Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17274
Well Classification: GW Status: PA - 8/18/2021
Well Name/No:DECHANT #D 7-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:59686
Facility Status:PAStatus Date8/18/2021
FacilityID:249471LocationID:329386
County:WELD #123Location:NWSE 7 3N64W 6
Field:WATTENBERG - #90750Elevation:4803 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1990FSL  1988 FELLat/Long: 40.237867 / -104.591485Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.237995 / -104.590873Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/17/2021             Measured TD: 7267 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/17/2021
Wellbore Permit
Permit #:19931090 Expiration Date:1/6/1995
Proposed Depth/Form:7267 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2SE
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: 493-2 , Unit Acreage: 80, Drill Unit: N2SE

Wellbore Completed
Completion Date:10/27/1993
Spud Date:9/4/1993Spud Date Is:ACTUAL
Measured TD:7267 ft.Measured PB depth:7191 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:CD, DIL, CBL-CCL-GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 622 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 622 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7246 ft., Weight: 7.7 , Citings Type: ACTUAL
Cement:Sacks: 156, Top: 6228 ft., Bottom: 7246 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4650 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 284, Top: 3617 ft., Bottom: 4650 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4381 ft.
NIOBRARA6786 ft.
CODELL7025 ft.

Formation CODL                     Formation Classification:  GW                     Status:  AB - 8/18/2021                 Interval Top: 7024 ft.    Interval Bottom: 7034 ft.

 Completed Information for Formation CODELL
1st Production Date:10/27/1993Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/24/2019Treatment End Date:N/A
Treatment Summary:5/18/2008: Codell Refrac 7024' - 7034', 40 shots, 0.27 diamteter, 1992 bbls slurry, 89,244 lbs proppant
Total fluid used in treatment (bbls):1992Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):89244Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/27/1993
Treatment Summary:58,250 GAL APOLLO 1 W/ 153,000# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 10
CALC_BBLS_H2O 3
CALC_BBLS_OIL 30
CALC_GOR 3900
CALC_MCF_GAS 117
CASING_PRESS 925
MCF_GAS 39
Perforation Data:
Interval Top:7024 ft.# Of Holes:43
Interval Bottom:7034 ft.Hole Size:0.32 in.

Formation SUSX                     Formation Classification:  GW                     Status:  AB - 5/12/2008                 Interval Top: 4387 ft.    Interval Bottom: 4421 ft.

 Completed Information for Formation SUSSEX
1st Production Date:8/18/1994Choke Size: 
Formation Name:SUSSEXCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/27/1993
Treatment Summary:88,788 GAL YF100 W/ 19,060# 12/20 & 218,660# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 6
CALC_GOR 36667
CASING_PRESS 900
MCF_GAS 220
TUBING_PRESS 875
Perforation Data:
Interval Top:4387 ft.# Of Holes:14
Interval Bottom:4421 ft.Hole Size:0.32 in.

Formation SX-CD                   Formation Classification:  GW                   Status:  CM - 5/6/2020                  Interval Top: 4387 ft.    Interval Bottom: 7033 ft.

 Completed Information for Formation SUSSEX-CODELL
1st Production Date:1/9/1995Choke Size:0.250 in.
Formation Name:SUSSEX-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.06 in.Tubing Setting Depth:7020 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/16/1995Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 11
CALC_GOR 11818
CASING_PRESS 900
MCF_GAS 130
TUBING_PRESS 850
Perforation Data:
Interval Top:4387 ft.# Of Holes:47
Interval Bottom:7033 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/18/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No