Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18846
Well Classification: GW Status: PA - 4/28/2015
Well Name/No:HSR-RADEMACHER #12-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:64618
Facility Status:PAStatus Date4/28/2015
FacilityID:251043LocationID:336313
County:WELD #123Location:NWSW 30 3N67W 6
Field:WATTENBERG - #90750Elevation:4856 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FSL  833 FWLLat/Long: 40.195336 / -104.938945Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.195530 / -104.938910Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 4/28/2015             Measured TD: 7337 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 4/28/2015
Wellbore Permit
Permit #:950012 Expiration Date:7/4/1995
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2SW

Wellbore Completed
Completion Date:3/3/1995
Measured TD:7337 ft.Measured PB depth:7298 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 742 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 742 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7336 ft., Weight: 7.7 , Citings Type: ACTUAL
Cement:Sacks: 445, Top: 6430 ft., Bottom: 7336 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 185, Top: 3686 ft., Bottom: 5000 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS100 ft.
SUSSEX4116 ft.
SHANNON4634 ft.
NIOBRARA6921 ft.
FORT HAYS7168 ft.
CODELL7189 ft.
CARLILE7210 ft.
GREENHORN7266 ft.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/28/2015                 Interval Top: 6985 ft.    Interval Bottom: 7210 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/22/2010Choke Size:0.750 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/11/2010
Treatment Summary:NB PERF 6985-6986 HOLES 2 SIZE 0.31 CD PERF 7190-7210 HOLES 50 SIZE 0.31 CD TREATED W/ 118,112 GAL DYNAFLOW 2 / 262,140# 20/40 & 4,000# 20/40 SUPERLC.
Tubing Size:2.0625 in.Tubing Setting Depth:7174 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/17/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1273
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 4
CASING_PRESS 745
GRAVITY_OIL 46
TUBING_PRESS 361
Perforation Data:
Interval Top:6985 ft.# Of Holes:52
Interval Bottom:7210 ft.Hole Size:0.31 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/28/2015
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No