Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19203
Well Classification: GW Status: PA - 8/1/2025
Well Name/No:SCHANK J #35-08
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:63706
Facility Status:PAStatus Date8/1/2025
FacilityID:251400LocationID:330495
Municipality/County:EVANS / WELD #123Location:SENE 35 5N66W 6
Field:WATTENBERG - #90750Elevation:4661 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2214FNL  539 FELLat/Long: 40.357045 / -104.736990Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.357040 / -104.736730Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 8/1/2025             Measured TD: 7282 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 8/1/2025
Wellbore Permit
Permit #:960571 Expiration Date:8/19/1997
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: S2NE

Wellbore Completed
Completion Date:10/5/1996
Measured TD:7282 ft.Measured PB depth:7192 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 317 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 317 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7270 ft., Weight: 7.7 , Citings Type: ACTUAL
Cement:Sacks: 165, Top: 6370 ft., Bottom: 7270 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4370 ft.
NIOBRARA6798 ft.
FORT HAYS7107 ft.
CODELL7130 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/11/2010                 Interval Top: 7131 ft.    Interval Bottom: 7147 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/17/2006
Treatment Summary:CODELL UNDER SAND PLUG @ 6992'
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7131 ft.# Of Holes:42
Interval Bottom:7147 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/1/2025                  Interval Top: 6814 ft.    Interval Bottom: 7147 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/5/1996
Treatment Summary:COMMINGLE CODELL & NIOBRARA
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/9/2006Test Method:FLOWING
Hours Tested:8Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 5
BTU_GAS 1
CALC_BBLS_H2O 2
CALC_BBLS_OIL 8
CALC_GOR 31600
CALC_MCF_GAS 282
CASING_PRESS 550
GRAVITY_OIL 66
MCF_GAS 158
TUBING_PRESS 300
Perforation Data:
Interval Top:6814 ft.# Of Holes:294
Interval Bottom:7147 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/4/2006                  Interval Top: 6814 ft.    Interval Bottom: 6958 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/19/2006Choke Size:0.250 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/17/2006
Treatment Summary:RE-FRAC'D NIOBRARA W/69,972 GALS SLICKWATER; 68,154 GALS SILVERSTIM 28# GEL; 238,000# 20/40 OTTAWA SAND & 12,000# 12/20 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2006Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 5
BTU_GAS 1120
CALC_BBLS_H2O 8
CALC_BBLS_OIL 5
CALC_GOR 28600
CALC_MCF_GAS 143
CASING_PRESS 150
GRAVITY_OIL 65
MCF_GAS 143
Perforation Data:
Interval Top:6814 ft.# Of Holes:252
Interval Bottom:6958 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/01/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)115
Total Gas Produced (MCF)5111
GOR44443
GOR DeterminationMCFE
Average BOE per Day2.723
Average MCFE per Day15.775

 Federal Financial Assurance  i 

 Tribal Well  i No