 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DUAL INDUCTION, COMPENSATED DENSITY, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 617 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 0 ft., Bottom: 617 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8028 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 235, Top: 6840 ft., Bottom: 8028 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4817 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 285, Top: 3980 ft., Bottom: 4817 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4461 ft. | | | | | SHANNON | 4912 ft. | | | | | NIOBRARA | 7170 ft. | | | | | FORT HAYS | 7411 ft. | | | | | CODELL | 7433 ft. | | | | | J SAND | 7867 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 3/4/2025 Interval Top: 7869 ft. Interval Bottom: 7921 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/27/1998 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/17/2010 | | Treatment Summary: | JSND under plug at 7985' | | Formation Treatment | | Treatment Date: | 4/23/1998 | | Treatment Summary: | SEE SCAN DOCUMENT 69591 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 3 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 407667 | | CALC_MCF_GAS | 1223 | | CASING_PRESS | 900 | | MCF_GAS | 1223 | | TUBING_PRESS | 690 |
| | Perforation Data: | | Interval Top: | 7869 ft. | # Of Holes: | 88 | | Interval Bottom: | 7921 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/4/2025 Interval Top: 7172 ft. Interval Bottom: 7450 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/10/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/6/2010 | | Treatment Summary: | NB Perf: 7172-7290 Holes: 60 Size: .42
Frac NB w/ 252 gal 15% HCl & 222,852 gal Slickwater w/ 201,480# 30/50 sand, 4,000# SB Excel sand
CD Perf: 7434-7450 Holes: 64 Size: .40
Frac CD w/ 204,792 gal Slickwater w/ 150,020# 30/50 sand, 4,000# SB Excel sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/14/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 56 | | BTU_GAS | 1161 | | CALC_BBLS_OIL | 56 | | CALC_GOR | 4750 | | CALC_MCF_GAS | 266 | | CASING_PRESS | 667 | | GRAVITY_OIL | 49 | | MCF_GAS | 266 |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 124 | | Interval Bottom: | 7450 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/04/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|