|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/10/2025 Measured TD: 7963 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/10/2025 | | Wellbore Permit | | | Permit #: | 19980950 | Expiration Date: | 10/22/1999 | | Proposed Depth/Form: | 7940 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NE |
| | |
| Wellbore Completed | | Completion Date: | 3/3/1999 | | Spud Date: | 12/13/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 7963 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL - FDC/GR/SP - CBL/GR/CCL | | Log Types: | CDCNGR, ISGR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 527 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 527 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7500 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 6532 ft., Bottom: 7500 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7500 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 3570 ft., Bottom: 4590 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7451 ft., Depth: 7961 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 7451 ft., Bottom: 7961 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4506 ft. | | N | N | | NIOBRARA | 7076 ft. | | N | N | | CODELL | 7360 ft. | | N | N | | J SAND | 7800 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/10/2025 Interval Top: 7802 ft. Interval Bottom: 7840 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/6/1999 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/3/1999 | | Treatment Summary: | FRAC'D J SAND W/560,860# 20/40 MESH; 237,892 GAL GELLED FLUID. NO TEST. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7802 ft. | # Of Holes: | | | Interval Bottom: | 7840 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/18/2003 Interval Top: 7142 ft. Interval Bottom: 7840 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/27/2003 | Choke Size: | 0.406 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/3/1999 | | Treatment Summary: | COMMINGLED JNBCD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7793 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/18/2003 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 7 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 28571 | | CALC_MCF_GAS | 200 | | CASING_PRESS | 600 | | GRAVITY_OIL | 60 | | MCF_GAS | 200 | | TUBING_PRESS | 525 |
| | Perforation Data: | | Interval Top: | 7142 ft. | # Of Holes: | | | Interval Bottom: | 7840 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/10/2025 Interval Top: 7142 ft. Interval Bottom: 7373 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/5/1994 | Choke Size: | 0.406 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | PLUNGER | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/3/1999 | | Treatment Summary: | 7142-7273' 112,434 GAL GEL W/10,000# 100 MESH SAND; 325,000# 20/40 SAND. ATP 4400# @ 38 BPM, ISDP 3250#, 1994. // REFRAC NB-CD W/171,500# 20/40 MESH; 8,5118 GAL GELLED FLUID. REPERF CODL FROM 7363'-7373',2002. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7337 ft. | | Tubing Packer Depth: | 7485 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/5/2002 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 4333 | | CALC_MCF_GAS | 52 | | CASING_PRESS | 500 | | GRAVITY_OIL | 60 | | MCF_GAS | 52 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 7142 ft. | # Of Holes: | | | Interval Bottom: | 7373 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/10/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|