Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18246
Well Classification: OW Status: PA - 5/8/2025
Well Name/No:HSR-KARICH #1-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/8/2025
FacilityID:250443LocationID:330042
County:WELD #123Location:NENE 32 3N66W 6
Field:WATTENBERG - #90750Elevation:4919 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:699FNL  505 FELLat/Long: 40.186737 / -104.793241Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.186235 / -104.793423Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 5/8/2025             Measured TD: 7542 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 5/8/2025
Wellbore Permit
Permit #:19940518 Expiration Date:10/29/1994
Proposed Depth/Form:7555 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:6/30/1994
Spud Date:5/25/1994Spud Date Is:ACTUAL
Measured TD:7542 ft.Measured PB depth:7451 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/SFL/GR; CBL; CDEN/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 567 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 535, Top: 0 ft., Bottom: 567 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 2.875 in., Top: 0 ft., Depth: 7528 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 535, Top: 6513 ft., Bottom: 7528 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 2.875 in., Top: 0 ft., Depth: 7528 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 3920 ft., Bottom: 5296 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS100 ft.NN
SUSSEX4438 ft.NN
NIOBRARA7112 ft.NN
FORT HAYS7361 ft.NN
CODELL7385 ft.NN
CARLILE7393 ft.NN
GREENHORN7443 ft.NN

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 5/8/2025                  Interval Top: 7172 ft.    Interval Bottom: 7392 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/30/1994Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/30/1994
Treatment Summary:7112-7393' FRAC'D W/ 412,100# 20/40 MESH SAND + 105,672 GAL GELLED FLUID, 1994. // FRAC'D W/120,022 GALS GELLED FLUID; 261 20/40 UNIMIN -BRIGHTON.PERF CODELL FROM 7388 TO 7398., 2002.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 12
CALC_GOR 6417
CASING_PRESS 472
MCF_GAS 77
TUBING_PRESS 249
Perforation Data:
Interval Top:7172 ft.# Of Holes:11
Interval Bottom:7392 ft.Hole Size:0.31 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/08/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No