|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/10/2024 Measured TD: 7906 ft. Vertical TD: 7293 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/10/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 19931157 | Expiration Date: | 2/4/1994 | | Bottom Hole Location: | Sec:15 Twp: 3N 65W | Footage: 739 FNL 2085 FWL | | Proposed Depth/Form: | 7899 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2SW | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 493-2 , Unit Acreage: 80, Drill Unit: N2SW |
| | |
| Wellbore Completed | | Completion Date: | 10/19/1993 | | Spud Date: | 9/7/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 7906 ft. | Measured PB depth: | 7390 ft. | | True Vertical TD: | 7293 ft. | True Vertical PB depth: | | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 774 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 774 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7896 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 455, Top: 4284 ft., Bottom: 7896 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4924 ft. | | N | N | | NIOBRARA | 7473 ft. | | N | N |
Formation NBRR Formation Classification: GW Status: AB - 6/10/2024 Interval Top: 7474 ft. Interval Bottom: 7645 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/19/1993 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/19/1993 | | Treatment Summary: | 7474-7645' FRAC'D W/ 228,000# 20/40 MESH SAND + 65,542 GAL. GELLED FLUID. NBRR WAS PLUGGED, NOW OPEN/PRODUCING AS OF MARCH,1997. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7474 ft. | # Of Holes: | 19 | | Interval Bottom: | 7645 ft. | Hole Size: | 0.38 in. |
|
Formation NB-SX Formation Classification: GW Status: CM - 3/7/1997 Interval Top: 5021 ft. Interval Bottom: 7645 ft.| Completed Information for Formation NIOBRARA-SUSSEX | | 1st Production Date: | 3/1/1997 | Choke Size: | 0.375 in. | | Formation Name: | NIOBRARA-SUSSEX | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/19/1993 | | Treatment Summary: | PUSHED DOWN BRIDGE PLUG & COMMINGLED NIOBRARA & SUSSEX. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7443 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/7/1997 | Test Method: | FLOWING | | Hours Tested: | 10 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 29 | | CALC_GOR | 16417 | | CALC_MCF_GAS | 473 | | CASING_PRESS | 400 | | GRAVITY_OIL | 60 | | MCF_GAS | 197 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 5021 ft. | # Of Holes: | 34 | | Interval Bottom: | 7645 ft. | Hole Size: | 0.38 in. |
|
Formation SUSX Formation Classification: GW Status: AB - 6/10/2024 Interval Top: 5021 ft. Interval Bottom: 5048 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 10/19/1993 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/19/1993 | | Treatment Summary: | 5021-5048' FRAC'D W/249,100# 16/30 MESH; 20,300# 12/20 AcFRAC CR-5000 + 73,504 GAL. GELLED FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 11 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 22818 | | CASING_PRESS | 900 | | GRAVITY_OIL | 60 | | MCF_GAS | 251 | | TUBING_PRESS | 800 |
| | Perforation Data: | | Interval Top: | 5021 ft. | # Of Holes: | 15 | | Interval Bottom: | 5048 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/10/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|