|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/9/2024 Measured TD: 8100 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/9/2024 | Wellbore Permit | | Permit #: | 20051378 | Expiration Date: | 4/28/2006 | Proposed Depth/Form: | 7517 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 4/1/2006 | Spud Date: | 5/23/1999 | Spud Date Is: | ACTUAL | Measured TD: | 8100 ft. | Measured PB depth: | 8076 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DENS,NEU,GR,IND,CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 748 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 525, Top: 0 ft., Bottom: 748 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8093 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 7140 ft., Bottom: 8093 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5148 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 243, Top: 4100 ft., Bottom: 5148 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4415 ft. | | N | N | SHANNON | 4890 ft. | | N | N | NIOBRARA | 7210 ft. | | N | N | CODELL | 7500 ft. | | N | N | J SAND | 7930 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/9/2024 Interval Top: 7935 ft. Interval Bottom: 7973 ft. Completed Information for Formation J SAND | 1st Production Date: | 6/28/1999 | Choke Size: | 0.312 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/1/2006 | Treatment Summary: | 228,732 GALS FLUID & 580,320# 20/40 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7919 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/28/1999 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 14 | BBLS_OIL | 5 | CALC_BBLS_H2O | 14 | CALC_BBLS_OIL | 5 | CALC_GOR | 118000 | CALC_MCF_GAS | 588 | CASING_PRESS | 350 | MCF_GAS | 588 | TUBING_PRESS | 220 |
| Perforation Data: | Interval Top: | 7935 ft. | # Of Holes: | 60 | Interval Bottom: | 7973 ft. | Hole Size: | 0.34 in. |
|
Formation CODL Formation Classification: GW Status: AB - 1/9/2024 Interval Top: 7499 ft. Interval Bottom: 7517 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/1/2006 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/28/2005 | Treatment Summary: | CODELL FRAC'D W/134,442 GALS SILVERSTIM W/28# GEL & 263,060 # 20/40 OTTAWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 5 | BBLS_OIL | 30 | BTU_GAS | 1220 | CALC_BBLS_H2O | 5 | CALC_BBLS_OIL | 30 | CALC_GOR | 3100 | CALC_MCF_GAS | 93 | CASING_PRESS | 1000 | GRAVITY_OIL | 50 | MCF_GAS | 93 | TUBING_PRESS | 225 |
| Perforation Data: | Interval Top: | 7499 ft. | # Of Holes: | 72 | Interval Bottom: | 7517 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 4/18/2006 Interval Top: 7499 ft. Interval Bottom: 7942 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 4/1/2006 | Choke Size: | 0.469 in. | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/28/2005 | Treatment Summary: | COMMINGLED CODEL/J SAND. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7921 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/18/2006 | Test Method: | FLOWING | Hours Tested: | 4 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 5 | CALC_BBLS_H2O | 12 | CALC_BBLS_OIL | 30 | CALC_GOR | 32000 | CALC_MCF_GAS | 960 | CASING_PRESS | 740 | MCF_GAS | 160 | TUBING_PRESS | 740 |
| Perforation Data: | Interval Top: | 7499 ft. | # Of Holes: | 86 | Interval Bottom: | 7942 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 01/09/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|