|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 4/30/2019 Measured TD: 7408 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 4/30/2019 | | Wellbore Permit | | | Permit #: | 19931794 | Expiration Date: | 3/31/1994 | | Proposed Depth/Form: | 7291 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SE |
| | |
| Wellbore Completed | | Completion Date: | 1/31/1994 | | Spud Date: | 1/13/1994 | Spud Date Is: | ACTUAL | | Measured TD: | 7408 ft. | Measured PB depth: | 7342 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIFL/GR; CDL/GR; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 808 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7364 ft., Weight: 7.7 , Citings Type: ACTUAL | | Cement: | Sacks: 335, Top: 3737 ft., Bottom: , Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6186 ft., Bottom: , Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3862 ft. | | N | N | | SUSSEX | 4271 ft. | | N | N | | NIOBRARA | 6887 ft. | 7168 ft. | N | N | | FORT HAYS | 7168 ft. | 7190 ft. | N | N | | CODELL | 7190 ft. | 7206 ft. | N | N |
Formation CODL Formation Classification: GW Status: CM - 3/28/2006 Interval Top: 7193 ft. Interval Bottom: 7202 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/5/1994 | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/31/1994 | | Treatment Summary: | ACIDIZE W/1000 GALS 7.5% HCI; THEN FRAC W/93,250 GAL WTR W/CLAYFIX II W/35# GUAR & 424,500# 20/40 MESH SAND,2/1994. // REPERF CODL 7192-7204' (48 HOLES). REFRAC CODL W/131,460 GAL VISTAR 28# GEL & 246,320# 20/40 SAND, 11/13/2003. |
| | Tubing Size: | 2.062 in. | Tubing Setting Depth: | 7147 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7193 ft. | # Of Holes: | 9 | | Interval Bottom: | 7202 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: GW Status: TA - 4/30/2019 Interval Top: 6954 ft. Interval Bottom: 7204 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/5/1994 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/9/2006 | | Treatment Summary: | COMMINGLED CODELL/NIOBRARA |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 8 | | CALC_GOR | 11250 | | CASING_PRESS | 580 | | MCF_GAS | 90 | | TUBING_PRESS | 340 |
| | Perforation Data: | | Interval Top: | 6954 ft. | # Of Holes: | 156 | | Interval Bottom: | 7204 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 3/28/2006 Interval Top: 6954 ft. Interval Bottom: 6972 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/5/1994 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/9/2006 | | Treatment Summary: | NBRR REFRAC'D W/70,056 GALS OF SLICKWATER FOLLOWED BY 97,482 GALS OF SLIVERSTIM 28LBS & 238,200# OF 20/40 OTTAWA SAND + 12,000LBS SB EXCEL 12/20 PROPPANT (TOTAL PROPPANT = 250,200#). NO PRIOR TREATMENT RECORD FOUND FOR NBRR. NO TEST. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6954 ft. | # Of Holes: | 108 | | Interval Bottom: | 6972 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA) | Y | Last Production 04/30/2017 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|