|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2023 Measured TD: 7902 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2023 | | Wellbore Permit | | | Permit #: | 20010014 | Expiration Date: | 11/29/2001 | | Proposed Depth/Form: | 7900 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: W2 |
| | |
| Wellbore Completed | | Completion Date: | 2/21/2001 | | Spud Date: | 10/8/1994 | Spud Date Is: | ACTUAL | | Measured TD: | 7902 ft. | Measured PB depth: | 7863 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/FDC/GR/SP; CBL; GR/CCL | | Log Types: | CDCGR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 538 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 538 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7408 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 6344 ft., Bottom: 7408 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3 in., Size: 2.375 in., Top: 7344 ft., Depth: 7891 ft., Weight: 4.5 , Citings Type: ACTUAL | | Cement: | Sacks: 30, Top: 7344 ft., Bottom: 7891 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4212 ft. | | N | N | | NIOBRARA | 7016 ft. | | N | N | | CODELL | 7286 ft. | | N | N | | J SAND & SHANNON | 7730 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 10/1/2023 Interval Top: 7734 ft. Interval Bottom: 7771 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/27/2001 | Choke Size: | 0.281 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/21/2001 | | Treatment Summary: | FRAC'D J SAND W/ 561,280# 20/40 MESH; 242,160 GAL. GELLED FLUID |
| | Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 7344 ft. | | Tubing Packer Depth: | 7344 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/1/2001 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 8 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 67125 | | CALC_MCF_GAS | 537 | | GRAVITY_OIL | 60 | | MCF_GAS | 537 | | TUBING_PRESS | 820 |
| | Perforation Data: | | Interval Top: | 7734 ft. | # Of Holes: | | | Interval Bottom: | 7771 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/16/2001 Interval Top: 7031 ft. Interval Bottom: 7771 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/11/2001 | Choke Size: | 0.281 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/21/2001 | | Treatment Summary: | COMMINGLED JSAND W/ NB-CD |
| | Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 7335 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/16/2001 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 17 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 22529 | | CALC_MCF_GAS | 383 | | CASING_PRESS | 450 | | GRAVITY_OIL | 60 | | MCF_GAS | 383 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7031 ft. | # Of Holes: | | | Interval Bottom: | 7771 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: PR - 10/1/2023 Interval Top: 7031 ft. Interval Bottom: 7297 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/25/1994 | Choke Size: | 0.187 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/21/2001 | | Treatment Summary: | 7031-7089' ; 7288-7297' 90,000 GAL SATURN III 40/35/30 HT/LPH/D CROSSLINKED GEL CONTAINING 10,000# 100 MESH & 325,000# 20/40. |
| | Tubing Size: | 2.062 in. | Tubing Setting Depth: | 7281 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/7/1994 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 59 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 59 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 550 | | GRAVITY_OIL | 50.4 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 7031 ft. | # Of Holes: | 14 | | Interval Bottom: | 7297 ft. | Hole Size: | 0.31 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 83 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.041 |
| Average MCFE per Day | 0.228 |
| Federal Financial Assurance | i | |
|
|