|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/15/2019 Measured TD: 7690 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/15/2019 | | Wellbore Permit | | | Permit #: | 19960104 | Expiration Date: | 8/16/1996 | | Proposed Depth/Form: | 7670 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 3/18/1996 | | Spud Date: | 3/7/1996 | Spud Date Is: | ACTUAL | | Measured TD: | 7690 ft. | Measured PB depth: | 7636 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL-GR, FDC-GR & CBL | | Casing: | String Type: SURF, Hole Size: 9.875 in., Size: , Top: 0 ft., Depth: 673 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 673 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 6.25 in., Size: 3.5 in., Top: 0 ft., Depth: 7687 ft., Weight: 7.7 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 6810 ft., Bottom: 7687 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5768 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 4068 ft., Bottom: 5768 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 384 ft. | | N | N | | SUSSEX | 4220 ft. | | N | N | | SHANNON | 4854 ft. | | N | N | | NIOBRARA | 7242 ft. | | N | N | | FORT HAYS | 7515 ft. | | N | N | | CODELL | 7535 ft. | | N | N | | CARLILE | 7558 ft. | | N | N | | GREENHORN | 7604 ft. | | N | N |
Formation NB-CD Formation Classification: GW Status: AB - 1/15/2019 Interval Top: 7371 ft. Interval Bottom: 7547 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/18/1996 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/18/1996 | | Treatment Summary: | ACIDIZED W/ 1,000 GALS HCL, FRAC W/ 280,000# 20-40 SAND IN 62,832 GALS FLUID |
| | Tubing Size: | 1.5 in. | Tubing Setting Depth: | 7226 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/19/1996 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 37 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 37 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 110 | | MCF_GAS | 110 |
| | Perforation Data: | | Interval Top: | 7371 ft. | # Of Holes: | 8 | | Interval Bottom: | 7547 ft. | Hole Size: | 0.24 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/15/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|