Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18998
Well Classification: OW Status: PA - 2/9/2022
Well Name/No:CAPEHART #41-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:59958
Facility Status:PAStatus Date2/9/2022
FacilityID:251195LocationID:330381
County:WELD #123Location:NENE 29 6N64W 6
Field:WATTENBERG - #90750Elevation:4693 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  660 FELLat/Long: 40.462295 / -104.567156Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.462420 / -104.566640Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/9/2022             Measured TD: 7078 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/9/2022
Wellbore PermitDRIFTED
Permit #:950753 Expiration Date:3/28/1996
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:N/A
Spud Date:12/3/1995Spud Date Is:ACTUAL
Measured TD:7078 ft.Measured PB depth:7048 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 323 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 323 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 323 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7078 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 6144 ft., Bottom: 7078 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7078 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3930 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 195, Top: 3300 ft., Bottom: 3930 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 920 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 273, Top: 0 ft., Bottom: 920 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 900 ft., Bottom: 970 ft., Sacks: 273, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
PARKMAN3670 ft.
NIOBRARA6566 ft.
FORT HAYS6841 ft.
CODELL6890 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/3/2017                  Interval Top: 6893 ft.    Interval Bottom: 6902 ft.

 Completed Information for Formation CODELL
1st Production Date:12/22/1995Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/10/2017Treatment End Date:N/A
Treatment Summary:6/28/2004 Re-Perforated the Codell from 6893-6899’ with 23 gram charge, .42 hole and 20.45 penetration. Each was 1 spf.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6893 ft.# Of Holes:27
Interval Bottom:6902 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/9/2022                  Interval Top: 6725 ft.    Interval Bottom: 6902 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/1/2004Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/29/2004
Treatment Summary:Frac'd Niobrara-Codell with 334,080# 20/40 white sand and 16,000# resin coated sand and 3728 bbls of fluid.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6725 ft.# Of Holes:34
Interval Bottom:6902 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/10/2017                 Interval Top: 6725 ft.    Interval Bottom: 6731 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/1/2004Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6725 ft.# Of Holes:7
Interval Bottom:6731 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/09/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No